Loading...
HomeMy WebLinkAboutRESOLUTION NO. 2022-44RESOLUTION NO. 2022-44 RESOLUTION TO ENTER INTO AN AGREEMENT WITH THE SEEDING SUBCONTRACTOR FOR THE 2021 SEWER & WATER MAIN EXTENSIONS PROJECT TO COVER THE REMAINDER OF THE SEEDING WARRANTY PERIOD WHEREAS, the City of Fairfax, Iowa has contracted with Schrader Excavating & Grading Co. for the 2021 Sanitaiy Sewer & Water Main Extensions project; and WHEREAS,. Schrader Excavating & Grading Co. subcontracted with Soil Concepts, Inc. for the seeding work; and WHEREAS, Hall & Hall Engineers has recosmnended the City enter into an agreement with the Soil Concepts, Inc., to cover the reinainder of the seeding warranty period after the geileral contract with Sclu-ader Excavating & Gradiilg Co. is closed out. NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Fairfax, Iowa, to enter into aiz agreeinent with the 2021 Sanitary Sewer & Water Main Extensions seeding subcontractor, Soil Conce�ts, Inc., to cover the remainder of the seeding wai7-anty period. BE IT FURTHER RESOLVED, by the Fairfax City Council of the City of Fairfax, Iowa, that the Mayor and City Clerk/Treasurer are hereby authorized and directed to execute said resolution. Passed and approved this 10t1i day of May, 2022. AYES: Nurre, Daly, Pacha, Volk, and Wainwright NAYS: None � > 6 urnell G. Frieden, Mayor ATTEST: � C_ % ��, Cy � thia Stilnson, City Clerk/Treasurer �4 ��� . �.x �t �C�� �,t �"+ R 4 0� % {' { ; .: � � .y t�� Permanent Seeding Warranty Supplemental Agreement 2023 Sanitary Sewer & Water Main Extensions Project No.: 6950-20-02 This warranty is to guarantee compfeted seeding areas at th� Fairfax Sanitary Sewer & Water Main Extensions project site for a maximum period of 12 months from the date of project acceptance, May 10, 2Q22. A uniformly dense, live, and heaithy stand oP grass, free of weeds, debris, erocied areas, bare spots, diseases, and insects shali be provided at the end of the warranty period (May �0, 2023). During the warranty periad, any defecfs in the original seeded area (2.85 acres of SUDAS Type 1 and 4.32 acres of SUDAS Type 2} sha►f be corrected and re-seeded until ail affected areas are accepted by the Engineer. No additionai compensation beyond fhe warranty fee shall be made. Repair costs are the C�nlractor's responsibility, except for those resulting from loss or damage due to accupancy of the site by oEhers, vandalism, civi! disobedience, physical damage by animals, vehicles, fire, or losses due to curfaifinent of water by local authority, or by "Acts of Gad". Seeding and fertilizing work shall camply with Section 9010 of the SUDAS Standarci Specifications. IN WITNESS WHEREOF, the City of �'air(ax, lowa and Soil Concepts, Inc. have signed this Supplemental Agreement in duplicate. One counterpark each has been delivered to each party. City of Fairfax, IA �� �y:�� - - _ ,r�to ��,�.� _� i �1 \! n ,r- 7� (Titie) Soi) Concepts, lnc. / �� � By: (,,.�W'"^ ����'� � f) �L4? �!'Q„S � i.�A.� � (Title) Date: �� //— � �- Attest: ZL� � t /�� Date: ..��/�/ � �� �' � r�-- Attest: �.