HomeMy WebLinkAboutRESOLUTION NO. 2024-75RESOLUTION NO. 2024-75
RESOLUTION TO ACCEPT THE WORK PERFORMED BY MW COLE
CONSTRUCTION, APPROVE AN ACCOUNTING CHANGE ORDER,
AND APPROVE THE FINAL PAYMENT FOR THE 2023 ELEVATED
WATER STORAGE TANK PAINTING, MAINTENANCE, & REPAIRS
PROJECT
WHEREAS, the City Council of Fairfax, Iowa lias contracted witll MW Cole
Consh-uction for the 2023 Elevated Water Storage Tank Painting, Maintena»ce, & Repairs
�roject; and
WHEREAS, Hall & Hall Engineers has recommended acceptance of the work
perfoi7l�ed by MW Cole Construction.
WHEREAS, prior to final payinent to MW Co1e Construction, the City Cou»cil of
Fairfax, Iowa shall impose set-offs totaling $91,491.72 against the contract ainount, as
described ii� the Accounting Change Order, due to dainages caused by MW Cole Constructio�i.
WHEREAS, the resultin� final payment to MW Cole Construction after imposing said
set-offs shall be in the amount of $5,483.28, as established in the Application for Payinent No.
2.
NOW, THEREFORE, BE IT RESOLVED, by the City Cowlcil of the City of Fairfax,
Iowa, to accept the work perforined by MW Cole Construction; approve the Accounting Change
Order establishing the total set-off ainount of $91,491.72; approve tlie Application for Payinent
No. 2 establishing the fii7a1 payment alnouzit of $5,483.28; and issue a check for $5,483.28.
BE IT FURTHER RESOLVED, by the Fairfax City Council of the City of Fairfax,
Iowa, that the Mayor and City Clerk/Treas�urer are hereby authorized and directed to execute
said resolution.
Passed and approved this 8tl' day of October, 2024.
AYES: Nurre, Daly, Wozniak, and Volk
NAYS: None
ABSENT: Waillwright
���,-r�-- �:2�,c..,�
ATTEST:
r� ,
Cy ithia Stimson, City Clerk/Treasurer
Jo Am1 Beer, Mayor
APPLICATION FOR PAYMENT
APPLICATION NO. 02
Project:
2023 Elevated Water Storage Tank Painting, Maintenance, & Repairs
in the City of Fairfax, Linn County, lowa
Contractor: MW Cole Construction
2989 Bonifay Path
The Viliages, FL 32163
Owner: City of Fairfax, lowa
Original Contract Amount: $343,500.00
Date: June 4, 2024
The Contractor noted above, in accordance with the provisions of the contract documents, hereby requests
approval of this application for payment on the following estimates of contract work completed: _
Original Contract Work Completed $ 343,500.00
Materials Stored On Site � -
Total Change Order Work Completed
Retainage
Damages (from Page 3)
Total
Less Previous Payments
Current Payment Due
$ -
0% $ -
$ (91,491.72)
$ 252,008.28
$ 246,525.00
$ 5,483.28
Page 1 of 3
cca€vY����ro�°� c�����i��a�io�:
�The undersigned Contractor certifies, to the best of the Contractor's knowiedge, that the above inforrr�ation and
estimat�:d v�lues af completed work covered on this Application for Payment have been completeu in accordance
with the provisions of the Contract Documents, that all amounts have been paid by the Contractar for work fnr
which previo��s Applications for Payment have been made and payments received from the Owner, and that the
current payment bitling requested is now due.
Contractor's Authorized Representative:
:
Date:
,. �..._-: �; ���_
In accordance with ihe provisions of the Cantract Documents and based on the Engineer's on-site observations of the work
included in this Application for Payment and based on the Engineer's review af this Application far Payment including the
accompanying supporting data, and to the best of the Engineer's knowledge, information and belief, the work included in this
Application for Payment is completed substantially in conformance with the Contract Documents and payment by the Owner
is hereby recommended.
Engineer's Authorized Representative:
�,.. �- � i
gy �F "_r �.._ .;� �------------ Date: �.�'i - `-� - �-`7�
CIiY �F FAI�FAX PAYMEN`T RECOiV1MENDATION:
Payment to the Contractor is hereby recommended based on the Application for Payment submitted by the
Gontractor and the Engineer's recommendation.
City of Fairfax Authorized Representative:
gy: C�(U �!n-r��� Date: �`�'� �
Page 2 of 3
APPLICATION FOR PAYMENT
APPLICATION NO. 02
Project 2023 E�evated Water Storage Tank Painting, Maintenance. 8 Repairs
in the City of Fairfax, Linn Counry, lowa
Conhactor: MW Cole Construction
Engineer: Hall & Hall Engineers, Inc. / Dixon Engineering. Inc.
