HomeMy WebLinkAboutRESOLUTION NO. 2023-49RESOLUTION NO. 2023-49
RESOLUTION AUTHORIZING A REIMBURSEMENT AGREEMENT
BETWEEN THE CITY OF FAIRFAX AND UNION PACIFIC
RAILROAD COMPANY
WHEREAS, the City of Fairfax, Iowa intends to make roadway improvements on
Vanderbilt Street at the Union Pacific Railroad crossing located inside the Union Pacific
Railroad Right-of-Way; and
WHEREAS, Union Pacific Railroad Company submitted their Reimbursement
Agreement form, which establishes the conditions of the reimbursement that the City of Fairfax
must make to the Union Pacific Railroad Company for their participation in the project
development.
WHEREAS, Hall & Hall Engineers recommends the Ciry of Fairfax execute the
Reimbursement Agreement with Union Pacific Railroad Company.
NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Fairfax,
Iowa, to enter into this Reimbursement Agreement with Union Pacific Railroad Company.
BE IT FURTHER RESOLVED, by the Fairfax City Council of the City of Fairfax,
Iowa, that the Mayor Pro Tempore and City Clerk/Treasurer are hereby authorized and directed
to execute said resolution.
Passed and approved this 25th day of April, 2023.
AYES: Nurre, Daly, Pacha, Volk, and Wainwright
NAYS: None
.�_ � �
� .�`°`
�� . �� ��
Marianne Wain ht, Mayor Pro Tempore
ATTEST:
�' i .f � ��A � l� ��, � � ��.+?, 1�i
Cynt ia Stimson, City Clerk/Treasurer
#_ ,n„
,�
,..:: x �. . .
,:..,. a .., . . .
,,. �.A �,�.... _ .
?.
UPRR REMS
Project 508978
REIMBURSEMENT AGREEMENT
PRELIMINARY ENGINEERING SERVICES
Effective Date:
Estimate: $25,000.00
THIS REIMBURSEMENT AGREEMENT (Agreement) is made and entered into as of the
EfFective Date, by and between UNION PACIFIC RAILROAD COMPANY, a Delaware
corporation (Railroad), and CITY OF FAIRFAX, IOWA (Agency).
RECITALS
A. Agency desires to initiate the project more particularly described on Exhibit A
attached hereto (Project).
B. The Project will affect Railroad's track and right of way at or near the Project area
more particularly described on Exhibit A.
C. Railroad agrees to collaborate with Agency on the conceptualization and
development of the Project in accordance with the terms and conditions of this Agreement.
AGREEMENT
NOW THEREFORE, the parties hereto agree as follows:
1. Railroad, and/or its representatives, at Agency's sole cost and expense, agrees to
perform (or shall cause a third-party consultant to perform on Railroad's behalfl the preliminary
engineering services work described on Exhibit B attached hereto (PE Work). Agency
acknowledges and agrees that: (a) Railroad's review of any Project designs, plans and/or
specifications, as part of the PE Work, is limited exclusively to potential impacts on existing and
future Railroad facilities and operations; (b) Railroad makes no representations or warranties as
to the validity, accuracy, legal compliance, or completeness of the PE Work; and (c) Agency's
reliance on the PE Work is at Agency's own risk.
2. Notwithstanding the Estimate (Estimate), Agency agrees to reimburse Railroad
and/or Railroad's third-party consultant, as applicable, for one hundred percent (100%) of all
actual costs and expenses incurred for the PE Work. During the performance of the PE Work,
Railroad will provide (and/or will cause its third-party consultant to provide) progressive billing to
Agency based on actual costs in connection with the PE Work. Within sixty (60) days after
completion of the PE Work, Railroad will submit (and/or will cause its third-party consultant to
submit) a final billing to Agency for any balance owed for the PE Work. Agency shall pay Railroad
(and/or its third-party consultant, as applicable) within thirty (30) days after Agency's receipt of
any progressive and final bills submitted for the PE Work. Bills will be submitted to the Agency
using the contact information provided on Exhibit C. Agency's obligation hereunder to reimburse
Railroad (and/or its third-party consultant, as applicable) for the PE Work shall apply regardless
whether Agency declines to proceed with the Project or Railroad elects not to approve the Project.
