Loading...
HomeMy WebLinkAboutRESOLUTION NO. 2016-123 RESOLUTION NO. 2016-1.23 RESOLUTION TO APPROVE CHANGE ORDER NO, 2 -BALANCING FROM RATHJE CONSTRUCTION, CO. FOR THE 2016 80th STREET WATER MAIN EXTENSION PROJECT IN THE CITY OF FAIRFAX,LINN COUNTY, IOWA WHEREAS, the City Council of Fairfax, Iowa has contracted with Rathje Construction Co. for the 2016 80th Street Water Main Extension Project within the corporate limits; and WHEREAS,Hall and Dail Engineers, Inc., has recommended approval of Change Order##2 - Balancing as described below: i HANaE ORDER'N0'..2-BALANCING 1_:..,..._..,...... .................. .. .............. .,.,.,-- ...__._,.... .... „.....::.. SCHEDULE OF VALUP8 . 4 5111 Fence LP -344.44 t 0 2.25 $ 1.425.00 t0 Trench SlatiF¢alion Conlin encyy1'04.04 8 20.00 5 20" 94 ,-, d.00 $ _._... 250.00 11 __ Casln P eorin0 and Jac 0,.3."d@aLF A.'-----(1.1000 00) .'Smee9 ..,.. T-- .. 12 Carrier pl a Inside Cas P!e,18"Dia.PVC VJatterMaln C-900-Jolm Look PI LF -7.00 19 ur ish a Ins a0 5"Dia.04b Vaka4a4 Loa eA 1.00 S 6,800,00 .40 19 FiNW qs for Waler Dlslrbulfoa System _ Ill -S4ad8 $ 6.00 22 Partland Cememl Canarele 0rivewa r De ih i inr4rtdet 6 oe Nr Granular 5uhhase SY -1-00 $ 144.44 $ 140 OD M Remavai of Existing Pavements Ddvewa.5 Curb and Gutter SY 4.00 92.tl0 S 40.Otl TA Remove and Relnslalf Culvert Pip- _ 1.F 6.00 5 50.00 S 300.00 BA Remove and Relnslal€Flared End 5ectlon EA. ,2.00 $ 1,200.04 S 2,400.00 22A Portland Cement Cenorete Driveway,T`Die. (Amaiades 8"De NI Granular Subbase SY -4-00 180,00 $ 560,40 2aA 692re- a 3urfad TQN 7.53�$ I, 210.04 24A }tydroeeeding withh u_ Alulch DTnder ._AG 0_28- -1T 0�4 5TSA Remove and Re lace Stann Sewer 1¢"CMPLF2SA Ra ovate E.istin Ap7oma19c Flushin VaN -4,5427A Rtmve antl Re lace PCC Flurne 6Y. 4.73 047.56 DRIOINALGONTRACTAMOI,NNT iF- 315 071 00 NET'ADJU67MGNT TO CR181NAL CONTRAC'P' S C�2450&hyl... i ORIOINAL46NTRACTWQRK4®rgrLRTE6 �,....:..,.. ...„,�,-.. ,....i .,.. .,.-...... i SCHED71 .. I.E OOf VALUES C01-1 Eros'nn Contro€Malting S1P 1850 IEA 1- 57.02 $ 3 043,90 --...._. _.......m C01.2Silt Socks --_. _10-- .539.80 - 8 398.00 „TOTAL NET ADJUSTMENTtO CONTRACT: - G INEY ADJOSTMENTTO ORIGINAL CONTRAC'Y, s__ TOTAL CHANGE ORDERWDRK 4 3,308.00 - .... TOTAL CONTRACT AMEND?AENT �, ___.....2,153.34:: CONTaACTSUMMARY: [ ORIC'INAL CONTRACTAMOUNT $ 32387'f 00 OONTRACTAMENOMGNT2-BALANCING _. ...__.. _..-i .__. _f__—__.. 2159.34 —— INCGMT7VS+61SINCENTIVE $ 12,500,44 FINAL REVIBGp CONTRACT AMOUNT $ ...335,524.34 NOW, THEREFORE, BE IT REASOLV.ED, by the City Council of the City of Fairfax, Iowa, to approve Change Order No. 2 - Balancing from Rathje Construction Co, for the 2016 80th Street Water Main Extension Project for a decrease of$1,245.66 to the original contract, making the revised final contract amount$338,524.34, BE IT FURTHER RESOLVED, by the Fairfax City Council of the City of Fairfax, Iowa, that the Mayor.and City Clerk/Treasurer are hereby authorized and directed to execute said resolution. Passed and approved this 9th day of November 2016. AYES: Beer, Daly, Kell, and Volk NAYS: None ABSENT: Wainwright Burnell G. P'rieden, Mayor ATTEST: d � r +Cyrhihia K. St mson, City Clerk/Treasurer � ^ 01 -c . 0 r r +a CJS ; d i i a asa6ID�4