HomeMy WebLinkAboutRESOLUTION NO. 2022-13RESOLUTION NO. 2022-13 RESOLUTION TO APPROVE PAY APPLICATION NO. 8 FROM SCHRADER EXCAVATING & GRADING CO. FOR THE 2021 SANITARY SEWER & WATER MAIN EXTENSIONS PROJECT WHEREAS, the City Council of Fairfax, Iowa has contracted with Schrader Excavating & Grading Co. for the 2021 Sanitary Sewer & Water Main Extensions project; and WHEREAS, Hall & Hall Engineers has recominended approval of Pay A�plication No. 8 from Schrader Excavating & Grading Co. for a current payment due of $31,252.63. NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Fairfax, Iowa, to approve Pay Application No. 8 from Schrader Excavating & Grading Co. for the 2021 Sanitary Sewer & Water Main Extensions project and issue a check for $31,252.63. BE IT I'URTHER RESOLVED, by the Fairfax City Council of the City of Fairfax, Iowa, that the Mayor and City Clerk/Treasurer are hereby authorized and directed to execute said resolution. Passed and approved this 8t1i day of February, 2022. AYES: Nurre, Daly, Pacha, Volk, and Wainwright NAYS: None r) ��.' ��..-��..1.���_____. ������ Burnell G. Frieden, Mayor ATTEST: � � �ynthia Stimson, City Clerk/Treasurer 3 k,.as'¢° 'ga',,,:: , s'�' ;� '�> �a; `, �. ,,.3 ,�� g' ���: .���� APPLICATION AND CERTIFICATION FOR PAYMENT ��i�I�oCUMEN7'G7o2 PAGE1 oF TO CONTRACTOR: City Ofl�airf�x 300 8�th St CC Fairtaz IA 52228 FROM CON1'RACTOR: Schrader Excavating R: Grading Co. PRO.TTC'1': Fairfax Sewee & Water Ext. APPI..[CAT[ON NU PERIOD 1'O: PROJECT NOS: 8 Dis6�ibution to: Cx f Jon Larson, Haif & Hall 0 January 1, 2022 � 0 � 21.048 CONTRAI.'T FOR: CONTRACT DATE: CONTRACTOR'S APPLICATION FOR PAYMENT rn� U„a����,ed co�,��a��or �e��;r� �i,a� to m� b�� oeme eonna��ors k�oWiea��, Application is made for payment, as shown below, in com�ection with the Conhact, infomiation and belief'the Work covered by this Application f'or Paymeut has been Con[invation Shcet, AIA Document G703, is attached. completed in accordance with lhe Contract Doenments, ihat atl amounts have been paid'oy � ihe Conlracror tor Work for which previous CertiCcales for Payment were issued nnd paymenis received fi�om the Owner, and �hat current payment shown hcrcin is now dne. l. OIllGiNAL CONTRACT SUM 2. Ne[ change by Change Orders 3. CONT[tACI' SUM TO!)A7'E (Line I f 2) 4. TOTAL COMPI,E"IFD & STORED TO DATE (Colu�rvi G on G7Q3) S. RETAINAG6: $ 1,829,203.65 $ 9,�382.50 $ 1,838,686.15 $ I,778,061.47 a. 5% of Completed Work $ 88,903.07 (Cofumn D + E on G703} U. 5% of Stnred Materia[ $ (Colwnu 1� on G�03) Total Reta'rnage (Lines Sa + Sb or Total in Colmnn I of G703) 6. TOTAL EARNEU LF.SS R�TAINAGE (Line 4 Less L'u�e 51b[al) 9. LESS PRIiV10US CERTII�[CA7TS FOR PAYIvIENT (Line G from prior Certificate) 8. CURRENT PAYN]EN'C DUE 9. BALANCE TO FMISH, INCLC7DING I2L' I ASNAGE (i,ine 3 Iess Line 6) 0.00 $ 88,903.0� $ 1,6R9,158.40 $ 7,657,905.77 $ 31,252.63 � I49.529.