Loading...
HomeMy WebLinkAboutRESOLUTION NO. 2022-111RESOLUTION NO. 2022-111 RESOLUTION TO FILE PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND OPINION OF PROBABLE COST; SET A TIME AND DATE FOR A PUBLIC HEARING; AND SET A TIME AND DATE TO RECEIVE BIDS FOR CONSTRUCTION OF THE 2023 CITY PARK LIGHTING PROJECT BE IT RESOLVED, By the City Council of the City of Fairfax, Iowa, that plans, specifications, form of contract, and opinion of probable cost for the 2023 City Park Lighting Project have been filed with the City Clerk. BE IT FURTHER RESOLVED, that the Public Hearing for the plans, specifications, form of contract, and opinion of probable cost for the 2023 City Park Lighting Project shall be held at the City Council Meeting on Tuesday, January l Oth, 2023, at 6:00 PM at Fairfax City Hall. BE IT FURTHER RESOLVED, that bids shall be received on Wednesday, January 18t", 2023, at 2:00 PM in the office of the City Clerk for the construction of the 2023 City Park Lighting Project; and NOW, THEREFORE, BE IT RESOLVED, By the City Council of the City of Fairfax, Iowa, that the Mayor and City Clerk are hereby authorized and directed to execute said Resolution. Passed and approved this 14th day of December, 2022. AYES: Nurre, Daly, Pacha, and Wainwright NAYS: None ABSENT: Volk � �W �G�Y'�Y�fV _'._. {,+., ,: , .,. �� Marianne Wainwright, ` r Pro Tempore ATTEST: � '� ' � � , � ��� � � Cy ' hia Stimson, City Clerk/Treasurer , .;> , �}�� DESIGN v $\ 4 � �� , � : _ � .. , �= , � ,... ..� ._, � . � ,,� � . � � ,. N��,. � ,_ MECHANICAL & ELECTRICAI CONSULTANTS DATE: 12/9/2022 PROJECT NAME: FAIRFAX CITY PARK LIGHTING PROJECT Project number 21056 � � �� City Complex Retrofit existing trail lights to LED $ 24,000 Retrofit existing Parking Lts to LED $ 27,000 Add LED Trail Lts $ 130,000 Veterans Memorial $ 21,000 Dog Park Light and Recpts $ 15,000 Pole Receptacles $ 20,000 Total $ 237,000 Hawks Ridge Add Trail Bollards $73,000.00 Parking Lot Area Light $5,000.00 Pavillion Lights $8,500.00 Total $86,500.00 City Complex Total $ 237,000 Hawks Ridge Total $ 86,500 Entire Project Total $ 323,500 STATEMENT OF PROBABLE CONSTRUCTION COSTS Statements of Probable Construction Costs prepared by Design Engineers, P.C., represent our best judgments as design professionals familiar with the construction industry. However, neither Design Engineers, P.C. nor the Owner has control over the cost of labor, materials or equipment, over the Contractor's methods of determining bid prices, or over competitive bidding, market or negotiating conditions: Accordingly, Design Engineers, P.C. cannot and does not warrant or represent that bids or negotiated prices will not vary from the Project budget proposed, established or approved by the Owner, if any, or from any Statement of Probable Construction Cost prepared by Design Engineers, P.C. 8801 PRAIRIE VIEW LANE SW 437 S YELLOWSTONE DR CEDAR RAPIDS, IA MADISON, WI � n, c �i:t 605.424 Rq:I 5 ��._.a,-�.z�_, _ NOTICE OF PUBLIC HEARING FOR THE 2023 CITY PARK LIGHTING PROJECT DESCRIBED AS: Adding new lighting, upgrading existing lighting, and all associated electrical work required to complete the lighting improvements throughout the Fairfax Regional Sports & Park Complex located at 625 Linn Street and Hawks Ridge Park located at 390 West Prairie Drive in the City of Fairfax. Contract No. 6950-22-03 At 6:00 PM, local time, on the 10'" day of January, 2023 at the Council Chambers, 300 80th Street Court Fairfax, lowa, a public hearing will be conducted by the Fairfax City Council on the proposed plans, specifications, form of contract, opinion of probable cost, and the proposed improvements described thereby for the 2023 City Park Lighting project. The Fairfax City Council has previously filed these documents with the City Clerk of the City of Fairfax, lowa. The City Engineer's opinion of probable construction costforthe Work is $323,500.00. The proceedings ofthe City Council referring to the proposed plans, specifications, form of contract, and cost opinion are also made part of this notice. At this hearing, any interested person may appear and file written and/or oral objections to these documents and the proposed improvements. By order of the City Council, City of Fairfax. Dated this 14th day of December, 2022. Cynthia Stimson, City Clerk/Treasurer Published in the Cedar Rapids Gazette on the 24'h day of December, 2022.