DocuSign Envelope ID: 7E2CF867-EOAA-4A6A-BC7F-A3874DEFF067
3, Agency acknowledges and agrees that Railroad may withhold its approval for the
Project for any reason in its sole discretion, including without limitation, impacts to Railroad's
safety, facilities, or operations. If Railroad approves the Project, Railroad will continue to work
with Agency to develop final plans and specifications, and prepare material and force cost
estimates for any Project related work performed by Railroad.
4. If the Project is approved by Railroad, Railroad shall prepare and forward to
Agency a Construction and Maintenance Agreement (C8M Agreement) which shall provide the
terms and conditions for the construction and ongoing maintenance of the Project. Unless
otherwise expressly set forth in the C&M Agreement, the construction and maintenance of the
Project shall be at no cost to Railroad. No construction work on the Project affecting Railroad's
property or operations shall commence until the C&M Agreement is finalized and executed by
Agency and Railroad.
5. Neither party shall assign this Agreement without the prior written consent of the
other party, which consent shall not be unreasonably withheld, conditioned, or delayed.
6. No amendment or variation of the terms of this Agreement shall be valid unless
made in writing and signed by the parties.
7. This Agreement sets forth the entire agreement between the parties regarding the
Project and PE Work. To the extent that any terms or provisions of this Agreement regarding the
PE Work are inconsistent with the terms or provisions set forth in any existing agreement related
to the Project, such terms and provisions shall be deemed superseded by this Agreement to the
extent of such inconsistency.
IN WITNESS WHEREOF, the parties hereto have duly executed this Agreement as of the
Effective Date.
C1TY OF FAIRFAX, �O1�J'A ` UNION PACIFIC RAILROAD COMPANY,
�� � ���"�'�.� ,� � / a Delaware Corporation
� f� +' DocuSignetl by:
�' ��
;
�,
� r % �' r,�,c.vis � : �t,c�Cusw�,
Signafure � �ig�i��9�'
)r�?i��u)Ct�;� Chris Keckeisen
'----�— Printed Name
(��� �;�,�� ���, ����,?}��,�� Manager I, Engineering — Public Projects
Title � � Title
2
3. Agency acknowledges and agrees that Railroad may withhold its approval for the
Project for any reason in its sole discretion, including without limitation, impacts to Railroad's
safety, facilities, or operations. If Railroad approves the Project, Railroad will continue to work
with Agency to develop final plans and specifications, and prepare material and force cost
estimates for any Project related work pertormed by Railroad.
4. If the Project is approved by Railroad, Railroad shall prepare and forward to
Agency a Construction and Maintenance Agreement (C&M Agreement) which shall provide the
terms and conditions for the construction and ongoing maintenance of the Project. Unless
otherwise expressly set forth in the C&M Agreement, the construction and maintenance of the
Project shall be at no cost to Railroad. No construction work on the Project affecting Railroad's
property or operations shall commence until the C&M Agreement is finalized and executed by
Agency and Railroad.
5. Neither party shall assign this Agreement without the prior written consent of the
other party, which consent shall not be unreasonably withheld, conditioned, or delayed.
6. No amendment or variation of the terms of this Agreement shall be valid unless
made in writing and signed by the parties.
7. This Agreement sets forth the entire agreement between the parties regarding the
Project and PE Work. To the extent that any terms or provisions of this Agreement regarding the
PE Work are inconsistent with the terms or provisions set forth in any existing agreement related
to the Project, such terms and provisions shall be deemed superseded by this Agreement to the
extent of such inconsistency.
IN WITNESS WHEREOF, the parties hereto have duly executed this Agreement as of the
Effective Date.
CITY OF FAIRFAX, IOWA<'` UNION PACIFIC RAILROAD COMPANY,
�.......�
� r,,-� � a Delaware Corporation
nature
ame
�
.e..9--�-.
i�i��� ��n � a u�� �(� �'�.