�5 CONTRACTOR: B : _ � Date: (' ^� `�� ��%- . ailey awyer, . r� eci Assistan[ ` Stateof'. j�� �b,,�,. y�c3 Ceunlyof: �..�Y1Y� Sabscribe�nU to hrf�n*n �„+ae�this �.' day of �:=�.�VVt�'1 ✓`� ��(? `,7>��� �--` Notury PuUlic. �°' My Convuission exE�ices: '"; :.�-�1 � � . ARC ITECT'S CERTIF C :�.:.tJ�mber77225Y In accordance with the Coittract Documents, based mi nn-si( �. � tion�"�dtii�Hi�RFAtk�on Ep(res c�mprising the appficatioq the Architect cedifies to thc Ow 13� 202� Architecl's knowledge, in(onnation and be[ief the Workhas progressed as indicated, fhe quaGty of !he Work is in acwrdance with the Contract Documents, and the Contrac[or is entitled to payment of tl�e AMOUNT CHRTIFI&D. AM011NT CF.,RTIFITD . . ..... . . . . $ 31� Z.S�Z , �� 3 CHA E RDBR SUMMARY AD TIONS D& UCTIONS (Aaoch explmuliat rJmnotnt! ce�•tifred d Jlers fi•air the mimanr nppYed. Inrlinl nl! frgm•es nn lhis Tolal changes approved Applir.n�ion nnd oui7�e Conti»ua�ion Sheef denl are clmagert (o r.onja�uv ividt fhe nuroun� cerrified. j in revious montht by Owner $0_00 $0.00 ENGINEF,R: _._ __, _._ _ _ Tota] a roved this Mon[h $9,482.50 Hy: _ � y.., L.��,._...--�-�._ Date: �. ^�- ��- .� __�......__ — --- 'P09'AI.S $9,482.50 $0.00 This Certificate is not negotiable. Tl�e AMOUNT CF.RTIFLF.D is payable only to Ihe � � ���` � l'ontractor nameY herem, lssuance, paymeni and acecptance oL payment are w�tliout NET CHANGES by Change Order $9,482,50 prejudice to any righLs of the Owner or Contractor under lhis Confract. A�A DOCUNENT G707. �APPLICATION ANDCERT7FICqTION FON PAVNENT � 1932 E�ITION � AIA � ��992 THE AMERICAN IN5717UTE OFAflCHITF:CTS, t735 NEW YORH AVE, N.W., WASFIINGTCN, IX;20006�5292 Users may ohtain validation of fhis document by requesting a completed AIA Document D401 • Certification of Documen£s Authenticity from the Licensee. Fairfax Sewer & Water Ext. CONTINUATION SHEET ��� Docz��vr�N�G�o� P��EZ o�5 ���ES AIA Document G902, APYLICATION A]VD CERTIFICATION FOR YAYMENT, co��taining APPLICATION NO: 8 Contractor's signed certificati on is attached. APPLTCATI ON DATE: 1/ 11 / 2 0?_?