HomeMy WebLinkAboutRESOLUTION NO. 2014-02 RESOLUTION NO. 2014-02
RESOLUTION ESTABLISHING WATER NIAIN CONNECTION
FEES RELATIVE TO THE 2013 PHASE 1 EAST CEMETERY ROAD
RECONSTRUCTION, DRAINAGE, STORM SEWER, WATER
MAIN, AND SANITARY SEWER PROJECT L
WHEREAS, the City of Fairfax has constructed a water main facilities project
known as the 2013 Phase 1 East Cemetery Road Reconstruction, Drainage, Storm Sewer,
Water,M,ain, and Sanitary Sewer Project; and.
WHEREAS, said water main facilities project provides potential water supply
service to a number of properties lying along East Cemetery Road and Highway 151
(Williams Blvd.); and
WHEREAS, the City of Fairfax has determined that portions of the costs of said
water main facilities project shall be reimbursed to the City in the form of connection
fees in accordance with Chapter 40.06 CONNECTION FEE of the City's Code of
Ordinances; and
WHEREAS, the City Engineer has calculated the cost of this water main
facilities project and the fees for connecting property within this project's limits to the
City's water mains that are part of this project.
NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of
Fairfax, Iowa, the following:
1. Water Main Connection Fees for the 2013 Phase I East Cemetery Road
Reconstruction, Drainage, Storm Sewer, Water Main, and Sanitary Sewer
Project shall be as follows:
a. The Connection Fee shall be determined by the property line frontage
lying adjacent to City's water main, and shall be set as $15.345C1Y of
property frontage.
b. The Cortnection Fees established above shall increase at an annual
interest rate of 2.5% for a period of 12 years after the approval of this
resolution.. The first year, calendar year 2014, there shall be no
interest applied to these Connection Fees. After the 12'h year, effective
January 1, 2026, the Connection Fees shall be fixed and shall not
increase after this point.
c. The City maintains the right to adjust the connection fees for
properties that are fronted by the City's water main on more than one
side of the parcel. One practice may be to average the frontage of all
sides of the property that are adj acent to the public water main..
2. For water services and/or water mains larger than 1 in, in diameter, the City
shall also charge a tapping fee in addition to the water main connection fee .for
water services/water mains connecting to the City's water train installed as
part of this 2013 Phase 1 East Cemetery Road Reconstruction, Drainage,
Storm Sewer, Water Main, and Sanitary Sewer Project. These tapping fees
shall be as follows:
a. Up to, incl. 1"dia. water service---No Additional Tapping Fee
b. Up to, incl. "dia. water service—$250.00
c. Up to, incl, 3"dia. water service—$550.00
d. Up to, incl. 4" dia. water service—$990.00
e. Up to, incl. 5" dia. water service_w$1,580.00
f. Up to, incl. 6" dia, water service,,-$2,220.00
g. Up to, incl. 8" dia. water service—$4,000.00
h. Up to, incl. 10" dia. water service—$6,400.00
i. Up to, incl. 12"dia, water service—$9,000.00
3. The City maintains the right to pass on any and all costs that the City may
accumulate as pant of a water service / water main connection to the property
owner benefiting froth this connection.
4. The water main Connection Fees and Tapping Fees shall be paid to the City
Clerk by the applicant prior to the issuance of a building permit or prior to the
applicant's connection to the City's water main.
BE IT FC.1R71WER IM SOLVED, `by the Fairfax City Council of the; City of
Fairfax, Iowa, that the Mayor and. City Clerk/Treasurer are hereby authorized and
directed to execute said resolution.
Passed and approved this 141h day of January,2014.
AYES: Beer,Frieden, Magers, and Wainwright
NAYS: None
ABSENT: Otto
Jasdn'Rabe, Mayor
ATTEST:
Cyr4hia Stimson, City Clerk/Treasurer
�� peh ®.•a�� tr
as .