HomeMy WebLinkAboutRESOLUTION NO. 2023-86RESOLUTION NO. 2023-86 RESOLUTION TO APPROVE CHANGE ORDER NO. 5 FROM NELSON ELECTRIC CO. FOR THE 2023 CITY PARKS LIGHTING PROJECT WHEREAS, the City Council of Faii•fax, Iowa has contracted with Nelson Electric Co. fot� the 2023 City Parks Lighting project; and WHEREAS, Hall & Hall Engineers has recoininended approval of Change Order No. 5 for re�aii•ing and rerouting an existing storm pipe to avoid a new light pole base at the Complex, with an additional cost of $732.84. NOW, THEREFORE, BE IT RESOLVED, by tlle City Council of the City of Fairfax, Iowa, to approve Change Order No. 5 fi•om Nelson Electric for an additional cost of $732.84. BE IT FURTHER RESOLVED, by the Fairfax City Council of the City of Fairfax, Iowa, that the Mayor and City Clerk/Treasurer are hereby authorized and directed to execute said resolution. Passed and approved this 8t�' day of August, 2023. AYES: Nun-e, Daly, Pacha, and Wainwright NAYS: None ABSENT: Volk V /Cl �'��'`- �'L' Jo Ann Beer, Mayor ATTEST: A C thia Stiinson, City Clerk/Treasurer � �.a `ae , c�f a� 4 �i . y A `� A :.'. HALL & HALL ENGINEERS, INC. - PROJECT: DATE: CONTRACTOR: ORIGINAL CONTRACT AMOUNT CONTRACT COMPLETION DATE: CHANGE ORDER NO. 5 2023 City Parks Lighting July 12�h, 2023 Nelson Electric Co. $ 312,320.00 August 11�'', 2023 — Final Completion C.O. ITEM: Repairing and rerouting existing storm pipe An existing 8" storm pipe at the Complex was found to be in conflict with a proposed light pole base. The pole base is required to be buried 4 feet deep. The depth of the existing storm pipe was found to be 3.5 feet. The proposed pole location could not be moved to avoid the storm pipe. Moving the pole base away from the storm pipe would have resulted in a conflict with either the existing sidewalk or existing water main. Therefore, the only option was to maintain the proposed pole base location and reroute the storm pipe around it. Refer to attached Change Order Request received from Nelson Electric. The total Change Order 5 amount is $732.84. Original Contract Amount: $ 312,320.00 C.O. #1 (Previously Approved) $8,265.40 C.O. #2 (Previously Approved) $1,525.30 C.O. #3 (Previously Approved) $2,159.12 C.O. #4 (Previously Approved) $68•77 C O #5 $732.84 Revised Contract Amount: Hall & Hall Engineers, Inc. By: ��� ', i� �-w---_ Title: Proiect Manaqer Date: 8/1 /23 $325,071.43 City of Fairfax, lowa By: � (.��c.r,.� ��� Title: �%J� �`Q✓Z Date: �`��`�� CIVIL FNGINEFRIf�!v � t r1N�� SU �.=��li _� I_F,4[� DFVE lJF'VI�=i�� i� PLANi��N(:� ` l Af�lDSCAPE ARCHITEC 1 UR� 1S60 B�yso�� R� . ;ir. .._., .. �/, �7_2�3 � � i. 319.3:>>.9:�48' FAX: ���� �E�.7_.7595 Change Order Request ,� �`� � � � ■ � Project Name: City Park Lighting Project - Fairfax C.O.R. # 04 G.C. # 04 Date: 7/14/2023 Project #: 97687 To: City of Fairfax Attn: 300 80th St Ct Fairfax, IA 52228 Phone: (319) 846-2204 Fax: Phone: (319) 366-6257 Fax: (319) 366-6083 We hereby propose to make the following changes: REROUTE AND REPAIR 8" TILE THAT GOT AUGERED INTO FOR LIGHT POLE BASE LABOR/MACHINE/MATERIAL PRICE AMOUNT 1.00 MINI EXCAVATOR 125.00 4.00 LABOR $300.00 1 TON MANSAND @ $15/TON $15.00 4- 8" 45 DEGREE ELBOWS $292.84 TOTAL $732.84 Change Order Price $732.84 This price is good for 5 days. If conditions change, this price is void. We are requesting a time extension of 0 days in conjunction with this change. NEC3 NELSON GRP3 7/14/2023 Author Date Sent � Accepted The above prices and specifications of this Change Order request are satisfactory and are hereby accepted. All work to be performed under same terms and conditions as specified in original contract unless otherwise specified. Authorized Signature From: Nelson Electric Company NEC3 NELSON GRP3 PO Box 967 618 14th Avenue S.W. Cedar Rapids, IA, IA 52406 Date of Acceptance Paqe 1 of 1 � �_��..: EXCAVATING INCORPORATEI� 611 51 st Street Phone: 319-981-3363 ` Marion, IA 52302 CHANGE ORDER REQUEST NELSON ELECTRIC E-MAIL: justink@nelsonelectric.com JOB ADDRESS: FAIRFAX SPORTS COMPLEX DESCRIPTION REROUTE AND REPAIR 8" TILE THAT GOT AUGERED INTO FOR LIGHT POLE BASE HOURS LABOR/MACHINE/MATERIAL 1.00 MINI EXCAVATOR 4.00 LABOR 1 TON MANSAND @ $15/TON 4- 8" 45 DEGREE ELBOWS PRICE $125.00 $75.00 Date: 7/12/2023 AMOUNT $125.00 $300.00 $15.00 $292.84 TOTAL $732.84