Loading...
HomeMy WebLinkAbout2009-35 PARTIAL PAYMENT #3 ARENSDORF EXCAVATING EAST DRAINAGE PROJECT CEMETERY ROAD I RIESOLUTION NO. 2009-35 A RESOLUTION TO ISSUE PARTIAL,PAYMENT #3 TO ARENSDORF EXCAVATING & TRUCKING,INC. FOR THE EAST DRAINAGE WAY PROJECT ON EAST CEMETERY ROAD WHEREAS, The City of Fairfax, Iowa has contracted with Arensdorf Excavating and Trucking, Inc. for the East Drainage Way Project on East Cemetery Road, and WHEREAS, The City engineers, Hall & Hall Engineers, Inc. has reviewed. Arensdorf Excavating and Trucking, Inc.'s Partial Pay Request No. 3 for work through 07-07-09 and have found it to be in accordance with their 'Schedule of Values and work completed to date and has, therefore, recommended payment of $65,253.52 on the Contract for the East Drainage Way Project on East Cemetery Road. NOW, THEREFORE, BE IT RESOLVED, By the City Council of the City of Fairfax, Fairfax, Iowa, that the City Clerk is hereby directed to issue Partial Payment No. 3 in the amount of $65,253.52 to Arensdorf Excavating and Trucking, Inc. for the East Drainage Way Project on East Cemetery Road. BE IT FURTHER RESOLVED, By the Fairfax City Council of the City of Fairfax, Iowa, that the Mayor and City Clerk are hereby authorized and directed to execute said Resolution. Passed and approved this 14th day of July, 2009, AYES: Beer, Rabe, Magers, and Wainwright NAYS: None ABSENT: Frieden Bill Voss, Mayor ATTEST: q Cin 'a Stimson, City Clerk APPLICATION FOR PAYMENT APPLICATION NO. 03 Project: EAST DRAINAGE WAY PROJECT ON EAST CEMETERY ROAD FAIRFAX, I-I' N COUNTY, ]OVVA Contractor: Arensdorf Excavating:end"Frac kinn !rK 9802 Co. Rd X-40 Anarnosa, iota 52205 Owner: Cty of Fairfax, Iowa Original Contract Amount: $170,00872 Revised Contract Amount(After CO#3): $161,173.82 Date: July 7, 2009 The Contractor noted above, in accordance with the provisions of the cointract documents, hereby requests approval of this appilication for payment on the following estimates of contract work completed: Original Contract Work Completed $ 127,177.32 Materials Stored On Site $ - Change Orders: , Change Order No. Date Approved. Amount I May 12: 2009 7 (6,979.70) 2 NOT APPROVED $ 3 July 14, 2009 $ (1,865,20) - Total Change In Contract Amount from Change Orders (8,834.90) Total Change Order Work Completed $ 29,440.10 Total Complete and Stored to Date $ 156,1617.42 Retainage 5% $ 7,830.87 Total Complete and Stored to Date Less Retainage $ 148,786.55 Less Previous Payments $ 83,533.03 Current Payment Due $ 65,253.52 Distribution: Owner V Engineer Contractor Other Page I of 3 718/2009 I i CONTRACTOR'S CERTIFICATION: The undersigned Contractor