HomeMy WebLinkAboutRESOLUTION NO. 99-07-26-3 RESOLUTION 99-07-26-3
Concerning Schedule of Fees for Mechanical Permits and Inspections
WHEREAS, the City Council,Fairfax, Iowa, adopted the Mechanical Regulations
by ordinance on ,T11 T 3Z 1 -1 , ll'999 and
WHEREAS, the Mechanical Regulations authorize the City Council to set
mechanical permit and inspection fees by resolution.
NOW, THEREFORE, BE IT AND IT IS HEREBY RESOLVED by the City
Council, Fairfax, Iowa, this date met in lawful session, and that the attached Mechanical
Permit Fee Schedule, applicable to the erection, installation, alteration, repair,
relocation, replacement, addition to, use or maintenance of. any heating, ventilating,
cooling, refrigeration systems, incinerators or other miscellaneous heat-producing
appliances within the jurisdiction, is adopted and shall be, by this action, effective
July 26- 1999.
cgaili,edj:fairfax:ordinance 219b
t
MECHANICAL PERMIT FEE SCHEDULE
as printed under Section 113 Uniform Mechanical Code
CODE BK NO. DESCRIPTION OF WORK NO. FEE TOTAL
I Fuimace and ducts up to and including 100�,0100 BTU's................. $13,25
2 Each appliance or piece of equiptment regulated by this code but no fee listed...,,, $ 9.50
3 Furnace and ducts over 100,000 BTU's............ ......................................... ...... $16,25
4 Floor Furnace...,....... .......... ..... ................................. ...... $13.25
5 Suspended recessed wall or floor mounted unit heater........ ...............;1................. $13.25
6. Installation relocation replacement of each appliance vent not included in
appliancepermit.............;....................—................................................... $6.50
7. Repair of,alteration of or addition to heating,refrigeration, comfort cooling
unit...................... ................1............ ................ .................... $12.25
S. Compressor or Boiler up to and including 3 horsepower or absorption system
up to an including 100,000 BTU's.................................................___.............. $13,15
9. Compressor or Boiler over 3 horsepower to 15 horsepower or absorption
system over 100,000 BTU's to 500,000 BTU's..................................................... $24.25
10, Compressor or Boiler over 15 horsepower to 30 horsepower or absorption
system over 50,000 BTU's to 1,000,000 BTU's................................ ........... $33.25
11. CIDI-npreSSOr or Boiler over 30 horsepower to 50 horsepower or absorption
system over 1,000,000 BTU's to 1,750,0�00 BTU's............................................. $49.50
12. Compressor or Boiler over 50 horsepower or absorption system over
' $82.75
1,750,000 BTU's.,................................ .................................................. .............
13. For each-as piping system of one(1) to four(4)outlets.................................... $ 5.50
14, For each gas piping system of five(5)or more, per outlet................................... $ 1.00
15.Air Handling unit and ducts up to and including 10,000 cubic feet per minute,. $9.50
16.Air Handling unit and ducts over 10,0010 cubic feet per minute....................... $16.00
17.Evaporative cooler other than portable....... ............................................... $9,50
18. V'entilgtion and Exhaust. For each ventilation system which is not a portion of
heating or air-conditioning system...._........-.................. ........................__...... $ 9.50
For the installation of each hood which is served by mechanical exhaust,
including the ducts for such hood.......... ............................................................. $ 9.50
19, Incinerators. For the installation or relocation of each domestic-type
incinerator............................................ .................................... ........................... $16.25
For the installation or relocation of each commercial or industrial-type
incinerator........................................................................................................... $66J0
20.Base Permit Fee-In addition to above fees, for each permit-add.. .........,. $22.00
NOTE:A separate permit is SUB-TOTAL
required for all electrical work PENALTY(Double Permit Fee)
TOTAL FEE