_ In t�bulations below, amounts are stated to the ncerest dollar. PERIOD T0: 1/ 1/2022 Use Column I on Contracts where vnrinble refainage fa liuc itcros may xpply. ARC�]ITECT'S PROJECT NO: 21.045 A B C ll G F G 1�1 I PCFM UESCRIf'770N OP WORK SCNEUULED WOtLK COMPLF,TF.D MA'fERIA1.S TO'1'AL % 13ALANCF, RETNNAGL NO. Vr1LUH f�ROM PREVIOUS '1'li[5 PEffiOD PRLSEN'CLY COMPL�TED (G+C) TO �AFISI�7 (ll� VARIABLE APPL[CATION S7'ORED AND S'TORED (C - G) RA'I'fi) (D + E) (NOT IN TO DATE D OR B) (D+E+F) 001 Clearing & Grubbing 6,700.00 6,700.00 0.00 0.00 6,700.00 100.00% 0.00 335.00 002 Sirip, Stockpile & Respread Top Soil 16,775.00 16,775.00 0.00 0.00 16,775.00 100.00°/ 0.00 83875 003 Strip, Stockpile & Respread �op Soil 165.00 165.00 0.00 0.00 165.00 100.00% 0.00 II.25 004 I�espread Top Soil 893.75 0.00 0.00 0.00 0.00 0.00% II93.75 0.00 005 Excavation Class 10 10,260.00 10,260.00 0.00 0.00 10,260.00 100.00% 0.00 .._ 513.00 006 Subgrade Preperation 4,620.00 4,620.00 0.00 0.00 4,620:OQ ;, 100.Q0% 0.00 � ?_31.00 007 Subgrade Treatment, Geogrid II,197.00 8,197.00 0.00 0.00 8,197�pOr''> 100.00% 0.00_ . 409.85 008 Subbase Modified 9" 33,753.40 33,753.40 0.00 0.00 33,753i40- ; 100.00% _ ' 0:00 1,687.67 009 Subbase Modified 4" 773.50 773.50 0.00 0.00 773.'50' 100.00% 0.00 38.68 O10 Subbase Class A 3" 16,216.20 16,216.20 0.00 0.00 16,216.20 100.00%o 0.00 810.81 Ol l Removal Of Pipe Culverts I IDPE 24" 296.00 296.D0 o.00 0.00 296.00 100.00% 0.00 14.80 012 Removal Of Pipe Culverts FiDPE 1 �' 804.75 80a.75 0.00 0.00 804.75 100.00% 0.00 4024 013 Removal Of Pipe Culverts RCP 12" 240.50 240.50 0.00 0.00 240.50 100.00% 0.00 12.03 014 Removal Of Pipe Culverts RCP 15" 231.25 231.25 0.00 0.00 231,25 100.00% 0.00 11.56 OlS Removal Of Pipe Culverts RCP 1II" 194.25 194.25 0.00 0.00 1�J4.25 100.00°l0 0.00 9.71 016 Removal Of Pipe Culverts CMP 1�' 231.25 231.25 0.00 0.00 231.25 100.00% 0.00 11.5� 017 Removal Of Pipe Culveits CMP 18" 1,776.00 1,776.00 0.00 0.00 1,776.00 100.00% 0.00 88.80 018 Removal Of Pipe Culveits CMP 24" 222.00 222.00 0.00 0.00 222.00 100.00% 0.00 11.10 �19 Removal Of Pipe Culverts CMP 30" 148.OD 148.00 0.00 0.00 148.00 100.00% 0.00 7.40 020 Site Dewatering Along Fairfax Road, I_efebu 250,000.00 250,000.00 0.00 0.00 250,000.00 100.00% 0.�0 12,500.00 021 Site Dewatering Along Soutliview, Williams 20,500.00 20,500.D0 �.00 0.00 20,500.00 100.00% 0.00 1,025.00 022 Trench Foundation 9�,000.00 12,761.60 0.00 0.00 12,761.6Q 79.76°/ 3,238.40 638.08 023 Replacement Of Unsuitable Backfll 5,250.00 0.00 Q.00 0.00 0.00 0.00% 5,250.00 0.00 029 Replacement Of Unsuitable Backfill 7,437.50 0.00 0.00 0.00 0.00 0.00% 7,437.50 0.00 025 Sanifary Sewer Trenched 6" PVC 258.00 258.00 0,00 0.00 258.00 100.00% 0.00 12.90 026 Sanitary SewerTrenched II" PVC 1,470.00 1,470.00 0.00 0.00 1,470.00 100.00% 0.00 73.50 027SanitarySewerTrenchedl0"Truss 1,456.00 1,456.00 0.00 0.00 1,456.00 100.00% 0.00 72.80 028 Sanitary