certifies„to the best of the Contractor's knowledge, that the above information and estimated values of completed work covered on this Application for Payment have been completed in accordance with the provisions of the Contract Documents,that all amounts have been paid by the Contractor for work for which (previous Applications for Payment have been made and payments received from the Owner, and that the current payment billing requested is now due. Contractor's Authorized Representative* �``� By: � te_ r Gate: --- B I ENGINE ERWARCHITECTI S RECOMMENDATION: � In accordance with the provisions of the Contract Documents and based on the Engineer's/Architect's on- site observations of the work included in this Application for Payment and based on the Engineer's/Architect's review of this Application for Payment including the accompanying supporting data, and to the best of the Engineer's knowledge, information and belief, the work included in this Application for Payment is completed substantially in conformance with the Contract Documents and payment by the Owner is hereby recommended. Engineer's/Architect's Authorized Representative: By: l Dater CITY OF FAIRFAX PAYMENT RECOMMENDATION, Payment to the Contractor is hereby recommended based on the Application for Payment submitted by the Contractor and the Engineer'slArchitect's recommendation. City of Fairfax Authorized Represantative: By: —Date: r,. . ATTACHMENTS REQUIRED: 1. Line Item Schedule of Contract Values Summary, Amounts Completed This Period, and Amounts Completed To Date. Recommend) use of AIA Document G703. 2. tine Item Schedule of Contract Iltdlaterials Stored and)Values(if applicable). ACCOUNTING USE ONLY: Page 2 of 3 717/2'009 f APPLICATION FOR PAYMENT APPLICATION NO.03 Project: FAST DRAINAGE WAY PROJECT ON EAST CEMETERY ROAD FAIRFAX,UNN1COUNTY.IOWA Can6eemr. Arenm�-ffk7 -arbm and Teuddn9 Im _ l En,gre . HallS.tea111F gltlrnerss,tmc Oripinat CaslraarAmwmt 5170.009.77 Uatw J9ty7.20091 18sd SldPri- Th..FerW TUU w It.. Ibm D-riPUnn Units,, Ouue1L11ies L1nxPrtrz I T-W IOVantikg Amonutffi oualilt5l Arn 9nt %.Complete 5. koLT4altiOn LS _ 11 S fi9W.W 85.00050 0.o 50_OO 100 56000.00 Im.00% suSOs Wd Suuh C0mp9alon LAS A $ 3,200.00 53,200.00 025 5809.010 1.00 53 90.00 100.00% Ti�FeC COnA'W 2 off 3. TLS II $ 850.00 8340.00 0 518.010 1.00 5850.00 im.00% 4. TmnpaMy E0ls.d Sed-ert C-NWCv LS IF S 750.00 5750.90 0.25 $187.'$0 1.00 $750.00 100.00% 5 Sill Fen- LF "1.`.509 5 0.90 51,595.00 520 547520 92800 3835M 59.27% 6. Ict.