HomeMy WebLinkAboutRESOLUTION NO. 2023-72RESOLUTION NO. 2023-72
RESOLUTION TO APPROVE CHANGE ORDER NO. 4 FROM NELSON
ELECTRIC CO. FOR THE 2023 CITY PARKS LIGHTING PROJECT
WHEREAS, the City Council of Fairfax, Iowa has contracted with Nelson Electric Co.
for the 2023 City Parks Lighting project; and
WHEREAS, Hall & Hall Engineers has recommended approval of Change Order No.
4 for replacing the old electrical breakers at Hawks Ridge Park, with an additional cost of
$68.77.
NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Fairfax,
Iowa, to approve Change Order No. 4 from Nelson Electric for an additional cost of $68.77.
BE IT FURTHER RESOLVED, by the Fairfax City Council of the City of Fairfax,
Iowa, that the Mayor and City Clerk/Treasurer are hereby authorized and directed to execute
said resolution.
Passed and approved this 1 lt" day of July, 2023.
AYES: Nurre, Daly, Pacha, Volk, and Wainwright
NAYS: None
�'---'/�C-C•���-� f�c.�t.
�
Jo Ann Beer, Mayor
ATTEST:
� n ��.. � %
Cyn ia Stimson, City Clerk/Treasurer
,$. ,.
.f, �
�°
,, � _ `
�
., ;
..
,�_'`
HA�L & HALL ENGINEERS, INC.
PROJECT:
DATE:
CONTRACTOR:
ORIGINAL
CONTRACT AMOUNT:
CONTRACT
COMPLETION DATE:
CHANGE ORDER NO. 4
2023 City Parks Lighting
May 24t'', 2023
Nelson Electric Co.
$ 312,320.00
August 11�", 2023 — Final Completion
C.O. ITEM: Replace old breakers at Hawks Ridge Park.
The existing panel at Hawks Ridge Park was found to have incorrect breakers that were previously installed.
The existing breakers are the incorrect brand and are not UL listed to be installed in that panel. Nelson
Electric must follow current electricai standards and not aliow these breakers to remain installed. Thus,
Nelson Electric ordered and installed new, compliant breakers. Only the material cost is being requested in
this change order.
Refer to attached Change Order Request received from Nelson Electric.
The total Change Order 4 amount is $68.77.
Original Contract Amount: $ 312,320.00
C.O. #1 (Previously Approved) $8,265.40
C.O. #2 $1,525.30
C.O. #3 $2,159.12
C O #4 $68.77
Revised Contract Amount:
Hall & Hall Engineers, Inc.
By: C_..! ,/x-�_
Title: Proiect Manaaer
Date: 7/7/23
To Be Determined
(Not to Exceed $324,338.59)
City of Fairfax, lowa
gy. �� 1���-r--��'��2�
Title: .!'iS�S�✓�f�'
Date: 'J` /�l -.� �
CIVIL �tJGI(��EF�i(�G " Ll�ND SURV�YING ` LP,ND l?EV�LOF�PViGNI- PLAR�i�ING " LARIDSCAPF ARC;I-4I7EC7URE
1II60 C3ayson FtoacE '" I-9iawa4ha, IA 52233 '" PYr: 319.3�i2.95A8 '" FPJ:: 319.362.7535
Change Order Request
ELSON
ELECTRIC C0.
Project Name: City Park Lighting Project - Fairfax
C.O.R.# 04
G.C. # 04
Date: 5/24/2023
Project #: 97687
To: City of Fairfax
Attn:
300 80th St Ct
Fairfax, IA 52228
Phone: (319)846-2204 Fax:
Phone: (319) 366-6257 Fax: (319) 366-6083
We hereby propose to make the foliowing changes:
Hawks Ridge existing issue with panel
Durring our mobilization and material procurement investigation we found that the existing panel at hawks ridge has the
incorrect breakers supplied from exisiting work. The panel make and manufacture is (GE / ABB). Current breakers that
are installed are the incorrect brand and are not UL listed to be installed in that panel . This may be a safety issue,
generally if this current scope was getting inspected our scope may fail beacuse of this. The current customer is the city
themselfts and did not require inspections. We still need to follow current electrical standards and not allow these
breakers to be installed. I have ordered repacements we will not charge larbor as we have to open the panel and install
new breakers for our current scope. I Just ask to have the material covered
Change Order Price
This price is good for 5 days. If conditions change, this price is void.
We are requesting a time extension of 0 days in conjunction with this change.
$68.77
Justin Kress 5/24/2023
Author Date Sent
� Accepted The above prices and specifications of this Change Order request are satisfactory and are hereby
accepted. All work to be performed under same terms and conditions as specified in original
contract unless otherwise specified.
Authorized Signature
From: Nelson Electric Company
Justin Kress
PO Box 967
618 14th Avenue S.W.
Cedar Rapids, IA, IA 52406
Date ofAcceptance
Page 1 of 1
BILL TO:
O Remit To:
Echo Group, inc.
PO Box 33G
Council Bluffs, IA 51502
NELSON ELECTRIC "CEDAR RAPIDS �
618 14TH AVE SW
CEDAR RAPIDS, IA 52404-2626
ORDER DATE INVOICE DATE
05/10/2023 05/18/2023
PURCHASE ORDER #
ca97687
ORDER QTY SHIP QTY
WRITER
SHIP VIA
ECHO-TRUCK
DESCRIPTION
SHIP TO:
ii i i�i i �i i��i i i i i i i i ii ii i�ii �ii
Invoice
INVOICE NUMBER
S010042922.001
ECHO ELECTRIC SUPPLY BR 20 PAGE NO.
5621 WESTMINSTER DR
CEDAR FALLS, IA 50613-6953
319-268-8277 1 of 1
Fax 319-268-8278
NELSON ELECTRIC �CEDAR RAPIDS "
618 14TH AVE SW
CEDAR RAPIDS, IA 52404-2626
JOB NAME / RELEASE NUMBER ORDERED BY
ca97687 Justin Kress
TERMS TAX JURISDICTION
1% 10th Net 25th IA-LINN
3EA 3EA ge THHQL1120
GE BREAKER 20A 1P 120/240V PLUG IN
22000 AIC
Nonstock - Return by Approval
OS-1 9-20 23 1 238:52 PM
��
Left In Receiving
If paid by 06/10/2023 you may deduct $0.59
Invoice is due by 06/25/2023 net of any cash discount.
Notify at once of shortage or damage, returns require authorization
and are subject to restock fees. Special orders are non-returnabie
UNIT PRICE EXT PRICE
22.92/EA 68.77
Subtotal
S&H Charges
Tax
Payments
Amount Due
58.89
0.00
0.00
0.00
68.77
Printed By: SEACHE on 5/22/2023 1026:11 AM CDT
Hawks Ridge Panel, Incorrect breakers