Loading...
HomeMy WebLinkAboutRESOLUTION NO. 2015-62 RESOLUTION NO. 2015-62 RESOLUTION APPROVING CHANGE ORDER##12 FOR THE FAIRFAX TRAIL PROJECT ALONG EAST SIDE OF UNNAMED TRIBUTARY TO PRAIRIE CREEK,IDOT PROJECT NUMBER STP-E-2462(601) FROM TAYLOR CONSTRUCTION,INC. WHEREAS, the City Council of Fairfax, Iowa has contracted with Taylor Construction, Inc. for the Fairfax Trail along East Side of Unnamed Tributary to Prairie Creek between East Cemetery Road.and Front Street in the City of Fairfax; and WHEREAS, Hall and Hall Engineers, Inc., has recommended approval. of Change Order 'No. 12 from Taylor Construction, Inc. The current contract amount is $859,276.33. This Change Order No. 12 is an addition to the contract amount of $2,790.00, making the new contract amount $862,066.33 as described below: A-Description of change to be made or extra work to be done: 7017—Addition to the Contract for Reseeding of Rural Seeding and Fertilizing (Item Code 2601-2636043)of disturbed areas where the original seed has been washed away due to flooding. All seeding shall be completed per the GS-12003 Specifications, Effective Gate of October 15, 2013, Section 2601.03. The Seed Mixtures shall be per Section 2601.03.0.3 Rural Seeding of the GS-12003 Specifications, Effective Date October 15,2013, The area for the Rural Seed Bed Preparation and Reseeding is estimated at approximately 0.5 Acre. Reseeding shall be paid at the Contract Unit Price. Mobilization shall not be considered as part of this change order. 7018--Addition to the Contract for Reseeding of Urban Seeding and Fertilizing(Item Code 2601-2636044)of disturbed areas where the original seed has been washed away due to flooding. All seeding shall be completed per the GS-1'2003 Specifications, Effective Cate of October 15,2013, Section 2601.03, The Seed Mixtures shall be per Section 2601.03.C.4-Urban Seeding of the GS-12003 Specifications, Effective[date October 15, 2013. The area for the Urban Seed Bed Preparation and Reseeding is estimated at approximately 0.3 Acre. Reseeding shall be paid at the Contract Unit Price. 8010--Mobilizations, Erosion Control shall be applicable for the seeding contractor to stage movement of labor, equipment, materials and other incidental items for completion of the reseeding work, per GS-12003, Section 2602. This item shall be paid per incident(1 EA)at the unit price of$500,00 for each Mobilizations, Erosion Control, as specified in GS-12003, Section 2602.05. There is no change in working days due to this change order. Because this work is in addition to the original contract work,working days will not be considered for the Reseeding of the Rural and Urban Seed Mixtures, The Contractor shall complete the Reseeding within the first two weeks of the normal fall seeding dates(August 10„2015 to August 21,2015), B—Reason for change or extra work; On the evening of June 11, approximately 2 weeks after the contractor had seeded the project site,the City of Fairfax received a substantial rain event that was consistent with a 25 year storm event. Prairie Creek rose significantly,as did the unnamed tributary adjacent to the trail. In the area where the unnamed creek turns south,this stream came out of its banks. These areas, as well as a portion of the ditch east of the trail and adjacent to the farm field had the seeding washed away. Contract Amount Prior to Change Order No. 12: $859,276.33 Total Change in Contract Amount with Change Order No. 12: ..+-2,790.00 Contract Amount after Change Order No. 12: $862,066.33 NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Fairfax, Iowa, to approve Change Order 'No. 12 from Taylor Construction, Inc. for the Fairfax Trail along East Side of Unnamed Tributary to Prairie Creek between East Cemetery Road and Front Street in the City of Fairfax. BE IT FURTHER RESOLVED, by the Fairfax City Council of the City of Fairfax, Iowa, that the Mayor and City Clerk/Treasurer are hereby authorized and directed to execute said resolution. Passed and approved this 28"' day of July, 2015. AYES: Beer, Otto, Magers, and Wainwright NAYS: None ABSENT: Frieden Jason Rabe, Mayor ATTEST: Cyt4hia Stimson, City Clerk/Treasurer F A Vy 0 '4 ®RF0,0, Fo„n 83tr24€wd ar(It7 Iowa Department QsP ortatlon Non- IwAo ChangeOrder Part Part Non-Substantial: ❑ j No. 12 Substantial: [] ❑ Concurrence Date Contract Accounting ID No.: 31155 County Linn Project No: STP-E-"2462(601)-8V-57 Kind of Work: Trail and Pedestrian Bride Date Prepared: July 14,2015 Contractor: Taylor Construction,Inc, You are hereby authorized to make the following changes to the contract documents. A_Description of change to be made or extra work to be done: 7017--Addition to the Contract for Reseeding of Rural Seeding and Fertilizing(Item Code 2601-2636043)of disturbed areas where the original seed has been washed away due to flooding. All seeding shall be completed per the GS-12003 Specifications, Effective Date of October 115,2013,Section 2601.03. The Seed Mixtures shall be per Section 2601.03.C.3-Rural Seeding of the GS-12003 Specifications, Effective Date October 15,2013. The area for the Rural Seed Bed Preparation and Reseeding is estimated at approximately 0.5 Acre. Reseeding shall be paid at the Contract Unit Price. Mobilization shall not be considered as part of this change order. 