HomeMy WebLinkAbout2009-46 CHANGE ORDER #1 PRAIRIE CREEK ESTATES DRAINAGE STORM WATERRESOLUTION NO. 2009-46 RESOLUTION APPROVING CHANGE ORDER NO. 1 FOR THE PRAIRIE CREEK ESTATES DRAINAGE SWALE AND STORM WATER DRAINAGE IMPROVEMENTS PROJECT WHEREAS, the City Council of Fairfax, Iowa has contracted with Schrader Excavating and Grading Co., Inc. for the Prairie Creek Estates Drainage Swale and Storm Water Drainage Improvements Project, within the corporate limits; and WHEREAS, Hall and Hall Engineers, Inc., has recommended approval of Change Order No. 1, to increase the contract amount $4,868.75 to add imported topsoil and rip par over engineering fabric and to decrease the contract amount by $7,407.90 to finalize the balancing of actual quantities needed, making the net difference to the contract to be a decrease of $2,539.15. NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Fairfax, Iowa, to approve Change Order No. 1 for the Prairie Creek Estates Drainage Swale and Storm Water Drainage Improvements Project which will result in an decrease of $2,539.15 to make a revised total contract cost amount of $22,255.09. BE IT FURTHER RESOLVED, by the Fairfax City Council of the City of Fairfax, Iowa, that the Mayor and City Clerk are hereby authorized and directed to execute said resolution. Passed and approved this 13th day of October, 2009. AYES: Beer, Frieden, Rabe, Magers, and Wainwright NAYS: None ABSENT: None Bill oss, Mayor ATTEST: r n is Stimson, City Clerk HALL & HALL ENGINEERS, INC. City of Fairfax Memo Date: October 13, 2009 To: Honorable Mayor and City Council From: Richard C. Ransom, P. E. City Engineer RE: Prairie Creek Estates Drainage Swale and Storm Water Improvement Project, FY09 - Pay Application #1 - Final I hereby certify that the above referenced Project has been completed within substantial conformance to the project plans and specifications. The final contract amount for the project is $22,255.09. We have enclosed Pay Application #1 (Final) for the above referenced project and found this request is acceptable in the amount of $22,255.09. Please note the retainage is being released with this final pay estimate. CIVIL ENGINEERING * LAND SURVEYING * LAND DEVELOPMENT PLANNING * LANDSCAPE ARCHITECTURE 1860 Boyson Road, Hiawatha, IA 52233 * Ph: 319.362.9548 * Fx: 319.362.7595 * www.halleng.com PROJECT: Prairie Creek Estates Drainage Swale and Storm Water Drainage Improvements DATE: October 8, 2009 OWNER: The City of Fairfax, Iowa CONTRACTOR: Schrader Excavating & Grading Co., Inc. ENGINEER: HALL AND HALL ENGINEERS, INC. CHANGE ORDER NO. 1 - BALANCING BID ITEM SCHEDULE OF VALUES NO. DESCRIPTION UNIT QTY UNIT PRICE ADJUSTED AMOUNT 3 Silt Fence LF -30 $ 3.50 $ (105.00) 7 10" Dia. HDPE Storm Sewer LF 92 $ 9.90 $ 910.80 9 Scour Stop Over Sod SF -608 $ 13.50 $ (8,208.00) 10 Hydroseeding with Liquid Mulch Binder, Including Fertilizing, and Mulching (Turf Grass) SF 2,950 $ 0.09 $ 265.50 11 Wood Excelsior Mat SF -1,356 $ 0.20 $ (271.20) Add Rip Rap Over Engineering Fabric SF I 975 $ 3.25 $ 3,168.75 Add Imported Topsoil CY 1 170 $ 10.00 $ 1,700.00 NET ADJUSTMENT TO CONTRACT $ (2,539.15) CONTRACT SUMMARY: ORIGINAL CONTRACT AMOUNT $ 24,794.24 CONTRACT AMENDMENT 1 -BALANCING $ (2,539.15) REVISED CONTRACT AMOUNT $ 22,255.09 OWNER BY: TITLE: DATE: CONTRACTOR N 0 / ez BY: TITLE: c t DATE: - G7 l #kTICI ►14-4 7 Page 1 of 1 RESOLUTION NO. 2009-46 RESOLUTION APPROVING CHANGE ORDER NO. 1 FOR THE PRAIRIE CREEK ESTATES DRAINAGE SWALE AND STORM WATER DRAINAGE IMPROVEMENTS PROJECT WHEREAS, the City Council of Fairfax, Iowa has contracted with Schrader Excavating and Grading Co., Inc. for the Prairie Creek Estates Drainage Swale and Storm Water Drainage Improvements Project, within the corporate limits; and WHEREAS, Hall and Hall Engineers, Inc., has recommended approval of Change Order No. 1, to increase the contract amount $4,868.75 to add imported topsoil and rip par over engineering fabric and to decrease the contract amount by $7,407.90 to finalize the balancing of actual quantities needed, making the net difference to the contract to be a decrease of$2,539.15. NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Fairfax, Iowa, to approve Change Order No. 1 for the Prairie Creek Estates Drainage Swale and Storm Water Drainage Improvements Project which will result in an decrease of$2,539.15 to make a revised total contract cost amount of$22,255.09. BE IT FURTHER RESOLVED, by the Fairfax City Council of the City of Fairfax, Iowa, that the Mayor and City Clerk are hereby authorized and directed to execute said resolution. Passed and approved this 13th day of October, 2009. AYES: Beer, Frieden, Rabe, Magers, and Wainwright NAYS: None ABSENT: None Bill oss, Mayor ATTEST: 0 1 ,44 Y�/'��1(-&IIA n is Stimson, City Clerk HALL & HALL ENGINEERS, INC. - - � City of Fairfax Memo Date: October 13, 2009 To: Honorable Mayor and City Council From: Richard C. Ransom, P.E. City Engineer RE: Prairie Creek Estates Drainage Swale and Storm Water Improvement Project, FY09-Pay Application#1 - Final I hereby certify that the above referenced Project has been completed within substantial conformance to the project plans and specifications. The final contract amount for the project is$22,255.09. We have enclosed Pay Application#1 (Final)for the above referenced project and found this request is acceptable in the amount of$22,255.09. Please note the retainage is being released with this final pay estimate. CIVIL ENGINEERING*LAND SURVEYING*LAND DEVELOPMENT PLANNING*LANDSCAPE ARCHITECTURE 1860 Boyson Road,Hiawatha,IA 52233*Ph:319.362.9548*Fx:319.362.7595*www.halleng.com PROJECT: Prairie Creek Estates Drainage Swale and Storm Water Drainage Improvements DATE: October 8,2009 OWNER: The City of Fairfax,Iowa CONTRACTOR: Schrader Excavating&Grading Co.,Inc. ENGINEER: HALL AND HALL ENGINEERS,INC. CHANGE ORDER NO. 1 - BALANCING BID ITEM SCHEDULE OF VALUES NO. DESCRIPTION UNIT QTY UNIT PRICE ADJUSTED AMOUNT 3 Silt Fence LF -30 $ 3.50 $ (105.00) 7 10"Dia.HDPE Storm Sewer LF 92 $ 9.90 $ 910.80 9 Scour Stop Over Sod SF -608 $ 13.50 $ (8,208.00) Hydroseeding with Liquid Mulch Binder,Including Fertilizing, 10 and Mulching(Turf Grass) SF 2,950 $ 0.09 $ 265.50 11 Wood Excelsior Mat SF -1,356 $ 0.20 $ (271.20) Add Rip Rap Over Engineering Fabric SF I 975 $ 3.25 $ 3,168.75 Add Imported Topsoil CY 1 170 $ 10.00 $ 1,700.00 NET ADJUSTMENT TO CONTRACT $ (2,539.15) CONTRACT SUMMARY: ORIGINAL CONTRACT AMOUNT $ 24,794.24 CONTRACT AMENDMENT 1-BALANCING $ (2,539.15) REVISED CONTRACT AMOUNT $ 22,255.09 OWNER BY: TITLE: DATE: CONTRACTOR N 0 / BY: TITLE: c t DATE: /� - "7 "0 ENGINEER BY: TITLE: 90 � � �s DATE: C.7'-o 0 Page 1 of 1