Loading...
HomeMy WebLinkAboutRESOLUTION NO. 2014-52 RESOLUTION NO. 2014-52 RESOI'.,UTION EXECUTING AN AGREEMENT FOR.DETENTION BASIN REPAIRS AT THE NO'RTHEAS'T' CORNER OF 80,111 STREET AND EAST CEMETERY ROAD IN CONNECTION WITH THE PHASE 2 EAST CEMETERY ROAD STREET RECONSTRUCTION, TRAIL AND DRAINAGE IMPROVEMENTS PROJECT IN FAIRFAX, LINN COUNTY, IOWA WHEREAS, as part of platting Prairie Creek Estates First Addition in the City of Fairfax, Iowa (hereinafter referred to as the CITY), Synergy Development Group, LLC, (hereinafter referred to as the DEVELOPER) reserved the following described parcel for a stormwater detention facility to be owned by the CITY: LOT `A' of Prairie Creek Estates First,Addition in the City of Fairfax, 'Linn County,Iowa, and WHEREAS, the storinwater detention facility has not been accepted by the CITY as it currently does not drain correctly and is in need of repair's,and WHEREAS, said repairs were included in the Phase 2 East Cemetery Road Street Reconstruction, Trail, and Drainage Improvements project,and WHEREAS,Hall &Hall Engineers recommend the CITY enter into an Agreement with the DEVELOPER regarding reirnbursenient of the cost of said repairs and,acceptance of the stormwater detention facility. i NOW, THEREFORE,BE IT RESOLVED,by the City Council of the City of Fairfax, Iowa, that the Mayor and City Clerk/Treasurer are hereby authorized and directed to execute the Agreement for Detention Basin Repairs as described herein, and BE IT FURTHER RESOLVED, by the Fairfax City Council of the City of Fairfax, Iowa, that the Mayor and City Clerk/Treasurer are hereby authorized and directed to execute said resolution. Passed and approved this 13th day of May, 2014. AYES; Beer, Freden, Otto,Magers, and Wainwright NAYS. None Jas*Rabe,Mayor ATTEST: r ��1�AP16bte+.�repro. sr Cyria StrnSc,�a,�, City Clerk/Treasurer AGREEMENT FOR DETENTION BASIN REPAIRS WHEREAS, as part of platting Prairie Creek Estates First Addition in the City of Fairfax, Iowa, (hereinafter referred to as the CITY), Synergy Development Group, LLC, (hereinafter referred to as the DEVELOPER) reserved the following described parcel for a stormwater detention facility to be owned by the CITY: LOT'A' of Prairie Creek Estates First Addition in the City of Fairfax, Linn County, Iowa and WHEREAS, prior to accepting ownership of said property the CITY requires the DEVELOPER repair said stormwater detention facility to allow for adequate drainage, and WHEREAS,the CITY has the Phase 2 East Cemetery RoadStreet Reconstruction,Trail, and Drainage Improvements construction project in the area, and WHEREAS,the following bid items were included in said construction project to be paid by the DEVELOPER for repair of the stormwater detention facility: Subdrain, 6" (Within Detention Basin) 150 LF at$9.75 per LF $1,462,50 Subdrain,Cleanout, 24 In. Dia 1 Each at$770.00 per Each $770,00 Total Detention Basin Repair Cost =$2,232.50 NOW THEREFORE BE IT RESOLVED,that the DEVELOPER agrees to reimburse the CITY the amount of$2,232.50 for repairs to stormwater detention facility,and THEREFORE BE IT FURTHER RESOLVED, that upon receipt of payment from the DEVELOPER and completion of repairs,the CITY shall accept the stormwater detention facility and assume all future maintenance and repairs. Signed this ' ' day of ..._._ '' . 207.4 1 DEVELOPER: CITY OF FAIRFAX: Synergy 'elop ent Group, LLC t� < .Iasort-'Rabe, Mayor .leffr . Iben, Managing Member � P ATTEST9a�ea�omr�ww4p o@ �PD� Cynthia Stimson, City Clerk (� r� SbaaALw r o a o 7 � m m®