Contract Amount $343,500-00
Date: June 4.2024
Scheduled W�rk Completed Total Completed Balance to
Item Item Description From Previous % Complete Retainage (0 %)
Value Application This Period & Stored to Date Finish
1 OverflowPipeDischargeModification $3,000.00 ��$3,000.00 � '.`. $0.00 ����� $3,000.00 �� 100.00% $0.00 0.00
2 Condensate Drain Line $4:000.00 $4:000.00 $0.00 $4:000.00 100.00 % $0.00 0.00
3 Wet Interior ladder Rungs $2,500.00 �$2,50000 � �.$O.OD '�����2,500.00 ' 100.00% $0.00 0.00
4 Cathodic Clips & Pressure Fitting $1.000.00 $1,000.00 $0.00 $1.000.00 100.00% �0 00 0.00
5 Roof Palnter's Railing �$9,000.00 ���. $9,000.00 `�� ��$0.00 '�� $9,000.00 � 100.00% $0 00 0.00
6 Exterior Repaint w/Containment $200,000.00 $125,000.00 $75,000.00 $200:000.00 100_00% $0.00 0.00
� 7 Lettering �� ���$5,000.00 �'���$000 $8,000.00 �.��$8,000.00 100.00% $0.00 0.00
8 Wet Interior Repaint $95,000.00 $95,000.00 $0.00 $95:000.00 100.00 % $0.00 0.00
� 9 Dry Interior Partial Repain[ ' � �$20,000.00 ��I$20,000.00 ��'� � �$0.00 �����. $20,000.00 100.00% $0.00 0.00
10 Light Fixture Replacement $1,000.00 $0.00 $1,000.00 $1.000.00 100.00% $0.00 0.00
TOTAL $343,500.00 $259,500.00 $84,000.00 $343,500.00 100.00% $0.00 $0.00
DAMAGES
No. Description Units Quantit Unit Cost Total
Replace Damaged Cat-6 Cable up the Tower for radio system
1 (Work Compieted by City of Fairfax Confractor, Jetco Inc., on LS 1 $1,032.50 $1,032.50
12/15/23)
2 Repair Damaged Grass Areas (Work Completed by City of �S � $1,20922 $1:20922
Fairfax Staff on 5/17/24)
3 Repair Damaged Driveway ( Work �o be Completed by City of LS 1 $5,250.00 $5,250.00
Fairfax Contractor, Prairie Road Builders)
Contrect liquidated Damages.
4 Firsl 30 days after Substantial Completion Date of 10/20/23. DAYS 30 $1,000.00 $30,000.00
10/21/23 - 11/19/23
Contract Liquidated Damages.
Afier Ready for Final Payment Date of 11/19/23.
5 11/20/23 - 12/3/23 and 4/22/24 - 5/13/24. DAYS 36 $1,500.00 $54,000.00
Cumulative rate o( $1500/day based on $1000/day after
Substantial Completion Date plus $500/day after Ready for
Final Payment Date.
TOTAL $91,491.72
Page 3 of 3
ACCOUNTING CHANGE ORDER
PROJECT. 2023 Elevated Wafer Storage Tank Painting. Maintenance. & Repairs
DA i E�. October 4 2024
OWNER: Ciry oi Fairfax, IA
CONTRACTOR: MW Coie Consiruction
ENGWEFR� Hall8 Hall Engineers. Inc. / Dixon Engineering. Inc.
SET-OFF ADJUSTMENTS TO CONTRACT AMOUNT
NO. DESCRIPTION
� Replace Damaged Cat-6 Cable up the Tower for radio system (Work Completed by Ciry of Fairfax
Contractor, Jetco Inc., on 12/15/23; Paid for by Ciry of Fairfax)
z Repair Damaged Grass Areas (Work Completed by City of Fairfax Staff on 5/17/24; Paid for by City of
Fairfax)
3 Repair Damaged Driveway (Work Completed by Ciry of Fairfax Contraclor, Prairie Road Builders: Paid
for by City of Fairfax)
Contract Liquidated Damages.
4 First 30 days after Substantial Compleiion Date of 10/20/23.
10/21 /23 - 11 /19/23
Contracl Liquidated Damages.
Aiter Ready for Final Paymenl Date of 11/19/23.
5 11/20/23 - 12/3/23 and 4/22/24 - 5/13/24.
Cumulative rate of $1500/day based on $1000/day after Substanfial Completion Date plus $500/day af
Readv for Finai Pavment Dale.
UNIT
LS
LS
lS
SCHEDULE OFVA�UES
TY UNIT COST ADJ. AMOUNT
1 $1.032.50 $ (1,032.5
1 $120922 $ (1,2092
1 �5.250.00 $ (5,250.0
DAYS I 30 I $1.000.00 �`5
DAYS � 36 � $1.500.00 �$
TOTAL SET-OFF AMOUNT $ (91,491.72)
OWNER: CITY OF FAIRFAX
�� /� � � /
BY: i.._i �� (.���yL'�'"` ��r2llf
TITLE�. / ll � y Q 1�
DATE: • � �...-q..: O .�l`i
CONTRACTOR: MW COLE CONSTRUCTION
BY:
TITLE
DATE:
ENGINEER
BY:
TITLE:
DATE.
HALL & HALL ENGINEERS, INC.
�W j�;-�� -
10/4l2024
CONTRACT SUMMARY:
ORIGINALCONTRACTAMOUNT $ 343,500.00
TOTAL SET-OFF AMOUNT $ (91,491.72)
ADJUSTED CONTRACT AMOUNT $ 252,008.28