-and Cyt UDi LS I Y Is I 500.00 31.500.00 0 Op ---Lo.00 1.00 $1 500.00 100.00% 7_ Rea-11f Seek 1 Sy 1 326 S 3.00 $90000 124 $lWME 254.00 $76200 1 79.38% R6nuyal ne Slam Sewer Pipe-12" LF 41 $ 15.00 5615.00 0 :5000 41.00 3615.00 109.00% 8, CuWm Ren-A f-%WM re-P€pe-24' LF 59 S 10.00 S9W00 0 51@,00 50.U0 $900.00 100.00% 0. Culxat _ 1A UddasslBad E=avatmand Empenkmwk CY SA25• 3 3.50 318,8'7500 2,275 561;825.00 5,625.00 516,675.00 100.W% 11. SWp&R22MMg Tp 1 C74.1@'00 8 200 38.00.00 2000 SCDOC.W 4.000.00 W.DDD.W 150.00% 12, O Unda59€Q!�-'�'__OQ-sr� (;y '51508 O.FA 33,9m 00 0 50.500500.W $3900.00 h00,om 13. Su rrde SY 292 $ 13.00 $3,796.00 0 50.00 292.00 $3.7564,00 100.00% 5u0grede S�Oi6za0on xdh Crl6lAed Rtxk Cy 1 $ 54.50 354.00 0 59.010 0.00 $0,00 c.W% 14. MaGer�l nn BH Sem 15. C1dva1 P' 24'Dia.RCP )- 55 S 56 W 190-00 15 $1876.80 55.00 53,190.00 100.00% 1fi. Calvet P' 75' LF 77 5 3750 8.887.50 77 187.50 77.00 52887.50 100.00% Elated Fr1d5 t7. rwF COrtaefe Weir 0I dr Wat Inlet Fes,.orifi-21€ 1 5 11 32 22 $11 1 !F5fIm t .22 00 891 100.00%.. a R-and Djap- fE-ung wawIF52 $ 15.00 $780.00 0 80.0052005z $7W.W 199.9044 18. Male 1T Itla.PVC 1NaterMain.lY Dia.PVC G900(lw:lud1ng LF 58 $ 500 $191400 0 '$0.60 53A0 31;914.00 100.00%. ?9. a Ir 51st€Fj2 Wydlatk{Re1 �F."Fire 1 S 1200.M 3{app 00 0 x'40 1.0 !P1,200-OG 1W.00% 20_ H ran 21. p'ti nn andH -YeeS LS 1 Is 1950.00 $105000 1 61.10,00.03 1-00 $hOW 00 1W.00% 22 IftyckneKClassA SF 4,130 $ 7.50 $90,975.00 0 $0!00 0.00 $0.00 0.00% A98(eg2te SurFaan9-9"L2W of . Macadam Stone for Fie.Fnn'ance and Sy !9s 5 mw 11,710.W 95 $4,7tlRA.00 95.09 $1.710,00 100.00% 23. Ore' a Cn - A93m9a9eSWtaasg-5L.Wclf Sy 292 $ 13.su 53,84200 130 61:Y55.00 135.00 81,755.00 44.52% 24. Mamdam Stone Aggreowe Sutfaong-3't„yyer or Claw BY 292 S 11.00 $3,212,00 254 S2'79cw 254.0 82,79450 869996. 25. Chdrs Stene 26_ Sed C2@1 Dual Ap0mation SY 242 5 25.00 1 $7300.00 0 $0.00 9.tm _$0.00 0.00% Hydraseed,with Li0a MuLh Tno>Mog FplS'fging,and N. &M9 SF '', '90,000 5 000 $5,40000 90,500 $5„100-00 90,500.00 $5,500.00 100.00% 27. -M E,oSmn T.*A Orals Mi. 13ydmseedmq vAlh Liquid MUth 9MICr, itdudm9 Felli!Ll g,end MVlydfeg(fad SF 7.ry,10n01 $ 0.07 S5,250.00 75,U00 35„250.00 75,000.00 55,250.00 100,00% 28. Grass 29. wWed Eaftior Mat SF 5!5;1050 5 0.11 5506000 44,640 54„970.40 'A.mm S4 910A0 81.16%. 4"Foam 1na91aBon-OvM Sanihry Sr SF' W 520 5 &OD 5ZGW. 0 '40.00 520 50. $2,650.00 1000034 50. ereand Water Main 31- 0arr<en4a CuWen10'XSRCB LFP2. 