Loading...
HomeMy WebLinkAboutRESOLUTION NO. 2011-34 RESOLUTION NO. 2011-34 RESOLUTION APPROVING CHANGE ORDER NO. 2 FOR THE WATER MAIN REPLACEMENT PROGRAM, PHASE II IMPROVEMENTS WHEREAS, The City Council of Fairfax, Iowa has contracted with Schrader Excavating & Grading, Inc. for the Water Main Replacement Program, Phase II Improvements, within the corporate limits; and WHEREAS, Hall and Hall Engineers, Inc., has recommended approval of Change Order No. 2, for an increase to the contract amount of$4,466.00 as listed below: C.O. #2, Item 1 $4,466.00 To add several culverts as a result of the ditch grading that has taken place on Main Street. Eight inch culverts were used under the driveways to provide drainage along the ditch line and ensure maximum coverage over the pipe. This item includes the cost of supply of the 8" HDPE culverts only. Installation of these additional or substituted culverts will be paid under Line Item#6 from the original bid documents. BE IT RESOLVED, by the City Council of the City of Fairfax, Iowa, to approve Change Order No. 2 for the Water Main Replacement Program, Phase II Improvements which will result in an increase to the contract amount of $4,466.00 to make a revised total construction contract cost amount of$410,764.86. NOW, THEREFORE, BE IT FURTHER RESOLVED, by the Fairfax City Council of the City of Fairfax, Iowa, that the Mayor and City Clerk/Treasurer are hereby authorized and directed to execute said resolution. Passed and approved this 10th day of May, 2011. AYES: Beer, Frieden, Otto, Magers, and Wainwright NAYS: None ABSENT: None `j Jason Rabe, Mayor ATTEST: Cynth a Stimson, City C erk/Treasurer CHANGE ORDER NO. 2 PROJECT: PHASE II WATER MAIN REPLACEMENT IMPROVEMENTS DATE: May 4, 2011 CONTRACTOR: Schrader Excavating and Grading Walford, Iowa ORIGINAL CONTRACT AMOUNT: $ 413,715.81 ORIGINAL CONTRACT COMPLETION DATE: 55 Working Days from March 21, 2011 ITEM #1: Substitution/Addition of 8" HDPE Culverts under Driveways Several culverts have been added to the project as a result of the ditch grading that has taken place on Main Street. 8 inch Culverts were used under the driveways to provide drainage along the ditch line and ensure maximum coverage over the pipe. This item includes the cost of supply of the 8" HDPE Culverts only. Installation of these additional or substituted culverts will be paid under Line Item #6 from the original bid documents. Original Contract Amount: $413,715.81 C.O. #1, Item 1 ($9,269.75) C.O. #1, Item 2 $1,852.80 C.O. #2, Item 1 $4,466.00 Revised Contract Amount: $410,764.86 Schrader Excavating & Grading Co. Hall & Hall Engineers Inc. By: 9r° By: Title: Title: vru-� Date: 7j Date: ElyI7-V/ I r City of Fairfax, Iowa By: Title: Date: 5 ,IAf