Sewer Trenched 12" PVC 88,768.00 88,768.00 0.00 0.00 IIII,768.00 100.00% 0.00 4,438.40 029 Sanitary Sewer Trenched 12" PVC 270.00 270.00 0.00 0.00 270.00 100.00% D.00 13.50 030 Sanitary Sewer Trenched 15" PVC 14,596.00 14,596.00 0.00 0.00 14,596.00 100.00% 0.00 729.80 031 Sanitary Sewer Trenched 18" PVC 520.00 520.00 0.00 0.00 520.00 160.00% 0.00 26.00 032 Sanitary SewerTrenched 21" PVC 37,791.OD 37,791.00 0.00 0.00 37,791.00 100.00% 0.00 1,889.55 TOTAL - PG '1 546,II14.35 529,994.70 0.00 0.00 529,994.70 16,819.65 26,499.74 Fairfax Sewer & Waier Ext. CONTINUATION SHEET �r�r�ocuME�vz�c�o3 VAGE30F5PAGES AIA Document G702, APPLICATION AND CI:RTIP[CA'CION rOR PAYMEN'T, containu�g APPLICATION NO: fl Contraclor's signed certificntion is atlached. APNLICATION DATE: 7./11 /2022 In labulntions belo�v, amoun�s are stated �o the nearest dollar. PERt011'I'O: 1/ 1/2 022 Use Column I on Contracts �vhere variablc rcta'v�age tor line items mfly apply, ARCFIITECT'S PROJEC7' NO: Z i.048 A 6 C D P, F G H 7 ITEM DL•SCRIP7'IONOP WORK SCHEDULEU WORK COMPL6THD MATERIALS TOTAL % HALANCE RLTAINAGE NO. VALUG I�ROMYREVIOUS T}llSYEWOD P[LLSENTLY COMPLETED (G`C) 'COFINISH (IrVARIABLE APPI,ICATION STORED AND STORLD (C • G) RATG) (D -r li) (NO"1' IN TO DATE D OR E) (D+F.+F) 33 Sanitary Sevaer Trenched 24" I'VC 204,680.00 204,680.00 0.00 0.00 204,680.00 100.00 % 0.00 10,234.00 34 Sanitary Sewer Trenchless W/ Casing 24" 108,000.00 108,000.00 0.00 0.00 108,000.00 100.00% 0.00 5,400.00 35 Removal Of Sanitary Sewer Trenched 8" PV 161.00 161.00 0.00 0.00 161.00 100.00 % 0.00 8.05 36 Pipe Culvert Trenched HDPF 15" 1,073.00 1,073.00 0.00 0.00 1,073.00 100.00 % 0.00 53.65 37 Storm Sewer Trenched HDPE 24" 2,610.00 2,610.00 0.00 0.00 2,610.00 100.00 % 0.00 930.50 38 Pipe Culvert Trenched RCP 15" 8,178.00 8,178.00 0.00 0.00 8,178.00 100.00% 0.00 408.90 39 Pipe Culvert Trenched RCP 18" 1,584.00 1,56A.00 0.00 0.00 1,564.00 100.00% 0.00 78.20 40 Storm SewerTrenched Arch Pipe 36" 4,236.00 4,236.00 0.00 0.00 4,236.00 100.00% 0.00 211.80 �}1 PipeCulvertTrenchedCMP1�' 1,242.00 1,242.00 0.00 0.00 1,242.00 100.00% 0.00 62.10 42 Pipe Culvert Trenched CMP 18" 9,950.00 9,950.00 0.00 0.00 9,950.00 100.00% 0.00 497.50 43 Pipe Culvert Trenched CMP 30" 5,582.50 3,045.00 2,537.50 0.00 5,582.50 100.00% 0.00 ?