Loading...
HomeMy WebLinkAboutRESOLUTION NO. 2017-46 RESOLUTION 2017-46 A RESOLUTION APPROVING A 28E IOWA DEPARTMENT OF TRANSPORTATION RIGHT OF WAY AGREEMENT FOR PRIMARY ROAD PROJECT - AGREEMENT #2017-1-263 WHEREAS, the Iowa Department of Transportation has drafted a Right of Way Agreement for Primary Road Project #2017-1-263; and WHEREAS, the Hall and Hall Engineers, Inc. has reviewed the Agreement and is recommending approval; and WHEREAS, this Agreement is attached. NOW, THEREFORE, BE IT RESOLVED, the City Council of the City of Fairfax, Linn County, Iowa, does by this resolution enter into the attached 28E Iowa Department of Transportation Right of Way Agreement for Primary Road Project #2017-1-163; and BE IT FURTHER RESOLVED, by the City Council of the City of Fairfax, Iowa, that the Mayor and City Clerk/Treasurer are hereby authorized and directed to execute said 28E Agreement and this Resolution. Passed and approved this 9" day of May, 2017. AYES: Beer, Daly, Kell, Volk, and Wainwright Burnell Frieden, Mayor ATTEST: ��� M Cy is Stimson, City Clerk/Treasurer iuvvAD0T SMARTER I SIMPLER I CUSTOMER DRIVEN wviovrradot.gov District 6 Office I Highway Division 5455 Kirkwood Blvd.SW,Cedar Rapids, IA 52404 Phone:(319)364-0235 1 Fax(319)364-9614 1 Email:jim.schnoebelen@iowadot.us May 23, 2017 REF: NHSN-151-3(147)--2R-57(R0V) NHSX-151-3(158)--3H-57(Const) Linn County City of Fairfax Agreement 2017-1-263 Staff Action No. N/A The Honorable Bernie Frieden Mayor of Fairfax PO Box 337 Fairfax, IA 52228-0337 SUBJECT: Agreement 2017-1-263 FULLY EXECUTED(Unknown pavement -grade and replace on U.S. 151 in Fairfax, from approximately 500 feet south of Church Street to approximately 500 feet west of 80th Street) Dear Mayor Frieden: Attached is your original of the fully executed Agreement 2017-1-263 between the city of Fairfax and the Iowa Department of Transportation for the above referenced project. The project involves: Unknown pavement - grade and replace on U.S. 151 in Fairfax, from approximately 500 feet south of Church Street to approximately 500 feet west of 801h Street. Thank you for your cooperation in the processing of this agreement. Sincerely, qant84 RJ1442" James. R. Schnoebelen, P. E. District 6 Engineer JRS/hmb Enclosure: Agreement 2017-1-263 cc: Deanne Popp Daryl Hart a July 2014 IOWA DEPARTMENT OF TRANSPORTATION Right of Way Agreement For Primary Road Project County Linn City Fairfax Project No. NHSN-151-3(147)-2R-57(ROW) NHSX 151-3(158)-3H-57(Const) Iowa DOT Agreement No. 2017-1-263 Staff Action No. N/A This Agreement, is entered into by and between the Iowa Department of Transportation, hereinafter designated the"DOT",and the city of Fairfax, Iowa,a Local Public Agency,hereafter designated the"LPA" in accordance with Iowa Code Chapters 28E,306, 306A and 313.4 as applicable; The DOT proposes to establish or make improvements to U.S. 151 within Linn County,Iowa;and The DOT and the LPA are willing to jointly participate in said project, in the manner hereinafter provided; and This Agreement reflects the current concept of this project which is subject to modification by mutual agreement between the LPA and the DOT;and Therefore, it is agreed as follows: 1. Project Information a. The DOT will design, let,and inspect construction of the following described project in accordance with the project plans and DOT standard specifications: Unknown pavement-grade and replace on U.S. 151 in Fairfax,from approximately 500 feet south of Church Street to approximately 500 feet west of 80"'Street. 2. Right of Way and Permits a. Subject to the provisions hereof,the LPA in accordance with 761 Iowa Administrative Code Chapter 150.3(1)c and 150.4(2)will remove or cause to be removed(within the corporate limits)all encroachments or obstructions in the existing primary highway right of way.The LPA will also prevent the erection and/or placement of any structure or obstruction on said right of way or any additional right of way which is acquired for this project including but not limited to private signs, buildings, pumps,and parking areas. b. The DOT will be responsible for the coordination of utility facility adjustments for the primary road project. o. The LPA agrees to relocate all utilities necessary for construction which are located within the existing street or alley right of way,subject to the approval of and without expense to the DOT and in accordance with 761 Iowa Administrative Code Chapter 150.4(5)and the DOT Utility Accommodation Policy. 2017-1-263 Fairfax(002) 1 July 2014 d. With the exception of service connections no new or future utility occupancy of project right of way, nor any future relocations of or alterations to existing utilities within said right of way will be permitted or undertaken by the LPA without the prior written approval of the DOT. All work will be performed in accordance with the Utility Accommodation Policy and other applicable requirements of the DOT. e. The LPA shall be responsible for providing, without cost to the DOT, any right of way for the project which involves dedicated streets or alleys, and any other LPA-owned lands which are required for the project, subject to the condition that the DOT shall reimburse the LPA for the value of LPA-owned improvements situated on such other LPA-owned lands. The LPA has apprised itself of the value of these lands, and as a portion of their participation in the project, voluntarily agrees to make such lands available without further compensation. The DOT shall be responsible for acquisition of all other right of way. f. In connection with this project any real estate and rights to real estate necessary for right of way at the connection of any public road and a primary highway project, any access road or frontage road, or any permanent utility easements which are or which will be under the jurisdiction of the LPA may be acquired by the DOT, for and in the name of the LPA. Where acquired by contract the LPA will receive title from the contract seller and the LPA will accept title thereto.Where acquired by condemnation, a single joint condemnation proceeding will be instituted by the DOT to acquire real estate or rights in real estate needed by the LPA for the LPA and to acquire real estate or rights in real estate needed by the DOT for the DOT. g. Access rights may be acquired by the DOT along all public road intersections within the project limits. Access rights, if acquired,will be in the name of the State of Iowa. The acquisition of access rights will be in accordance with 761 Iowa Administrative Code Chapter 112 and the DOT Access Management Policy. If access rights are required,the LPA shall not permit any third party to use the controlled portion of the side road without the prior written consent from the DOT. If the LPA feels that it is in the best interest of the parties involved to modify the access rights in any way, they may petition the DOT District 6 Engineer to do so. 3. General Provisions a. If the LPA has completed a Flood Insurance Study(FIS)for an area which is affected by the proposed Primary Highway project and the FIS is modified, amended or revised in an area affected by the project after the date of this Agreement,the LPA shall promptly provide notice of the modification, amendment or revision to the DOT. If the LPA does not have a detailed Flood Insurance Study(FIS)for an area which is affected by the proposed Primary Highway project and the LPA does adopt an FIS in an area affected by the project after the date of this Agreement,the LPA shall promptly provide notice of the FIS to the DOT. b. The LPA will comply with all provisions of the equal employment opportunity requirements prohibiting discrimination and requiring affirmative action to assure equal employment opportunity as required by Iowa Code Chapter 216. No person will, on the grounds of age, race, creed, color, sex, sexual orientation, gender identity, national origin, religion, pregnancy, or disability, be excluded from participation in, be denied the benefits of, or be otherwise subjected to discrimination under any program or activity for which State funds are used. c. It is the intent of both (all) parties that no third party beneficiaries be created by this Agreement. d. If any section, provision, or part of this Agreement shall be found to be invalid or unconstitutional, such finding shall not affect the validity of the Agreement as a whole or any section, provision, or part thereof not found to be invalid or unconstitutional, except to the extent that the original intent of the Agreement cannot be fulfilled. 2017-1-263—Fairfax(002) 2 July 2014 e. This Agreement may be executed in (two) counterparts, each of which so executed will be deemed to be an original. f. This Agreement, as well as the unaffected provisions of any previous agreement(s), addendum(s), and/or amendment(s); represents the entire Agreement between the LPA and DOT regarding this project.All previously executed agreements will remain in effect except as amended herein. Any subsequent change or modification to the terms of this Agreement will be in the form of a duly executed amendment to this document. IN WITNESS WHEREOF, each of the parties hereto has executed Agreement No. 2017-1-263 as of the date shown opposite its signature below. CITY OF FAIRFAX: By: �� ., _ Date , 20j Title. Mayor 1, I> Yrr� '(�Ui , certify that I am the Clerk of the City, and that 41&UO Abu d�!! �r� T�1 i 0,I]e �1 ,who signed said Agreement for and on behalf of U yG the City was duly authorized to execute the same on the day of �� , 20 9 0 Signed: City, Jerk of Fairfax, Iowa IOWA DEPARTMENT OF TRANSPORTATION: A f By: �, 2JXIe�) Date20k Jaifies R. Schnoebelen District Fngineer District 6 2017-1-263—Fairfax(002) 3 1111111 I III III IIIIIlIIII IIIA Ilill VIII VIII VIII illll 1111111111111111111111 Doc ID: 022818520002 Type: GEN Recorded: 05/05/2017 at _04:13:48 PIS Fee Amt: Moo Pane 1 of 2 Revenue Tax: $0.00 Linn County Iowa JOAN MCCALt1ANT RECORDER Prepared By: Limn Comity Secondary Road Dept., 1888 County Home Rd, Marion, IA 52302, (319)892-6400 Return To: Linn County Auditor, 935 2011 Street SE, Cedar Rapids, IA 52404,(319)892-5300 COUNTY AND CITE' PROXECT AGREEMENT This agreement entered into this --L- day of l4 ,: , by and between Linn County, Iowa, hereinafter referred to as County, and the City of Fairfax, hereinafter referred to as City. WHEREAS, both the County and the City are a public agency as is defined by Section 28E.2 of the Code of Iowa, and WHEREAS, Section 28E.3 of the Code of Iowa provides that any power or powers, privileges or authority exercised or capable of exercise by a public agency of the State of Iowa may be exercised and enjoyed jointly by a public agency of the State of Iowa having such power or powers, and WHEREAS, it is proposed, that the County plan, design and let for bidding a construction project to repair and overlay with Portland Cement Concrete (PCC) the existing pavement, shoulder and apply pavement markings on shared portions of 801" Street SW, and WHEREAS, the City Council and the County Board of Supervisors have informed themselves as to the proposed improvement. IT IS NOW AGREED that the City of Fairfax and Linn County enter into an agreement pursuant to Chapter 28E of the Code of Iowa providing for cooperative action pursuant to the proposed roadway construction project and, said cooperative actions include the following: 1) SCOPE OF WORK - Design, let and construct improvements to 80al Street SW per plans and specifications produced by the Linn County Engineer. Work is. to include concrete overlay, granular shoulder, pavement marking, staking, inspection, and other items to complete the project. Other items may incliude grading, patching, culvert extensions or replacements, etc. 2) DURATION - This Agreement shall commcirce on the date that both parties sign this agreement and Shall continue thereafter until the final completion of the project and settlement of the financial conditions of this agreement. 3) PURPOSE - The purpose of this Agreement is to accomplish the proposed project as described herein in accordance with the aforesaid scope of work and in agreement with conditions specified in this Agreement. G:\City of Fairfax)bocnmenis\City Cormcil\2017\Supporting Documents\Fairfax - 80th Street SW Paving 28E.doex Pager nt2