Loading...
HomeMy WebLinkAboutRESOLUTION NO. 2012-31 RESOLUTION NO. 2012-31 RESOLUTION TO APPROVE CHANGE ORDER NO. 1 FROM DAVE SCHMITT CONSTRUCTION COMPANY, INC. FOR THE FAIRFAX CITY PARK AND ATHLETIC FIELDS COMPLEX WHEREAS, the City Council of Fairfax, Iowa has contracted with Dave Schmitt Construction Company, Inc. for the Fairfax City Park and Athletic Fields Complex Project, within the corporate limits; and WHEREAS, Hall and Hall Engineers, Inc., has recommended approval of Change Order No. 1 from Dave Schmitt Construction Company, Inc. The original contract amount was $1,329,859.87. This Change Order No. 1 is making the following listed changes in the contract for no net dollar amount change. The final revised contract amount is still $1,329,859.87. 1.A • Remove $3,708.00 from each Baseball/Softball Field (Part of Bid Item No. 63) for a total reduction to the contract of$7,416.00 • Remove $1,854.00 from the Batting Cage pad (Part of Bid Item No. 64) for a total reduction to the contract of$1,854.00 1.13 • Add 900 CY of Borrow Material at $10.30/CY (Bid Item No. 11) for a total increase to the contract of$9,270.00 l.0 • Change the backfill material for the envelope of the 4" PCPT wrapped in filter sock from sand to 3/4 inch clean granular material (Bid item No. 22) for no change to the contract. NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Fairfax, Iowa, to approve Change Order No. 1 Dave Schmitt Construction Company, Inc. for the Fairfax City Park and Athletic Fields Complex Project. BE IT FURTHER RESOLVED, by the Fairfax City Council of the City of Fairfax, Iowa, that the Mayor and City Clerk/Treasurer are hereby authorized and directed to execute said resolution. Passed and approved this 8th day of May, 2012. AYES: Beer, Frieden, Otto, and Wainwright NAYS: None ABSENT: Magers Jasoabe, Mayor ATTEST: n fR&4 Cy thia Stimson, City Clerk/Treasurer CHANGE ORDER NO. 1 PROJECT: FAIRFAX CITY PARK AND ATHLETIC FIELDS COMPLEX DATE: May 8, 2012 CONTRACTOR: Dave Schmitt Construction Company, Inc. Cedar Rapids, Iowa ORIGINAL CONTRACT AMOUNT: $1,329,859.87 ORIGINAL CONTRACT COMPLETION DATE: May 15, 2013 ITEM A: Change the granular surfacing for the infields of both ball diamonds and the batting cage: Change the granular surfacing for the infields and warning tracks of both ball diamonds and the batting cage from 4 inches of crushed limestone over 6 inches of sand (total of 10 inches of granular material)to a 5 inch layer of fine crushed limestone from the Anamosa Quarry mixed with clay MVP mix supplied from Pace Supply. The quantity shall be approximately 10 tons of clay MVP mix in each ball diamond infield, 1 ton of clay MVP mix in each ball diamond warning track and approximately 1/2 ton of clay MVP mix for the batting cage. These Quantities are part of Bid Item No's 63 and 64. Original Contract Amount: $1,329,859.87 C.O. 1.A Remove$3,708.00 from each Baseball/Softball Field— 1 EA for a total of 2 (Part of Bid Item No. 63)for a total reduction to the contract of: -$7,416.00 Remove$1,854.00 from the Batting Cage Pad— 1 LS (Part of Bid Item No. 64)for a total reduction to the contract of: -$1,854.00 Total Reduction to the Contract for this Item: -$9,270.00 Revised Contract Amount: $1,320,589.87 ITEM B: Increase the borrow material by 900 CY to account for the reduced granular surfacing for the infields of both ball diamonds and the batting cage: Increase the borrow material by 900 CY to account for the reduced granular surfacing for the infields of both ball diamonds and the batting cage(Bid Item No. 11). Revised Contract Amount: $1,320,589.87 C.O. 1.13 Add 900 CY of Borrow Material at$10.30/CY (Bid Item No. 11)for a total Increase to the contract of: $9,270.00 Revised Contract Amount: $1,329,859.87 ITEM C: Change the backfill material for the envelope of the 4" PCPT wrapped in filter sock from sand to % inch clean granular material: Change the backfill material for the envelope of the 4" PCPT wrapped in filter sock from sand to 3/ inch clean granular material (Bid Item No. 22). C.O. 1.0 No change in the unit price (Bid Item No. 11)for no change to the contract: 0.00 Revised Contract Amount: $1,329,859.87 Dave Schmitt o tr Company, Inc. Hall & Hall Engineers, Inc. By: By: Title: 7pryf-&� Title: Date: L Date: w /z City of Fairfax, Iowa By. Title: Date: � �t Z