_79.13 44 Pipe Culvert Trenched 15" Temp 5,600.00 800.00 0.00 p.00 800.00 14.29% 4,800.00 40.00 9S PipeApronRCP36"Arch 1,700.00 1,700.OD 0.00 0.00 7,700.00 100.00% 0.00 85.00 96 Pipe Apron CMP 30" 1,260.00 0.00 1,260.00 0.00 1,260.00 100.00% 0.00 63.00 47 Pipe Apron RCP 15" 1,500.00 1,500.00 0.00 0.00 1,500.00 100.00% 0.00 75.00 48 Fooling For Pipe Apron 36" 450.00 450.00 0.00 0.00 450.00 100.D0 % 0.00 22.50 49 Water Main Trenched DIP 12" 82,144.00 82,144.00 0.00 0.00 82,194.00 100.00% 0.00 4,1072D 50 Water Main Trenched C900 12" 199,690.25 199,690.25 0.00 0.00 199,696.75 100.00 % 0.00 9,984.51 51 Connecl To Existing Water Main 8" 2,500.00 2,500.00 0.00 0.00 2,500.00 100.00% 0.00 125.00 52 Connec( To Cxisting V�ater Main 12" 2,100.00 2,100.00 0.00 0.00 2,100.00 100.00 % 0.00 105.00 53 Water Main Trenchless W/ Casing 12" 70,000.00 70,000.00 0.00 0.00 70,000.00 100.00% 0.00 3,500.00 54 WaterMainTrenchlessW(Casing12" 70,000.00 70,000.00 0.00 0.00 70,000.00 100.00% 0.00 3,500.00 SS Flushing Device 12" 700.00 700.00 0.00 0.00 700.00 100.00% 0.00 35.00 56 Fltting Bend 12" 7,245.00 7,245.00 0.00 0.00 7,245.00 100.00% 0.00 36225 57 Fitting Tee 12" 900.00 900.00 0.00 0.00 900.00 100.00 % 0.00 45.00 58 Fitting Tee 12" 375.00 375.00 0.00 O.OD 375.00 100.00 % 0.00 18.75 59 fitiing Cross 12" 670.00 670.00 0.00 0.00 670.00 100.00% 0.00 33.50 60 Fitiing Reducer 12" 185.00 185.00 0.00 0.00 185.00 100.00% 0.00 9.25 61 Gate Valve 12" 31,200.00 39,200.00 0.00 0.00 31,200.00 100.00% 0.00 1,560.00 G2 Fire Hydranl Assembly 49,500.00 49,500.00 0.00 0.00 49,500.00 100.00% 0.00 2,�i75.00 63 Manhole Sanitary 48" 26,425.00 26,425.00 0.00 0.00 26,425.00 100.00% 0.00 1,32125 G4 ManholeSanita 48" 14,000.00 14,000.00 0.00 0.00 14,000.00 100.00% 0.00 700.00 Subtotals 1,462,235.10 1,436,817.95 3,797,50 0.00 1,440,615.45 98.52% 21,619.65 72,030.77 Fairfax Sewer & Water Ext. CONTINUATION SHEET t1z,�DocUM�NTr�o3 PAGE40F5FAGF5 AIA Document G707., APPL7CATION AND CfiRTSFTCATION I�OR PAYMLNT, containiiig APPLICATION N0: E3 Contractor'ssignedce�1ifieationisattaehed. APPLICATIONDAT�: ]./11/2022 ln tabtdntions bclow, mnounts are stated to the nearest dollac PfiKIOD "CO: ]. / 1/ 20'L2 Use Colunm 1 on Contracts where vnriablc retan�nge for linc itcros may apply. ARCHITECT'S I'ROJEC7� NO: 21.048 A 6 C D P.. F G H 1 1TEM DESCRIPTION OF WORK SCh1GDULGD WORK COtv1PLLTGD MATERIALS 'I'OTAL % }3ALANCH RE7'AINAGE NO. VALUE FILOM PRLVIOUS 'I'HIS PGIZIOD PI2GSGNTLY COA9'LETGD (G=C) 7'O PINISH (IP VARtABLE N'YLICA'170N S7'OFFD AIJD S'I'ORED (C - G) RA7'E) (p+I;) (NOTIN TODATE D OR E) (Do-L�+F) 65 Sanitary Manhole 48" 6,850.00 6,850.00 0.00 0.00 6,650.00 100.00% 0.00 342.50 C,G SanitaryManhole48" 5,500,00 5,500.00 0.00 0.00 5,500.00 100.00% 0.00 275.00 G7 Sanitary Manhole 60" 9,675.00 9,625.00 0.00 0,00 9,625.00 100.00% 0.00 481.7_5 68 StormManholeShallowGx7 8,100.00 8,100.00 0.00 0.00 8,100.00 100.00% 0.00 405.00 (9 Internal Drop Connection 1,250.00 1,250.00 0.00 0.00 1,250.00 100.00 % 