7018--Addition to the Contract for Reseeding of Urban Seeding and Fertilizing(Item Code 2601.2636044)of disturbed areas where the original seed has been washed away due to flooding. All seeding shall be completed per the GS-12003 Specifications, Effective Date of October 15,2013,Section 2601.03. The Seed Mixtures shall be per Section 2601.03.C.4-Urban Seeding of the GS-12003 Specifications, Effective Date October 15,2013, The area for the'Urban Seed Bed Preparation and Reseedinq is estimated at approximately 0.3 Acre, Reseeding shall be paid at the Contract Unit Price. 8010-Mobilizations, Erosion Control shall be applicable for the seeding contractor to stage movement of labor,equipment,materials and other incidental items for completion of the reseeding work,per GS-12003,Section 2602. This item shall be paid per incident(1 EA)at the unit price of$500.00 for each Mobilizations, Erosion Control,as specified in GS-12003, Section 2642.05, There is no change in working days due to this change order, Because this work is in addition to the original contract work,working days wit) not be considered for the Reseeding of the Rural and Urban Seed Mixtures. The Contractor shall complete the Reseeding within the first two weeks of the normal fail seeding dates(August 10,2015 to August 21,2015), B-Reason for change or extra work: On the evening of June 11,approximately 2 weeks after the contractor had seeded the project site,the City of Fairfax received a substantial rain event that was consistent with a 25 year storm event. Prairie Creek rose significantly,as did the unnamed tributary adjacent to the trail. In the area where the unnamed creek turns south,thisstream came out of its banks. These areas, as well as a portion of the ditch east of the trail and adjacent to the farm field had the seeding washed away. j (Continued on reverse side) 7 Approved 1 � I District Construction Engineer Date Project Engineer Date Receipt is acknowledged of this change or extra work and terms of settlement are hereby agreed to. Approved contingent upon funds being available under the existing TaylorConstrucoon,Inc, project agreement or upon additional Federal-aid funds being Contractor made available by a modified project agreement. By y ��7 y . �( Date Date For the Division Administrator Federal Highway Administration Approved Mai 'r, Cit of Fairfax, Iowa �" r y,p y °Date DISTRIBUTION: Project Engineer-Forward prig#nal to District. District-Nonsubstantal-Forward original and one copy bo the Office of Conshuction and Mo copies hark to the ProjectEngfneer. -Substantial -Forward original and two copies to the Office of Construction. Accounting ID No. 3 1 1 8 5 �..i.. � 6 C-1 —Settlement for cost of work to be made as follows: Change Order No. 12 7017 Addition to the Contract for Reseeding of Rural Seeding&Fertilization to be paid at$2,600.00 per Acre at 0.5 Acre: 0.5 ACRE X$2,600.00/ACRE=$1,300.00 7018 Addition to the Contract for Reseeding Urban Seeding& Fertilization to be paid at$3,300,00 per Acre at 0.3 Acre: 0.3 ACRE X$3,300.00/ACRE—$990.00 8010 Mobilizations, Erosion Control for the Seeding Contractors mobilization for reseeding,to be paid per the OS-12003,Section. 2602.05,B.1: 1 Occurrence(i EA)X$500.00 per Occurrence=$500.00 C-2—Justification for cost(s) Portions of the Rural and Urban Seeding were washed away with the June 11,2015 rain event,and need to be reseeded. It Credit D — ITEMS INCLUDED IN CONTRACT ,add"CR" Change Line Item Number Unit Price Quantity Amount No. xxx .xxx xx 7 017 2601-2636043 Seeding and Fertilizing(RURAL) $_-),600_00/ACRE 0.5 ACRE $1,300.00 7 018 2601-2636044 Seeding and Fertilizing(URBAN) $3,300.00/ACRE 0.3 ACRE $9'90.00 7 7 7 7 7 TOTAL $2,290.00 IF Credit, E — ITEMS NOT INCLUDED IN CONTRACT Add"CIR" Change Function Unit Price Quantity Amount No„ Item Description Item Number Code .xxx xxx Ax 8010 Mobilizations,Erosion Control 2602-0010010 $500.00/EA 1 EA $500.00 8 8 8 8 8 .................................. ----------------- �, _ . 8 TOTAL $500.00