Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
RESOLUTION NO. 2015-20
RESOLUTION NO. 2015a© RESOLUTION APPROVING CHANGE ORDER#11 FOR THE FAIRFAX TRAIL PROJECT ALONG EAST SIDE OF UNNAMED TRIBUTARY TO PRAIRIE CREEK, IDOT PROJECT NUMBER STP-E-2462(601) FROM TAYLOR CONSTRUCTION, INC. WHEREAS, the City Council of Fairfax, Iowa has contracted with Taylor Construction, Inc. for the Fairfax Trail along East Side of Unnamed Tributary to Prairie Creek between East Cemetery Road and Front Street in the City of Fairfax; and WHEREAS, Hall and Hall Engineers, Inc., has recommended approval of Change Order No. 11 from Taylor Construction, Inc. The current contract amount is $857,296.33. This Change Order No. 11 is an addition to the contract amount of $1,980.00, making the new contract amount $859.276.33 as described below: A-Description of change to be made or extra work to be done: 7016—Addition to the Contract for Urban Seeding and Fertilizing (Item Code 2601-2636044)for the disturbed areas south of Prairie Creek. Urban Seeding shall be completed per the GS-12003 Specifications, Effective Date of October 15, 2013, Section 2601.03. The Seed Mixture shall be per Section 2601.03.C.4—Urban Seeding of the GS-12003 Specifications, Effective Date October 15,2013. The area for the Urban Seed bed Preparation and Urban Seeding and Fertilizing located south of Prairie Creek is estimated at approximately 0.6 Acre. The disturbed areas north of Prairie Creek shall be seeded and fertilized with the rural seed mix and fertilizing per the original contract documents. Additional Mobilization shall not be considered as part of this change order because this is a change in the product only, and not an additional work item. B—Reason for change or extra work: Prior to this project, the disturbed area (City Property) located south of Prairie Creek was maintained as a City park,with the grass type and height kept consistent with the residential properties to the south of S. Front Street. The Urban Seed Mixture will allow the City to maintain this area as it had prior to this project. C-1 —Settlement for cost of work to be made as follows: Change Order No. 11 7015 Addition to the Contract for Urban Seeding&Fertilization to be paid at$3,300.00 per Acre at 0.6 Acre: 0.6 ACRE X$3,300.00/ACRE=$1,980.00 C-2—Justification for cost(s) Prior to this project, the disturbed area (City Property) located south of Prairie Creek was maintained as a City park,with the grass type and height kept consistent with the residential properties to the south of S. Front Street. The Urban Seed Mixture will allow the City to maintain this area as it had prior to this project. If Credit Add"CR" D — ITEMS INCLUDED IN CONTRACT Change Unit Price Quantity Amount No. Line Item Number xxx xxx xx 7 016 2601-2636044 Seeding and Fertilizing(URBAN) $3,300.00/ACRE 0.6 ACRE $1,980.00 TOTAL $1,980.00 Contract Amount Prior to Change Order No. 11: $857,296.33 Total Change in Contract Amount with Change Order No. 11: +1,980.00 Contract Amount after Change Order No. 11: $859,276.33 NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Fairfax, Iowa, to approve Change Order No. 11 from Taylor Construction, Inc. for the Fairfax Trail along East Side of Unnamed Tributary to Prairie Creek between East Cemetery Road and Front Street in the City of Fairfax. BE IT FURTHER RESOLVED, by the Fairfax City Council of the City of Fairfax, Iowa, that the Mayor and City Clerk/Treasurer are hereby authorized and directed to execute said resolution. Passed and approved this 10th day of March, 2015. AYES: Beer, Frieden, Otto, Magers, and Wainwright NAYS: None Ja n Rabe, Mayor ATTEST: ,,,,,,• # P`X ..•* .. Q. / ° ter 1 Cy• is Stimson, City Clerk/Treasurer a t cu.;. t.j Form 81024 7@n rA?Iowa Department Of Transportation Non- Change Order Part Part Non-Substantial: ® ❑ No 11 Substantial: ❑ ❑ Concurrence Date Contract Accounting ID No.: 31 155 County Linn Project No: STP-E-2db?(601}-8V-57 Kind of Work: "Trail and Pedestrian Bridge _..._ Date Prepared: March 10,2015 Contractor: Taylor Construction,Inc. You are hereby authorized to make the following changes to the contract documents. A-Description of change to be made or extra work to be done: 7016-Addition to the Contract for Urban Seeding and Fertilizing(Item Code 2601-2636044)for the disturbed areas south of Prairie Creek, Urban Seeding shall be completed per the GS-12003 Specifications,Effective Date of October 15.2013,Section 2601.03. The Seed Mixture shall be per Section 2601.03.C.4-Urban Seeding of the GS-12003 Specifications,Effective Dale October 15,2013. The area for the Urban Seed bed Preparation and Urban Seeding and Fertilizing located south of Prairie Creek is estimated at approximately 0.6 Acre. The disturbed areas north of Prairie Creek shall be seeded and fertilized with the rural seed mix and fertilizing per the original contract documents Additional Mobilization shall not be considered as part of this change order because this is a change in the product only,and not an additional work item. One additional working day shall be allowed as part of this change order because the area of seed bed preparation and seeding/fertilization is almost twice the area indicated in the plan quantities B-Reason for change or extra work: Prior to this project,the disturbed area(City Property)located south of Prairie Creek was maintained as a City park,with the grass type and height kept consistent with the residential properties to the south of S. Front Street The Urban Seed Mixture will allow the City to maintain this area as it had prior to this project. (Continued on reverse side) 5%, ,f/ -lam✓ 3/�,S�i�i� Approved -e .__' District Construction Engineer Date Project Engineer Date Receipt is acknowledged of this change or extra work and terms of settlement are hereby agreed to. Approved contingent upon funds being available under the existing 1 aylur Construction, IIIc project a reement or upon additional Federal-aid funds being Contractor r made available by a modified project agreement. 1 + ? ' By - = L�' t __._ ..__. J f _ Date Date For the Division Administrator Approved i6e Federal Highway Administration Mayo City of Fairfax,Iowa t DISTRIBUTION: Project Engineer-Forward original to District. District-Nonsubstantial-Forward original and one copy to the Office of Construdion and two copies back to the Projed Engineer. -Substantial -Forward original and two copies to the Office of Construction Accounting ID No. 131 ! 1 5 15 1 1 2 3 4 5 6- C-1 —Settlement for cost of work to be made as follows: Change Order No, 11 7015 Addition to the Contract for Urban Seeding&Fertilization to be paid at$3,300.00 per Acre at 0.6 Acre: 0.6 ACRE X$3,300.00/ACRE=$1,980.00 C-2—Justification for cost(s) Prior to this project,the disturbed area(City Property)located south of Prairie Creek was maintained as a City park,with the grass type and height kept consistent with the residential properties to the south of S.Front Street. The Urban Seed Mixture will allow the City to maintain this area as it had prior to this project. If Credit — D- ITEMS INCLUDED IN CONTRACT , Add"CR" ChangeLine Item Number Unit Price Quantity Amount No. .xxx .xxx .xx 7 016 2601-2636044 Seeding and Fertilizing(URBAN) $3,300.00/ACRE 0.6 ACRE $1,980.00 7 7 7 7 7 7 I_ TOTAL $1,980.00 If Credit, E-ITEMS NOT INCLUDED IN CONTRACT Add"CR" Change 1 Item Description Item Number Function Unit Price Quantity Amount No Code .xxx .xxx xx 8 I8 � i3 l 8 8 I 8 TOTAL I