0.00 62.50 70 Manhole Adjustmeni 30.00 30.00 0.00 0.00 30.00 100.00% 0.00 1.50 71 Connect to Existing Sanitary Sewer Manhol 8,725.00 8,725.00 0.00 0.00 8,725.00 100.00 % 0.00 436.25 72 Pavement HMA 4" 7,575.00 7,575.00 0.00 0.00 7,575.00 100.00% 0.0� 378.75 73 Removal Of Shared Path PCC 52.00 52.00 0.00 0.00 52.00 100.00% 0.00 2.60 74 Removal Of Driveway NCC 246.00 246.00 D.00 0.00 246.00 100.00% 0.00 12.30 75 RemovalOfDrivewayAsphalt 146.00 146.00 0.00 0.00 146.00 100.00% 0_00 7.30 76 Removal Of Driveway Granular 744.00 244.00 0.00 0.00 244.00 100.00% 0.00 1220 77 Removal Of Driveway Granular 4,600.00 4,600.00 0.06 0.00 4,600.00 100.00% 0.00 230.00 7S Shared Path Asphalt Miilings 104.00 104.00 O.OD 0.00 104.00 100.00% 0.00 520 79 Driveway PCC 6" 11,070.00 11,070.00 0.00 0.00 11,070.00 100.00% 0.00 553.50 80 Driveway FiMA 6" 4,745.00 4,745.00 D.00 0.00 4,745.00 100.OD% 0.00 237.25 81 Driveway C�ass A Stone 6" 1,377.50 1,372.50 0.00 0.00 1,372.50 10D.00% 0.00 68.63 82 Driveway Class Fl Stone 8" 17,391.00 17,391.00 0.00 0.00 17,391.00 100.00% 0.00 869.55 83 Driveway 2" Roadstone 8" 9,052.50 9,052.50 0.00 0.00 9,052.50 100.00 % 0.00 452.63 84 Driveway Asphalt Miilings 6" 5E17.50 587.50 0.00 0.00 587.50 100.00% 0.00 29.3fS 85 Pavement Removal Seal Coal & Subbase 7,700.00 7,700.00 0.00 0.00 7,700.00 100.00% D.00 385.00 86 Pavement Removal Asphalt & Subbase 505.00 505.00 0.00 0.00 505.00 100.00% 0.00 25.25 87 Seal Coat 20,299.50 20,299.50 0.00 0.00 20,299.50 100.00% 0.00 1,014.9II 88 Temporary Traffic Control 6,G50.00 6,650.00 D.00 0.00 6,650.00 100.00% D.00 332.50 R9 Conventional Seeding 7ype 1 3,891.50 0.00 0.00 0.00 D.00 0.00% 3,899.50 0.00 90 Conventional Seeding Type 2 4,70M1.00 0.00 0.00 0.00 0,00 0.00% 4,704.00 0.00 91 Eroision Contro) Mulching 3,562.50 0.00 3,562.50 0.00 3,562.50 100.00% 0.00 178.13 92 Warranty 1,075.00 0.00 0.00 0.00 0.00 0.00% 1,075.00 0.00 93 SWPPP 2,000.00 7,000.00 0.00 0.00 2,0OO.OD 100.00% 0.00 100.00 94 Removal & Reinstallation Class D�roision 1,189.50 1,189.50 0.00 O.DO 1,189.50 100.00 % 0.00 59.R8 95 Filier Sock 12" 65025 650.25 0.00 0.00 650.25 100.00 % 0.00 32.51 J6 Filier Sock Removal 244.80 0.00 0.00 0.00 0.40 0.00% 244.80 0.00 Subtotais 1,611,972.65 1,573,077.70 7,360.00 0.00 1,580,437.70 98.04% 31,534.95 79,021.89 Falrfax Sewer & Water Ext. CONTINUATION SHEET �1� DocvNr�NTc�o3 PACaE50F5 PAGE$ AlA Dacmnent G702, APPLICAT[ON AA�D CL'R'I'IFICATION POI2 PAYMEN'1', containin� AT'PLICATION N0: II Contractor's signed cerlification is attnched. APPLICATION DA"I�: 1/11/2022 Li faUidntious bclo�v, amounts are stated to t0e nearest dollm'. P�RIOD TO: 1/1/2022 lJse Column 