Loading...
HomeMy WebLinkAboutRESOLUTION NO. 2017-61 RESOLUTION NO. 2017-61 RESOLUTION TO APPROVE CHANGE ORDER NO. 1 FROM SCHRADER EXCAVATING AND GRADING CO. FOR THE 2017 80' STREET WATER MAIN EXTENSION PROJECT IN THE CITY OF FAIRFAX, LINN COUNTY, IOWA WHEREAS, the City Council of Fairfax, Iowa has contracted with Schrader Excavating and Grading Co. for the 2017 80"'Street Water Main Extension Project within the corporate limits; and WHEREAS,Hall and Hall Engineers, Inc., has recommended approval of Change Order#1 as described below: ORIGINAL CONTRACT AMOUNT: $ 74,290.55 ORIGINAL CONTRACT COMPLETION DATE: 15 Working Days ITEM #1: Clarification of Working Days vs. Calendar Days ITEM #2: Clarification of V Water Service Material This change order is to clarify two items in the project manual and plans from the original bid documents: • Duration of the project construction was listed as 15 Calendar Days under Section 00500, Article 4.02 A and Section 00800 Article SC-18.01 B of the original printed Specifications. Both of these places should read "15 Working Days" instead of Calendar Days to ensure consistency with Section 00100. This is a zero dollar clarification item that was discussed with and approved by all potential bidders prior to opening the bids. • On Sheet C.01 of the approved plans, under the Estimate Reference Information for Line Item 13, "Water Service, 1", it lists the material for the service pipe as PVC. The material for the pipe shall be HDPE Poly Technology Blue Ultra Pipe, or Engineer-Approved Equal. The total adjusted Change Order 1 amount is $0.00. Original Contract Amount: $ 74,290.55 C.O. #1 $0.00 Revised Contract Amount: $74,290.55 NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Fairfax, Iowa, to approve Change Order No. 1 from Schrader Excavating and Grading Co. for the 2017 80"' Street Water Main Extension Project for no contract amount change keeping the contract amount $74,290.55. BE IT FURTHER RESOLVED, by the Fairfax City Council of the City of Fairfax, Iowa, that the Mayor and City Clerk/Treasurer are hereby authorized and directed to execute said resolution. Passed and approved this 11th day of July, 2017. AYES: Beer, Daly, Kell, Volk, and Wainwright NAYS: None urnell G. Frieder, Mayor ATTEST: C e`1{®®; aa•1fOp°°°ass eke ° Cynt is K. Stimson, City Clerk/Treasurer14 ` fey . Aga CHANGE ORDER NO. 1 PROJECT: 2017 801h Street Water Main Extension DATE: June 14, 2017 CONTRACTOR: Schrader Excavating and Grading Co. 1840 Commercial Drive Walford, Iowa 52351 ORIGINAL CONTRACT AMOUNT: $ 74,290.55 ORIGINAL CONTRACT COMPLETION DATE: 15 Working Days ITEM #1: Clarification of Working Days vs. Calendar Days ITEM #2: Clarification of 1"Water Service Material This change order is to clarify two items in the project manual and plans from the original bid documents: • Duration of the project construction was listed as 15 Calendar Days under Section 00500, Article 4.02 A and Section 00800 Article SC-18.01 B of the original printed Specifications. Both of these places should read "15 Working Days" instead of Calendar Days to ensure consistency with Section 00100. This is a zero dollar clarification item that was discussed with and approved by all potential bidders prior to opening the bids. • On Sheet C.01 of the approved plans, under the Estimate Reference Information for Line Item 13, "Water Service, 1", it lists the material for the service pipe as PVC. The material for the pipe shall be HDPE Poly Technology Blue Ultra Pipe, or Engineer-Approved Equal. The total adjusted Change Order 1 amount is $0.00 Original Contract Amount: $ 74,290.55 C.O. #1 $0.00 Revised Contract Amount: $74,290.55 Schrader Excavating and Grading Co. Hall & Hall Engineers, c. By: p �,�.--— By: Title:��-ar®c r� /•�✓.r+sw;�e®- Title: �+wa,Gar Date: .7 Date: City of airfax, Iowa By: d" Title: Date: