HomeMy WebLinkAboutRESOLUTION NO. 2005-61 RESOLUTION NO. 00'4 -
RESOLUTION APPROVING CHANGE ORDER NO. I FOR
AERATED LAGOON MODIFICATION PROJECT,
DIVISION I--FLOATING MECHANICAL,AERATORS
WHEREAS, The City Council of Fairfax, Iowa has contracted with Aeration
Industries International, Inc. for the construction of the Aerated Lagoon Modification
Project, Division I-Floating Mechanical Aerators, within the corporate limits; and
WHEREAS, The city engineers, Hall and Hall Engineers, Inc. have
recommended Change Order No. 1 for an increase of$0.00, to substitute 5 HP standard
efficiency motors for 5 HP high efficiency motors, substitute tri-float assemblies for two
pontoon floatation assemblies, provide all steel parts with hot dipped galvanizing and
increase warranty from two years to three years.
BE IT RESOLVED, To approve Change Order No, 1 for the Aerated Lagoon
Modification Project, Division I-Floating Mechanical Aerators, which will result in an
increase of$0.00 to make a total contract cost amount of$39,300.00.
NOW, THEREFORE, BE IT FURTHER RESOLVED, By the Fairfax City
Council of the City of Fairfax, Iowa, that the Mayor and City Cleric are hereby authorized
and directed to execute said Resolution.
Passed and approved this L�Lek-
day of ,
2005.
AYES:
F-A ILE I
NAYS:
ABSENT: �p�
Bill Voss,Mayor
ATTEST:
Connie Frame, City Cleric
The foregoing Resolution No.
. __�y having been approved this date by the
Fairfax City Council, I hereby approve the same by affixing, my signature as City Clerk
on ttts
day of o ,41x, , 2005.
Connie Frame, City Clerk
DHANGE ORDER NO... I
PROJECT: AERATED LAGOON MODIFICATIONS
DIVISION I— FLOATING MECHANICAL AERATORS
CITY OF FAIRFAX, IOWA
DATE: November 23, 2005
CONTRACTOR: AERATION INDUSTRIES INTERNATIONAL, INC.
MINNEAPOLIS, MINNESOTA
ORIGINAL
CONTRACT AMOUNT: $3'9,300.00
REVISED CONTRACT
COMPLETION DATE: Beneficial Use—December 15, 2005
Entire Contract— May 30, 2006
ITEM #1: Substitute 5 HP standard efficiency motors for 5 HP high efficiency motors originally
specified, substitute tri-float floatation assemblies for two-pontoon floatation assemblies
originally specified, provide all steel parts with hot dipped galvanizing and increase
warranty from two years to three years, per attached.Aeration Industries International, (Inc.
Revised Scope of Supply, dated 11-22-05.
TOTAL = $0.00
Original Contract Amount: $39,300.00
Estimated Increase C.O. #1 $0„00
Revised Contract Amount: $39,300.00
Aeration IVdustries International, Inc. Hall Hall Engineers, Inc.
i n
By: r .r✓r2 i B
e
Title: J c_y "e Title:
T
Date: 1� t GYM Date: z ' )
City of FANFAX, lA
By: yz���
Title: z -
Date:_Z t
0Aaocuments and Settings7oddWI-ocal SettingslTemporary Internet Files101-K59M.011(Document-MechAerators.doc
W I *+'
� aledtJ n� in ca rp a -0
LIJ
< Cr
a � W.
x-
" dC`
C7 N G"e N C3
V R�� r"➢ �° � `„i ,� Q
fil .MI5 [9
lull
in
_too -
1-4 kn
t+7
. .
4f9 H Gni
+ 1 tit e GR *n
x00 Ci
iJ� ri CJ C' Gc�
u
4.4
< ^u C^. Ga taiis
fd r i 'r .04 7D i,ti 4C7 r
F aiz w 'A 9d°7 0 M'>4 no W
W
Lt)
=:
Y W 1 a M7 ra Ck '
+, n X
kr rsa , ¢: W to
yw
K`� t 5f E`er 0 N [Yt C. �. ,4,f r� L
r 0 t3a eLw C? 0 r. On c
Lew ii S e-E r-i V} W) r• CYt E-4
i