HomeMy WebLinkAboutRESOLUTION NO. 2017-65 RESOLUTION NO. 2017-65
RESOLUTION TO APPROVE PAY APPLICATION NO. 3 (FINAL) FROM
KW ELECTRIC, INC. FOR THE FAIRFAX TRAIL LIGHTING
IMPROVEMENTS PROJECT IN FAIRFAX IOWA
WHEREAS, the City Council of Fairfax, Iowa has contracted with KW Electric,
Inc. for the Fairfax Trail Lighting Improvements Project within the corporate limits; and
WHEREAS, Hall and Hall Engineers, Inc., has recommended approval of Pay
Application No. 3 (Final) from KW Electric, Inc. for a current payment due of$22,312.50.
NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of
Fairfax, Iowa, to approve Pay Application No. 3 (Final) from KW Electric, Inc. for the
Fairfax Trail Lighting Improvements Project and issue a check for $22,312.50 after 30
(thirty) days have elapsed from this date.
BE IT FURTHER RESOLVED, by the Fairfax City Council of the City of
Fairfax, Iowa, that the Mayor and City Clerk/Treasurer are hereby authorized and directed
to execute said resolution.
Passed and approved this 11th day of July, 2017.
AYES: Beer, Daly, Kell, Volk, and Wainwright
NAYS: None
n
Burnell G. Frieden, Mayor
ATTEST:
r6�� Pale
®e A�
y hia Stimson, City Clerk/Treasurer t"
3
�i
��i
APPLICATION FOR PAYMENT
APPLICATION NO. 03 (FINAL)
Project: Fairfax Trail Lighting Improvements
City of Fairfax
Contractor: KW Electric Inc.
1127 Lincoln Street P.O. Box 967
Cedar Falls, Iowa 50613
Owner: City of Fairfax, Iowa
Original Contract
Amount: $54,900.00
Revised Contract
Amount: $69,500.00
Date: July 5, 2017
The Contractor noted above, in accordance with the provisions of the contract documents, hereby requests
approval of this application for payment on the following estimates of contract work completed:
Original Contract Work Completed $ 56,400.00
Materials Stored On Site $ -
Change Orders:
Change Order No. Date Approved Amount
1 Au ust 23, 2016 $ 1,100.00
2 October 19, 2016 $ 13,500.00
Total Change In Contract Amount from Change Ordersl $ 14,600.00
Total Change Order Work Completed $ 14,600.00
Total Complete and Stored to Date $ 71,000.00
Retainage 0% $ -
Total Complete and Stored to Date Less Retainage $ 71,000.00
Less Previous Payments $ 48,687.50
Current Payment Due $ 22,312.50
Distribution: Owner Engineer Contractor Other
Page 1 of 3
CONTRACTOR'S CERTIFICATION:
APPLICATION NO. 03 (FINAL)
,.4depresentative:Contractor's Auth
By: Date:QW--4\Kdt, V. P.
ENGINEER'S/ARCHITECT'S RECOMMENDATION:
In accordance with the provisions of the Contract Documents and based on the Engineer's/Architect's on-
site observations of the work included in this Application for Payment and based on the
Engineer's/Architect's review of this Application for Payment including the accompanying supporting data,
and to the best of the Engineer's knowledge, information and belief, the work included in this Application
for Payment is completed substantially in conformance with the Contract Documents and payment by the
Owner is hereby recommended.
Engineer's/Architect's Au ize Repr e tative_
By: Date:
CITY OF FAIRFAX PAYMENT RECOMMENDATION:
Payment to the Contractor is he recommended based on the Application for Payment submitted by
the Contractor and the Engineer's/Architect's recommendation.
City of Fairfax Authorized Representative:
By. ' ®` Date: Z�f ' 12
ATTACHMENTS REQUIRED:
1. Line Item Schedule of Contract Values Summary, Amounts Completed This Period, and Amounts
Completed To Date. Recommend use of AIA Document G703.
2. Line Item Schedule of Contract Materials Stored and Values (if applicable).
ACCOUNTING USE ONLY:
Page 2 of 3
APPLICATION FOR PAYMENT
APPLICATION NO.03(FINAL)
Project: City of Fairfax
Contractor: KW Electric Inc.
Engineer: Hall&Hall Engineers,Inc.
Revised Contract Amount: $69,500.00
Date: July 5,2017
Bid Did Prices This Period To Date
Item Item Description Units Quantities Unit Price Total Quantity Amount Quantity Amount %Complete
1 Mobilization LS 1 $ 2,800.00 $2,800.00 0.000 $0.00 1.00 $2,800.00 100.00%
2 Traffic Conb01 LS 1 $ 500.00 $500.00 0.000 $0.00 1.00 $500.00 100.00%
Lighting Poles,16',With LED Luminaires EA 9 $ 2,250.00 $20,250.00 0.000 $0.00 9.00 $20,250.00 100.00%
3 Indudes Footeigs and Fixtures
Lighting Poles,25',With 2 LED Luminaires
4 Includes Footings and Fixtures)
ixtures EA 2 $ 3,250.00 $6,800.00 0.000 $0.00 2.00 $6,500.00 100.00°0
5 Electrical Circuits as per plans' LF 1550 $ 11.00 $17,050.00 0,000 $0.00 1,550.00 $17,050.00 100.00%
6 Handhole,lDOT a-103 EA 2 $ 775.00 $1,550.00 0.000 $O.OD 2.00 $1,550.00 100.00%
7 Meter and Power Sup I Pedestal EA 1 $ 1,500.00 %1,500.00 1000 81500.00 2.OD $3,000.00 200.00%
Hydroseeding With Liquid Mulch Binder Type 4 LS 1 $ 4,750.00 $4,750.00 1000 $4,750.00 1.00 $4,750.00 100.00%
8 Perennial Ground Cover Mix
Total: 554,900.00 Monthly Total: $6,250.00 To Date Total: $56,400.00
MATERIALS STORED ON SITE
ITEM DESCRIPTION 1 UNITS QUANTITY PRICE PER UNIT TOTAL
TOTAL MATERIALS STORED ON SITEI $0.00
CHANGE ORDERS This Period To Data
NO. Description Unit Total Unit Price Total Quantity Amount Quantity Amount %Complete
Quantity
C01-1 Power audit added w fight PWo EA I1 $100.ar 51,190 OL 0100 $0.00 11,00 $1100-00 100.00%
CO2-1 Prid.e Li h. LS 1 $9.500.90 S5 590.9r 1,00 S9,500,00 1.00 S9,500.00 100.00%
CO2-2 Bag Field lx ht Sass,Pc!e and F.ledrical I.S 1 $4,00006 54.000 90 1.00 $4.000.00 1.00 S4.000,00 100.00%
TOTALS $14,600.00 $13,500.00 $14,600.00
REVISED CONTRACT TOTAL AFTER ALL C.O.(IF ANY)l $69,500.00 $56400.00 ORIGINAL CONTRACT WORK COMPLETED
$0.00 MATERIALS STORED ON SITE
$14,600.00 TOTAL CHANGE ORDER WORK COMPLETED
571000.00 TOTAL
0.00% 50.00 RETAINAGE
$71,000.00 TOTAL LESS RETAINAGE
$48.687.50 LESS PREVIOUS PAYMENTS
Page 3 of 3