5 498.00 $3735208 0 319.50 9290 337,3G?00 1110-mg 32. GOnae0e Gu4'artH g10'X9RCB P. 2 is 3,22000 56,440,00 D '911.04 2.50 56,gg0.00 150,00% COMPLITED TOTAL®D(nFN.S I TI4RCO1GH 3100= 3170,000-1 539,247.92' S127,177.32 74JIt y. retAxemiAL6 nURED ON SITE ITEM DESCRIPTION IJNWS I QUANTITY PRICE PER UNIT TOTAL TOTAL MATERLLLS-RED ON SITE 00 CHANGE ORDER NO. 1 ERevNrrCw.ril ARmr�filniteilh Claes SF 4136 3581 523,998.30 4130 $28,'906.30 4150 523,995.30 100.00% 3 B"Dram TSe,enol.2$fandPi-Clean LF' 656 18.30 $5,444.00 656 S5;444_so 656 e5,444.E0 10¢90%... Scone Fi FaLsc Remove Neter No.25,292 5Y 115eeA525.00 (57,3W.00) Oval leatlon CRAr4GEORDER-WAL $8,634.90 529,440'.1'9 $28,440.19 REVISE3I CONTRACT TOTAL AFTER ALL Q M OIF $161,177.82 S71127177.32 1ORIGINAL CONTRACT WORK COMPLEM11 .OQ MATERIALS STORED ON SITE 529,440.iQ TOTAL CHANGE ORDER WORK COMPLEITD TOFAL WDRK COMPLETEAND STORED MATERIALS 5.50% '1830J3T RETAINAGE TOTAL COMPLETE AND STORED LESS RETAINAGE - -6,33JAT LESS PREVIOUS PAYMENTS - Cl1RfTEIFf PAYMENT IDUE i II I Ye9a1p3 adTrz£0.N1 Project: EAST DRAINAGE WAY PROJECT ON EAST CEMETERY ROAD _ FAIRFAX,LINN COUNTY,IOWA Contractor: Arensdorf Excavating and Trucking Inc Engineer: Hall&Hall Engineers,Inc. Original Contract Amount: $170,008.72 Date: July 7,2009 Bid Prices This Period To Date Item Item Description Units Bid Quantities Unit Price Total Quantity Amount Quantity Amount %Complete 1. Mobilization LS 1 $ 6000.00 $6,000.00 0.0 $0.00 190 $6,000.00 100.00% Subgrade and Subbase Compaction LS 1 $ 3,200.00 $3,200.00 0.25 $80000 1.00 $3,200.00 10000% 2 Testing ') 3. Traffic Control LS 1 $ 850.0 $85090 0 $0.00 1.00 $850,00 1 00.00% 4, Temporary Erosion and Sediment Controls LS 1 $ 750.00 $750.00 0.25 $187.50 1.00 $750.00 100.00% 5 Silt Fence LF 1,550 $ 0.90 $1,395-00 528 $475.20 928.00 $835.20 5987% 6. Clearin and Grubbin LS 1 $ 1 500.00 $1 500.00 0.00 $0.00 1.00 $1,500.00 fl. 0.00% 7. Removal of ExistingSealcoat SY 320 $ 3 oo $960.00 124 $372.00 254.00 $762.00 .38°!0 Removal of Storm Sewer Pipe-12" LF 41 $ 15.00 $615.00 0 $0.00 41.00 $615.00 .00 8. Culvert Removal of Storm Sewer Pipe-24" HE 50 $ 18.00 $900.00 0 $0.00 50.00 $90D.00 10090% 9 Culver 10 Unclassified Excavation and Embankment CY 5,625 $ 3.00 $16,675.00 2,275 $6,825.00 5,62500 $16,875.00 1110.00% 11. Strip&Resp read Topsoil CY 4,000 $ 2.00 $8,000.00 2,006 $4 000.00 4,000.00 $8,000.00 100.00% 12. Dis ose Unclassified Excavation Off-site CY 600 $ 6.50 $3,900.00 0 $0.00 606.00 $3,900.00 100.00% 13. Sub rade Preparation SY 292 -$ 13.00 $3,796-00 0 $D,OD 292.00 $3,796.00 100-00% Subgrade Stabilization with Crushed Rock CY 1 $ 54.00 $54.00 0 $0.00 0.00 $0.00 0.00% 14. Material Contin encBid Item 15. Culvert Pi e�24"Dia.RCP LF 55 $ 58.00 $3,190.00 15 $870.00 55.00 $3,190.00 1 D0.00% 16, Culvert Pipe,15"Pia.RCP LF 77 $ 37.50 $2,887.50 77 $2,887.50 77.00 $2,867.50 10090% Flared End Section,24"Dia.with Toewall EA 1 $ 11.22 $11.22 1 $11.22 1.00 $11.22 100.00% 