Loading...
HomeMy WebLinkAboutRESOLUTION NO. 2022-92RESOLUTION NO. 2022-92 RESOLUTION ESTABLISHING WATER MAIN CONNECTION FEES ALONG FAIRFAX ROAD & LEFEBURE ROAD RELATIVE TO THE 2021 SANITARY SEWER AND WATER MAIN EXTENSION PROJECT WHEREAS, the City of Fairfax has constructed a water main facilities project known as the 2021 Sanitary Sewer and Water Main Extension Project; and WHEREAS, said water main facilities project provides potential water supply service to a number of properties lying along Fairfax Road and Lefebure Road; and WHEREAS, the City of Fairfax has determined that portions of the costs of said water main facilities project shall be reimbursed to the City in the form of connection fees in accordance with Chapter 90.06 CONNECTION FEE of the City's Code of Ordinances; and WHEREAS, the City Engineer has calculated the cost of this water main facilities project and the fees for connecting properties located along Fairfax Road and Lefebure Road to the City's water mains that are part of this project. NOW, THEREFORE, SE IT RESOLVED, by the City Council of the City of Fairfax, Iowa, the following: 1. Water Main Connection Fees for the properties located along Fairfax Road and Lefebure Road within the limits of the 2021 Sanitary Sewer and Water Main Extension Project shall be as follows: a. The Connection Fee shall be determined by the property line frontage lying adjacent to City's water main, and shall be set as $65.92/LF of property frontage for vacant properties being developed. b. The Connection Fee shall be determined by the property line frontage lying adjacent to City's water main, and shall be set as $32.96/LF of property frontage for existing developed properties. c. The Connection Fees established above shall increase at an annual interest rate of 1.7041029% per year beginning on January l, 2023, and shall continue to increase at this interest rate each year through 2035. After these connection fees have been adjusted for interest in 2035, no further adjustments shall be made to these connection fees for interest. Vacant/To Be Dev. Lots Exist. Dev. Lots i. 2023 —1.7041% $67.04/LF $33.52/LF ii. 2024 —1.7041 % $68.19/LF $34.09/LF iii. 2025 —1.7041% $69.35/LF $34.67/LF ►:� 3 � 5 � 7. iv. 2026 -1.7041 % v. 2027 - 1.7041 % vi. 2028 -1.7041% vii. 2029 -1.7041 % viii. 2030 - 1.7041% ix. 2031 -1.7041 % x. 2032 -1.7041 % xi. 2033 - 1.7041% xii. 2034 -1.7041% xiii. 2035 -1.7041% $70.53/LF $71.73/LF $72.95/LF $74.20/LF $75.46/LF $76.75/LF $78.06/LF $7939/LF $80.74/LF $ 82.11 /LF $35.26/LF $35.87/LF $36.48/LF $37.10/LF $37.73/LF $38.37/LF $39.03/LF $39.69/LF $40.37/LF $41.06/LF For water services and/or water main connections larger than 1 inch in diameter, the City shall also charge a tapping fee in addition to the water main connection fee for water services/water mains connecting to the City's water main installed as part of this 2021 Sanitary Sewer and Water Main Extension Project. These tapping fees shall be as follows: a. Up to, incl. 1" dia. water service - No Additional Tapping Fee b. Up to, incl. 2" dia. water service -$250.00 c. Up to, incl. 3" dia. water service -$550.00 d. Up to, incl. 4" dia. water service -$990.00 e. Up to, incl. 5" dia. water service -$1,580.00 f. Up to, incl. 6" dia. water service -$2,220.00 g. Up to, incl. 8" dia. water service -$4,000.00 h. Up to, incl. 10" dia. water service -$6,400.00 i. Up to, incl. 12" dia. water service -$9,000.00 The City maintains the right to pass on any and all costs that the City may accumulate as part of a water service / water main connection to the property owner benefiting from this connection. The Water Main Connection Fees shall be paid to the City Clerk by the applicant prior to the approval by the City of the final plat, or if so decided by the City Council, with the issuance of a building permit of a platted lot, or the sale of a platted lot. If the proposed water main connection is not part of a platted subdivision for which these water main connection fees have been paid, then the connection fees shall be paid prior to the issuance of a building permit or prior to the applicant's connection to the City's water main. For properties with water main located along 2 or more sides of the lot, the water main connection fee shall be determined using the property line that is considered the Front Yard lot line. For properties that do not have a consistent width throughout the depth of the lot, the average lot width shall be considered in determining the property frontage adjacent to the City's water main facilities for calculating the water main connection fees. The applicant shall be responsible for all costs related to the installation of the water service and / or water main to the property. BE IT FURTHER RESOLVED, by the Fairfax City Council of the City of Fairfax, Iowa, that the Mayor and City Clerk/Treasurer are hereby authorized and directed to execute said resolution. Passed and approved this 1 lth day of October 2022. AYES: Daly, Pacha, NAYS: None ABSENT: Nurre Volk, and Wainwright ,�..... , � c , i` �/ ,, Marianne inwright Mayor Pro Tempore ATTEST: � 1 ,4�� � � c Cy hia Stimson, City Clerk/Treasurer .4 �-'�'x�. rx@ .t..z... f �i ;YJ