1 0�� ConU'ac(s �vherc v�ri�ibie rctninnge for 1'uic ilcros may apply. AI2CkIPPGC'T'S PR0IECT NO: 21.048 A [3 C D E P G H ( Ii'EM DGSCRIP'IION OP WORK SCtiEDULEU WORK WMPLETED MA7'GRIAI S TOTAL % flN.ANCb RFTAINAGE NO. VALU$ FRO,UI PRIiVIOUS '1'H1S PLRIOD PRESEN7"Ly COMPLIiTP.0 (G -C) 7'O FTNIShi (IP VN2ll+IILti APPUCA'fION STORE:D A1JDS'CORED (C-G) RA'CF,) (D �r E) (NOl' W TO DATP. D OR E) (p+g+F) 97 Temperary RECP Type 1 B 1,875.00 0.00 0.00 0.00 0.00 0.00% 1,875.00 0.00 98 Wattle 9" 774.00 774.00 0.00 0.00 774.00 100.00% 0.00 38.70 99 Wattle Removal 258.00 D.00 0.00 0.00 0.00 0.00% 250.00 0.00 100 1" Clean Stone 65.00 0.00 0.00 0.00 0.00 0.00% �5.00 0.00 101 Silt Fence 4,139.50 350.00 0.00 0.00 350.00 8.46% 3,789.50 17.50 102 Silt Fence Removal Of Sediment 3,165.50 0.00 0,00 0.00 0.00 0.00% 3,165.50 0.00 103 Silt Fence Removai Of Device 730.50 62.00 0.00 0.00 62.00 II.49% 668.50 3.10 104 InletProtection 1,459.50 417.00 750.0� O.OD 1,167.00 79.96% 292.50 58.35 105 Inlet Protection Maintenance 451.50 0.00 O.OQ 0.00 0.00 0.00% 451.50 0.00 106 pustControl 1,095.00 0.00 OA� 0.00 0.00 0.00% 1,095.00 0.00 107 Barbed Wire Fence 823.50 0.00 0,00 0.00 0.00 0.00% E323.50 0.00 108 Reinoval Of Fence 184.00 184.00 0.00 0.00 184.OD 100.00% 0.00 9.20 ]09 ModularBlockWall 1,080.00 0.00 1,080.00 0.00 1,080.00 100.00% 0.00 54.00 110 Mobilization 140,000.00 120,588.00 10,000.00 0.00 130,588.00 9328% 9,412.00 6,529.40 111 GranularShoulders'typeB 1A,925.00 14,925.00 0.00 0.00 14,925.00 100.00% 0.00 74825 112 Temporary Roadway Surface 17,835.00 10,641.27 0.00 0.00 10,641.27 59.67% 7,193.73 532.06 ] 73 Temporary Roadway Surface 17,690.00 17,690.00 D.00 0.00 17,690.00 100.00% 0.00 884.50 1Ih Staging & Laydown 5,000.00 3,500.00 1,500.00 0.00 5,000.00 100.00% 0.00 250.00 115 Sign Removal & Reinstall 4,225.00 1,500.00 2,725.00 0.00 4,225.00 100.00% O.OD 211.25 116 Pot Hale Utiilities 1,455.00 1,455.00 0.00 0.00 1,455.00 100.00% 0.00 72.75 117 ITC 1 7,000.00 0.00 7,000.00 0.00 7,000.00 100.00°/ 0.00 350.00 118 ITC 4 ?.,482.50 0.00 2,462.50 0.00 2,482.50 100.00 % 0.00 124.13 119 0.00 0.00 0.00 0.00 0.00 0.00 % 0.00 0.00 iao o.00 o.00 o.00 o.00 o.00 o.00i o.00 o.00 iai o.00 o.00 o.00 o.00 o.00 o.00io o.00 o.00 i2a o.00 o.00 o.00 o.00 o.00 o.00�i o.00 o.00 I23 0.00 0.00 0.00 0.00 0.00 0.00 % 0.00 0.00 124 0.00 0.00 0.00 0.00 0.00 D.00% 0.00 0.00 125 0.00 0.00 0.00 0.00 0.00 0.00°/ 0.00 0.00 l26 0.00 0.00 0.00 0.00 0.00 0.00% 0.00 0.00 127 O.dO 0.00 0.00 0.00 0.00 0.00 % 0.00 0.00 �za o.00 o.00 o.00 o.00 o.ao o.ao/ o.00 o.00 GRAND TOTALS 1,838,686.15 1,745,163.97 32,897.50 O.DO 1,778,061.47 96.70% 60,624.68 88,903.07