HomeMy WebLinkAboutRESOLUTION NO. 2006-94 Part 2 RANGE ORDER NO. 3 PROJECT: 2006 WASTEWATER TREATMENT PLANT IMPROVEMENTS CITE,`OF FAIRFAX, IOWA DATE. November 22, 2006 CONTRACTOR: . KLIEIMAN CONSTRUCTION, INC. CEDAR RAPIDS, IOWA ORIGINAL CONTRACT AMOUNT: $2,065,781.00 CONTRACT COMPLETION DATE: August 31, 2007 for begin process operation; November 1, 2007 for Contract. Liquidated damages will not apply to delays involving Section 11700—Communications and Controls. REASONS FOR ORDERING CHANGE OR EXTRA WORK: Item No. 1 change was made to monitor and control the clarifier air-lift blower air pressure. This switch was added to assist the operator in diagnosing sludge return status from the cliarifiers. ITEM No. 1: Provide an outdoor-rated air pressure switch for clarifier air-lift blower, including additional controlwiiring: Automatic Systems= $350.00 plus 15% 0 & P= $52.50 Ross Electric= $1,175.00 plus 10% 0 & P= $117.50 Subtotal net change for C.O. #3 = $1,695.00 plus bond) premium = (0.635%x$1.695,00) $10.76 Total net change for C.O.#3 = $1,705.76 Reprised Contract Amount from C.O.#2: $2,064,162.72 Increase for C.O. #3 _ $1.705,76 (Revised Contract Amount: $2,066,868'.48 KLEIMAN CONSTRUCTION, ING, Recommended by Hall & Hall Engineers, Inc.. (,Y p Title: W'2, Title; Date:Z Date: City of FAIRFAX,, IIA By: Title: Dater EEWAN CONSTRUCTION ENC. 6205 LOCUST RD. S.W. CEDAR RAPIDS,IA 52404 DATE. 71122106 CL"XGE ORDER REQ UESTINO: 3 REVISED ARCHUECT: PROJECT: 2006 Wastewater Treatment Plant Improvements Hall&Hall Engineers,Inc. 480 Front Street 1860 Boyson Road Fairfax,Iowa 52228 Hiawatha,Iowa 52233 PROJECT NO: A.TTN: Dennis Keitel CONTRACT DATE:', 6/26/06 A CHANGE IN THE SCOPE OF WORK AND/OR SPECIFICATIONS IS INDICAI`ED BELOW. TIDE OWNER!S PROMPT RESPONSE IS REQUESTED, 1. Description of Change: The following changes in cost are for changes to the communications and controls system that NIMS Consultants have asked our supplier,Automatic Systems to make(see attached): Item No.1—Provide an outdoor-rated air pressure switch for the clarifier air-lift'blower including additional control wiring: Automatic Systems Co........................ ............................................................................ $ 350,00 !toss Electric................................... ................................................................................ $ 1,175.€10 Item No.2—Provide screening channel high alarm circuitry including engineering and programming—Automatic Systems to provide at no charge................................................ $ 0.00 !Lear No.3—Increase the horsepower for the VFD's for blowers#1,#2, &#3 from 40,HP to 50 HP—Elected not to do.................................................................................... $ 0.00 SUBTOTAL $ 1.,525.00 15%OVERHEAD&PROFIT ON MATERIAL $ 53.04 10%OVERHEAD&PROFIT ON SUBCONTRACT $ 118.00 .0058+10%BOND PREMIUM $ 11.00 TOTAL CHANGE ORDER REQUEST $ 1.,707.00 2. It is requested that the completion date be( )unchanged( )extended by x calendar days. TIME EXT NSTIONT—Liquidated damages for ava� and all delays resaltflng'krGm Change Orders invah,ing Specification Section 11700—Communications&Controls mast bewahed. 3. ]Basis of Payment: a. ( X )ADD( _ )DEDUCT( )NO CHANGE $ 1,707.00 TO/FROM the Contract Price, b. Time and material per Contract G, As per unit prices in Contract d. Other basis: Lump sum 4. Additional Terms and Conditions: EL Quoted prices are guaranteed for a period of 8 calendar days from submittal date, b. Separate requests for time extensions will be considered valid and acceptable if no response is received within 10 calendar days from date of submittal. Submitted By: '?e!SaosraQ �, il<u rass Thomas E.Kleiman,President Approved By: Dennis J.Keitel,P.E. William Vass,Mayor Hall&hall Engineers,Inc. City of Fairfax C;1Docvmen4sia d Settiagsldjk1,Local SettingslTemporary Intema FEes�OLKZ 1'�CGR#3 Revised.doc KLEIMAN CONSTRUCTION INC. 6205 LOCUST RD. S.W. CEDAR RAPIDS,IA 52404 DATE. 12/11/06 CHANGE ORDER REO VEST NO--, 4 REVISED ARC)-I CT: PROJECT: 2006 Wastewater Treatment Plant Im rovements Ball&hall Engineers,Inc. 480 Front Street 1860'Boyson Road Fairfax,Iowa 52228 Haw'atba,Iowa 52233 PROJECT NO: ATTN: Dennis Keitel CONTRACT DATE: 6126106 A CHANGE IN THE SCOPE OF WORK AND/OR SPECIFICATIONS IS INDICATED BELOW. TBE OWNERS PROMPT RESPONSE IS REQUESTED. 1. Description of Change: The following"possible changes"to the Lakeside Clarifier weir plates and troughs were requested by Randy Krutzfield of MMS Consultant: To change the 1/411 steel weir plates and 1/a"'s'teel troughs to: OPTION NO.I—%11 fiberglass weir plates with'/a"steel troughs. Lakeside Equipment Corporation...................................................................................... $ 6,y450 15%OVERHEAD&PROFIT $ 00 2%BOND PREMIUM TOTAL ADD OP'T'ION NO. 1 $ 7,56 . OP'T'ION NO,2—1/4"fiberglass weir plates with 3/16"steel trotnghs. Lakeside Equipment Corporation......... ............................................................................ $ 5,920 -11 15% OVERHEAD&PROFIT $ 8.00 2%BOND PREMIUM $ 6.00 TOTAL ADD OP'T'ION NO.2 $ 6;944. i 2. It is requested that the completion date be( _ }unchanged( x )extended by calendar days. All calendar days that expire after Na-iember 15,2066 plus thirf3�(30)days until resolntaun of this praposnl is achieved,far release of shop drawings. 3. Basis of Payment: a. ( )ADD( )DEDUCT( _ )NO CHANGE $ VOID TO/FROM the Contract Price. b.. Time and material per Contract c. As per unit prices in Contract d. Other basis: Lump sum 4. Additional Terms and Conditions: a. Quoted prices are guaranteed for a period of 8 calendar days from submittal date. b. Separate requests for time extensions will be considered valid and acceptable if no response is received within 10 calendar days from date of submittal. Submitted By: Countersigned By: Warren Williams,Proj.Mgr.. Thomas E.Kleiman,President Approved By: Dennis J.Keitel,P.E. William Voss,Mayor Hall&hall Engineers,Inc. City of Fairfax CA1Domments amid Setdngsldjk'Lccal Setting%lTemparary Intemet File\OLK21TGR 94 Yevised.doe