Title
Signature
Chris Keckeisen
Printed Name
Manager I, Engineering — Public Projects
Title
��
Exhibit A
Project Description and Location
Project Description
City of Fairfax, IA proposes to replace asphalt roadway with concrete and improve the profile at
the crossing at the location referred to below.
Location
Clinton Subdivision
Crossing
DOT Type Milepost Street Name
190538R Public 89.98 Vanderbilt Street
Exhibit B
Scope of Project Services
Scope of work includes, but is not limited to the following
• Field diagnostic(s) and inspections
• Plan, specification, and construction review
• Project design
• Preparation of Project estimate for force account or other work performed by the
Railroad
• Meetings and travel
DocuSign Envelope ID: 7E2CF867-EOAA-4A6A-BC7F-A3874DEFF067
Exhibit C
Billing Contact Information
Name Cynthia Stimson
Title City Clerk/Treasurer
Address PO Box 337, Fairfax, IA 52228
Work Phone (319) 846-2204
Cell Phone
Email cstimson@cityoffairfax.org
Agency VANDERBILT ST
Project No.
L�ocu�ign.
Certificate Of Completion
Envelope Id: 7E2CF867EOAA4A6ABC7FA3874DEFF067 Status: Completed
Subject: Please Review & Execute: PE > IA > FAIRFAX > VANDERBILT STREET > DOT 190538R
Source Envelope:
Document Pages: 5
Certificate Pages: 5
AutoNav: Enabled
Envelopeld Stamping: Enabled
Time Zone: (UTC-06:00) Central America
Signatures: 1
Initials: 0
Envelope Originator:
Alex Campbell
1400 Douglas St MS910
Omaha, NE 68179
acampbe@upcontractor.up.com
IP Address: 45.54.164.228
Record Tracking
Status: Original Holder: Alex Campbell Location: DocuSign
4/28/2023 8:22:37 AM acampbe@upcontractor.up.com
Signer Events Signature 7imestamp
DacuSigned bY: . .. .
Chris T. Keckeisen �/�'� ' �I Sent: 4/28/2023 8:24:40 AM
CTKECKEI@UP.COM �,u,viS �.�,G�cuSUn, Viewed: 5/3/2023 8:37:52 AM
Manager Public Projects zac4ozdo�an�aEc... Signed: 5/3/2023 8:38:14 AM
UPRR
Signature Adoption: Pre-selected Style
Security Level: Email, Account Authentication
(None) Using IP Address: 45.54.164.196
Electronic Record and Signature Disclosure:
Accepted: 10/23/2019 2:06:36 PM
I D: 9bcb77d c-a 356-474 b-9155-5c819f942b48
In Person Signer Events' ' Signature Timestamp
Editor Delivery Events Status Timestamp
Agent Delivery Events Status Timestamp
Intermediary Delivery Events Status Timestamp
Certified Delivery Events ' Status Timestamp
Carbon Copy Events Status Timestamp
Cynthia Stimson Sent: 5/3/2023 8:38:15 AM
cstimson@cityoffairfax.org � � PI E [�
Security Level: Email, Account Authentication
(None)
Electronic Record and Signature Disclosure:
Not Offered via DocuSign
Ryan Wright � � �4 � �
rwright@benesch.com �
Security Level: Email, Account Authentication
(None)
Electronic Record and Signature Disclosure:
Accepted: 4/21/2023 5:46�42 AM
ID: 08cbf23d-9a08-42d9-b37d-e981 e15b70a2
Sent: 5/3/2023 8:38:16 AM
Witness Events Signature Timestamp
Notary Events Signature Timestamp
Envelope Summary Events
Envelope Sent
Certified Delivered
Signing Complete
Completed
Status Timestamps
Hashed/Encrypted 4/28/2023 8:24:40 AM
Security Checked
Security Checked
Security Checked
5/3/2023 8:37:52 AM
5/3/2023 8:38:14 AM
5/3/2023 8:38:16 AM
Payment Events Status Timestamps
Electronic'Record and Signature Disclosure