HomeMy WebLinkAboutRESOLUTION NO. 2014-81 RESOLUTION NO. 2014-81
RE SOLUTION TO APPROVE CHANGE ORDER NO. 3 FROM,
RATHJE CONSTRUCTION,CO. FOR THE PHASE 2 EAST CEMETERY ROAD
STREET RECONSTRUCTION,TRAIL,AND DRAINAGE IMPROVEMENTS
PROJECT IN THE CITY OF FAIRFAX,LINN COUNTY,IOWA
WHEREAS, the City Council of Fairfax, Iowa has contracted with Rathje
Construction Co. for the Phase 2 East Cemetery Road Street Reconstruction, Trial, and
Drainage Improvements Project within the corporate limits; and
WHEREAS, Hall and Hall, Engineers, Inc., has recommended, approval of
Change Order#3 for a contract increase of$670.00, as described below:
CHANGES IN SCHEDULE: None at this time.
CHANGES IN CONTRACT AMOUNT:
CHANGES IN CONTRACT AMOUNT:
ITEM #11: ADD NEW BID—Clean Out 24" Storm Sewer(June 30, 2014 Flood
Related)
After the June 30, 2014 Flood event there was a large amount of sediment
deposited in the storm sewer recently constructed which discharged into
the tributary that flows to Prairie Creek. Said tributary showed considerable
erosion and sediment damage after a greater than 100-year storm event
occurred. This item is a Lump Sum item in the amount of$670.
SUMMARY OF CONTRACT'ADJUSTMENTS
NO. Description Unit Quantity Unit Price Total
3.1 Clean Out 24"Storm Sewer LS 1 $670,00 $670.00
TOTALS $670.00
NOW, THEREFORE, SE IT RESOLVED, by the City Council of the City of
Fairfax, Iowa, to approve Change Order No. 3 from Ratbje Construction Co. fbr the
Phase 2 East Cemetery Road Street Reconstruction, Trial, and Drainage Improvements
Project for an increase of$670.00, making the new contract amount$975,390.80.
.... .........
......... .............................................. ................. ......... .................. .. ....................................................... .............................................................. ...............................................
BE IT FURTHER RESOLVED, by the Fairfax City Council of the City of
Fairfax, Iowa, that the Mayor and City Clerl.Areasurer are hereby authorized and
directed to exec'ute said resolution.
Passed and approved this 9th day of September, 2014.
AYES: Beer, Frieden, Magers, and Wainwright
NAYS: None
ABSENT: Otto
JasorC, Mayor
l'l
ATTEST:
N.
Cynua Stirnson, City 0-feiOTreasurer
CL lk I
mp
............................................................................................. .................................................................... . ............................ ......................... ... .............
CHANGE ORDER NO. 3
PROJECT: PHASE 2 EAST CEMETERY ROAD RECONSTRUCTION, TRAIL AND
DRAINAGE IMPROVEMENTS
DATE: September 3, 2014
CONTRACTOR: Rathje Construction Co.
Marion, Iowa
ORIGINAL
CONTRACT AMOUNT: $ 973,267.26
REVISED CONTRACT
AMOUNT (C.O. #3): $ 975,390.80
ORIGINAL CONTRACT
COMPLETION DATE: 75 Working Days from April 14, 2014
CHANGES IN SCHEDULE: None at this time.
CHANGES IN CONTRACT AMOUNT:
ITEM #3.1: ADD NEW BID —Clean Out 24" Storm Sewer(June 30, 2014 Flood Related)
After the June 30, 2014 Flood event there was a large amount of sediment
deposited in the storm sewer recently constructed which discharged into the
tributary that flows to Prairie Creek. Said tributary showed considerable erosion
and sediment damage after a greater than 100-year storm event occurred. This
item is a Lump Sum item in the amount of$670.
SUMMARY OF CONTRACT ADJUSTMENTS
NO. I Description Unit Quantity Unit Price Total
C.O. #3.1 1 Clean Out 24" Storm Sewer LS 1 $670.00 $670.00
TOTALS $670.00
Rathje Construction Co. Hall & Hall Enginees, Inc.
By: By:
Title: Title: '`� �`r fM✓}" �'G
Date: �lb�l�l Date:
City of Fairfax, Iowa
By: _
Title:
Date: