Loading...
HomeMy WebLinkAboutRESOLUTION NO. 2022-112RESOLUTION NO. 2022-112 RESOLUTION TO FILE PLANS, SPECIFICATIONS, FORM OF CONTRACT, AND OPINION OF PROBABLE COST; SET A TIME AND DATE FOR A PUBLIC HEARING; AND SET A TIME AND DATE TO RECEIVE BIDS FOR CONSTRUCTION OF THE 2023 HEARTLAND I3EIGHTS NEIGHBORHOOD PARK PROJECT BE IT RESOLVED, By the City Council of the City of Fairfax, Iowa, that plans, specifications, form of contract, and opinion of probable cost for the 2023 Heartland Heights Neighborhood Park Project have been filed with the City Clerk. BE IT FURTHER RESOLVED, that the Public Hearing for the plans, specifications, form of contract, and opinion of probable cost for the 2023 Heartland Heights Neighborhood Park Project shall be held at the City Council Meeting on Tuesday, January l Oth, 2023, at 6:00 PM at Fairfax City Hall. BE IT FURTHER RESOLVED, that bids shall be received on Wednesday, January 18th, 2023, at 2:00 PM in the office of the City Clerk for the construction of the 2023 Heartland Heights Neighborhood Park Project; and NOW, THEREFORE, BE IT RESOLVED, By the City Council of the City of Fairfax, Iowa, that the Mayor and City Clerk are hereby authorized and directed to execute said Resolution. Passed and approved this 14th day of December, 2022. AYES: Nurre, Daly, Pacha, and Wainwright NAYS: None ABSENT: Volk �� , , ;�'�� f'' � � � ��r" C���,�����.- �/ ,, Marianne Wainwright, a or Pro Tempore ATTEST: � /t ;<G�-� �' ' ,li�%2 C� thia Stimson, City Clerk/Treasurer HEARTLAND HEIGHTS NEIGHBORHOOD PARK IN THE CITY OF FAIRFAX, IA PROJECT NO : 6950-21-01 ENGINEER'S ESTIMATE OF COST EST ITEM NO. ITEM CODE ITEM UNIT QUANTITIES 9 2090-D-1 Topsoil, fJrr-site CY 600 2 2010-E-0 Excavation, Class 10 CY 240 3 2010-J-0 Subbase, Modified, 4" SY 192 4' 20�0-J-0 Subbase, Modifie�d, 6"` 5Y 400 5 4010-E-0 Sanitary Sewer Service, 4", PVC SDR 23.5 LF 106 6 4010-I-0 Sanitary Sewer Cleanout EA 2 7' 4fl20-A-1 S#arm Sewer, Trenched, HDPE, Dua1 Walled, 8" l,F ! '130 8 4040-A-0 Subdrain, Type 1, HDPE, 6" LF 117 9 4040-C-0 Subdrain Cleanout, Type A, 6" EA 2 10 4040-C-0 Subtlrain Cleanout, Type A, 18" EA 3 11 5010-E-1 Water Service Pipe, 1", Polyethylene LF 92 12 5020-F-0 Curb Stop Adjustment EA 1 '!3' 7010-A�0 PCC Pavemen#, 6",;Reinforced, Sasketball Gour# 1 SY 373 14 7010-A-0 PCC Pavement, 6", Reinforced, Bike Pad SY 31 15 7010-A-0 PCC Pavement, 7" SY 4 96 7030-E-Q FCG 5idewaik, 4" ' ; SY 187 17 7030-E-0 PCC Sidewalk, 6", Reinforced SY 158 18 7030-G-0 Detectable Warnings SF 20 19,' 7D40-H-0 Paysment Remaval ' SY 4 20 9010-A-1 Seeding, Type 5 Erosion Control Seeding AC 0.6 21 9010-A-2 Fertilizer for Temporary Seeding AC 0.6 22; 9010-B-0 , Hydraulic Seeding, Seeding; Fertilizing, ar�tl Mulching AC 0.6 23 9040-N-1 Silt Fence or Silt Fence Ditch Check LF 609 24 9040-N-2 Silt Fence or Silt Fence Ditch Check, Removal of Sediment LF 609 9040-Q-1 Erosion Control Mulching AC 9040-T-1 Inlet Protection Device, Surface Applied EA 9060-A-0 Chain Link Fence, 81ack Vinyl, 4" Tall LF 9060-F-0 Temporary Fence LF 11,020-A-0 Mobilization LS 12,OQ0 ii Basketball Hoop EA 12,000 Basketball Court Paint, Acrylic LF TOTAL ESTIMATED CONSTRUCTION COSTS �. � e � � � UNIT COST $ 25,00 $ 30.00 $ 12.00 $ ':18,00 $ 85.00 $ 1,500.00 $ 35.00 $ 20.00 $ 750.00 $ 2,OOQ.00: $ 60.00 $ 500.00 $ 75.OQ $ 75.00 $ 80.00 $ 5a.00 $ 75.00 $ 60.00 $ 5Q,00 $ 1,000.00 $ 250.00 $ 7,500.00 $ 2.50 $ 1.00 $ 3,000.00 $ 100.00 $ 70,00! $ 20.00 $ 30,000.00 $ 6,000.00 $ 3.00 $190 TOTAL COST $1 �,OQ $7,20 $2,30 $1 11 $150.00 $4,500,00 $1,522.50 $609.00 $1,800.00 $300.00 91;900,OQ $4,840.00 30,000.00 1$,000.00 $1, 758.00 I:\projects\6900\6950\FY-21\6950-21-01 Heartland Neighborhood Park\Design\ Eng Est-Initial Plans.xlsm Page 1 of 1 12/8/2022 NOTICE OF PUBLIC HEARING FOR THE 2023 HEARTLAND HEIGHTS NEIGHBORHOOD PARK PROJECT DESCRIBED AS: Construction of Heartland Heights Neighborhood Park, which includes site grading, sidewalk/trail installation, basketball court installation and stubbing of utilities for future use, to be located near the intersection of Heartland Street and Eagleview Drive in the City of Fairfax. Contract No. 6950-21-01 At 6:00 PM, local time, on the 10t" day of January, 2023 at the Council Chambers, 300 80t" Street Court Fairfax, lowa, a public hearing will be conducted by the Fairfax City Council on the proposed plans, specifications, form of contract, opinion of probable cost and the proposed improvements described thereby for the 2023 Heartland Heights Neighborhood Park project. The Fairfax City Council has previously filed these documents with the City Clerk of the City of Fairfax, lowa. The City Engineer's opinion of probable construction cost for the Work is $190,000.00. The proceedings of the City Council referring to the proposed plans, specifications, form of contract, and cost opinion are also made part of this notice. At this hearing, any interested person may file written and/or oral objections to these documents and the proposed improvements. By order of the City Council, City of Fairfax. Dated this 14'" day of December, 2022. Cynthia Stimson, City Clerk/Treasurer Published in the Cedar Rapids Gazette on the 24t" day of December, 2022.