17. and Concrete Weir at Inlet Remove and Dispose of Existing Water LF 52 $ 15.00 $780.00 0 $0.00 5200. $780.00 100.001 18- Main 12"Dia.PVC Water Main,12"Dia..PVC 0900(Including LF 58 $ 33.00 $1,914.00 0 $0.00 58.00 $1;914.00 100.00% 19- FitOn s) Install Fire Hydrant(Relocate Existing Fire EA 1 $ 1,200.00 $1,200.00 0 $troo 1.00 $1,200.00 100.00% 20. Hydrant) 21. Disinfection and Hydrostatic TestingLS 1 $ 1,000.00 $1,000.00 1 $1,000.00 1.00 $1 000.00 10000% 22. Revetment Class SF 4,130 $ 7.50 $30,975.00 0 $o 00 0.00 $0.00 0.00% Aggregate Surfacing-9"Layer of Macadam Stone for Field Entrance and SY 95 $ 1890 $1,710.00 95 $1,710.00 95.00 $1,710.00 100.00% 23. Draina a Wa Crossin Aggregate Surfacing-5"Layer of Sy 292 $ 13.50 $3,942.00 130 $1,755.OD 13090 $1,75590 44.52 24. Macadam Stone Aggregate Surfacing-3"Layer of Class A SY 292 $ 11.00 $3,212.00 254 $2,794.00 254.00 $2,794.00 86.99% 25, Choke Stone 26. Seal Coat Dual A licatton SY 292 $ 25.00 $7,300.00 0 $0,00 0.00 $6.00 0.00 Hydroseeding with Liquid Mulch Binder, Including Fertilizing,and Mulching SF 90,000 $ 0.06 $5,40000 90,000 $5,400.00 90,000.00 $5,400.00 100.00% 27, Permanent Erosion Control Grass Mix ,.,.. Hydroseeding with Liquid Mulch Binder, Including Fertilizing,and Mulching(Turf SF 75,000 $ 0.07 $5,250.00 75,000 $5,250.00 75,000.00 $5,250.00 100 00% 28. Grass 29. Wood Excelsior Mat SF 55,000 $ 0.11 $6,D50.0c 44,646 $4,910.40 44,640.00 $4,910.40 81.16% 4"Foam Insulation-Over Sanitary Sewer SF 520 $ 5.00 $2,60090 0 $0.00 520.00 $2,600.00100.00% 30- and Water Main 31. Concrete Culvert 10'X 5'RCB LF 92 $ 406.00 $37,352.00 D $o.00 92.00 $37,352.00 10000% 32. Concrete Culvert Headwall 10'X 5'RCB EA 2 $ 3,220.00 $6,440.00 0 $0.00 2,00 $6,440.00 100.00% COMPUTED TOTAL BID (ITEMS 1 THROUGH 30)= $170,008.72 $39,247.82 $127,177,32 74.81 % MATERIALS STORED ON SITE ITEM DESCRIPTION UNITS QUANTITY PRICE PER UNIT TOTAL TOTAL MATERIALS STORED ON SITE $0.00 til I CHANGE ORDER NO. 1 Replace Class A Revetment with Class SF 4130 $5.81 $23,995.30 4130 $23,99530 4136 $23,995.30 100.00% 'I E Revetment 6.Drain Tile,inch 2 Standpipes,Clean 3 LF 656 $8.36 $5,444.80 856 $5,444.60 656 $5,444.80 100.00% .Ili Stone&Filter Fabric Remove Item No.26,292 SY of Seal SY -292 $25.00 -($7,300,06) Coat Dual Application CHANGE ORDER TOTALS $8 834.90) $29,440.10 $29,440.10 REVISED CONTRACT TOTAL AFT $127.177.32 ORIGINAL CONTRACT WORK COMPLETED 0.00 MATERIALS STORED ON SITE -'I $29,440.10 TOTAL CHANGE ORDER WORK COMPLETED TOTAL WORK COMPLETE AND STORED MATERIALS 5.00% 7830.$7 RETAINAGE TOTAL COMPLETE AND STORED LESS RETAINAGE 83 533.03 LESS PREVIOUS PAYMENTS CURRENT PAYMENT DUE { 1 3 I