Loading...
HomeMy WebLinkAboutRESOLUTION NO. 2014-81 RESOLUTION NO. 2014-81 RE SOLUTION TO APPROVE CHANGE ORDER NO. 3 FROM, RATHJE CONSTRUCTION,CO. FOR THE PHASE 2 EAST CEMETERY ROAD STREET RECONSTRUCTION,TRAIL,AND DRAINAGE IMPROVEMENTS PROJECT IN THE CITY OF FAIRFAX,LINN COUNTY,IOWA WHEREAS, the City Council of Fairfax, Iowa has contracted with Rathje Construction Co. for the Phase 2 East Cemetery Road Street Reconstruction, Trial, and Drainage Improvements Project within the corporate limits; and WHEREAS, Hall and Hall, Engineers, Inc., has recommended, approval of Change Order#3 for a contract increase of$670.00, as described below: CHANGES IN SCHEDULE: None at this time. CHANGES IN CONTRACT AMOUNT: CHANGES IN CONTRACT AMOUNT: ITEM #11: ADD NEW BID—Clean Out 24" Storm Sewer(June 30, 2014 Flood Related) After the June 30, 2014 Flood event there was a large amount of sediment deposited in the storm sewer recently constructed which discharged into the tributary that flows to Prairie Creek. Said tributary showed considerable erosion and sediment damage after a greater than 100-year storm event occurred. This item is a Lump Sum item in the amount of$670. SUMMARY OF CONTRACT'ADJUSTMENTS NO. Description Unit Quantity Unit Price Total 3.1 Clean Out 24"Storm Sewer LS 1 $670,00 $670.00 TOTALS $670.00 NOW, THEREFORE, SE IT RESOLVED, by the City Council of the City of Fairfax, Iowa, to approve Change Order No. 3 from Ratbje Construction Co. fbr the Phase 2 East Cemetery Road Street Reconstruction, Trial, and Drainage Improvements Project for an increase of$670.00, making the new contract amount$975,390.80. .... ......... ......... .............................................. ................. ......... .................. .. ....................................................... .............................................................. ............................................... BE IT FURTHER RESOLVED, by the Fairfax City Council of the City of Fairfax, Iowa, that the Mayor and City Clerl.Areasurer are hereby authorized and directed to exec'ute said resolution. Passed and approved this 9th day of September, 2014. AYES: Beer, Frieden, Magers, and Wainwright NAYS: None ABSENT: Otto JasorC, Mayor l'l ATTEST: N. Cynua Stirnson, City 0-feiOTreasurer CL lk I mp ............................................................................................. .................................................................... . ............................ ......................... ... ............. CHANGE ORDER NO. 3 PROJECT: PHASE 2 EAST CEMETERY ROAD RECONSTRUCTION, TRAIL AND DRAINAGE IMPROVEMENTS DATE: September 3, 2014 CONTRACTOR: Rathje Construction Co. Marion, Iowa ORIGINAL CONTRACT AMOUNT: $ 973,267.26 REVISED CONTRACT AMOUNT (C.O. #3): $ 975,390.80 ORIGINAL CONTRACT COMPLETION DATE: 75 Working Days from April 14, 2014 CHANGES IN SCHEDULE: None at this time. CHANGES IN CONTRACT AMOUNT: ITEM #3.1: ADD NEW BID —Clean Out 24" Storm Sewer(June 30, 2014 Flood Related) After the June 30, 2014 Flood event there was a large amount of sediment deposited in the storm sewer recently constructed which discharged into the tributary that flows to Prairie Creek. Said tributary showed considerable erosion and sediment damage after a greater than 100-year storm event occurred. This item is a Lump Sum item in the amount of$670. SUMMARY OF CONTRACT ADJUSTMENTS NO. I Description Unit Quantity Unit Price Total C.O. #3.1 1 Clean Out 24" Storm Sewer LS 1 $670.00 $670.00 TOTALS $670.00 Rathje Construction Co. Hall & Hall Enginees, Inc. By: By: Title: Title: '`� �`r fM✓}" �'G Date: �lb�l�l Date: City of Fairfax, Iowa By: _ Title: Date: Page 1 of 1