HomeMy WebLinkAboutRESOLUTION NO. 2017-73 RESOLUTION NO. 2017-73
RESOLUTION ACCEPTING THE PUBLIC IMPROVEMENTS TO
PRAIRIE CREEK ESTATES EIGHTH ADDITION TO FAIRFAX, LINN
COUNTY, IOWA
WHEREAS, Hall and Hall Engineers, Inc. has performed part-time field observations
during the installation of the public improvements, reviewed material test reports, and has
completed a final site inspection of the public infrastructure, and Hall and Hall Engineers, Inc.
recommends acceptance of these public improvements with the following condition:
That the following items are all addressed within a timely manner (as considered by the City),
otherwise the City may withhold building permits on any lot within the Prairie Creek Estates
Eighth Addition to Fairfax, Linn County, Iowa:
1. Submit As-Built Plan of Improvements.
2. Please make sure that all of the water main and fire hydrant gate valve boxes are straight
and adjusted to grade.
3. Touch up seeding in the bare and sparsely vegetative areas.
4. Permanently seed and establish 100% ground cover in the private storm water detention
pond located in the back of Lots 2 and 3.
5. Address the following issues with the storm sewer system:
a. Clean out the storm sewer system, including the private storm sewer lines, and the
existing downstream storm sewers /intakes as necessary.
b. There has been some discussion of the subdrain services possibly being cut with
the installation of the franchise utilities. In viewing the subdrain connections at
the intakes, they looked pretty good, except for the subdrain connection located at
the upstream side of Intake 1-1. This subdrain stub has a fair amount of sediment
in it, indicating that soils are entering the upstream subdrain or subdrain services.
Locate where this subdrain and/or subdrain services are damaged and replace the
damaged sections with new subdrain, and granular backfill, if necessary.
c. Intake I-4 has a storm sewer stubbed out of the north side of this box. The plan of
Improvements do not indicate a storm sewer along the east side of Ridge View
Drive between Intake I-4 and Intake I-2A, but the plans do indicate a 6-inch
subdrain between these intakes. The downstream (southwest) side of Intake I-2A
has a storm sewer outlet that appears to drain to Intake I-3 (per the plans), and this
intake also has a 6-inch subdrain stubbed into it,just above this storm sewer (per
the plans). The storm sewer was likely stubbed out of the north side of Intake I-4
with the Prairie Creek Estates Fifth Addition improvements, and the 6-inch
subdrain is likely connected into this storm sewer stub. There is significant
sediment in this storm sewer stub that is separate from the other sediment within
this intake, indicating that this sediment is coming from either the connection of
this storm sewer stub and the 6-inch subdrain, from the upstream 6-inch subdrain,
or from possible cut subdrain services located along the upstream stretch of
subdrain. Determine whether or not this 6-inch subdrain and/or subdrain services
are damaged, and if so, replace the damaged sections with new subdrain, and
granular backfill, as necessary. Also verify the connection of the 6" subdrain with
the storm sewer stub. If this connection is maintained, then it should be sealed
with a concrete collar.
NOW, THEREFORE BE IT RESOLVED, by the City Council of the City of Fairfax,
Iowa, that the public improvements in Prairie Creek Estates Eighth Addition to Fairfax, Linn
County, Iowa are accepted by the City of Fairfax with the following condition:
That the following items are all addressed within a timely manner (as considered by the City),
otherwise the City may withhold building permits on any lot within the Prairie Creek Estates
Eighth Addition to Fairfax, Linn County, Iowa:
1. Submit As-Built Plan of Improvements.
2. Please make sure that all of the water main and fire hydrant gate valve boxes
are straight and adjusted to grade.
3. Touch up seeding in the bare and sparsely vegetative areas.
4. Permanently seed and establish 100% ground cover in the private storm water
detention pond located in the back of Lots 2 and 3.
5. Address the following issues with the storm sewer system:
a. Clean out the storm sewer system, including the private storm sewer
lines, and the existing downstream storm sewers /intakes as necessary.
b. There has been some discussion of the subdrain services possibly
being cut with the installation of the franchise utilities. In viewing the
subdrain connections at the intakes, they looked pretty good, except for
.the subdrain connection located at the upstream side of Intake I-1.
This subdrain stub has a fair amount of sediment in it, indicating that
soils are entering the upstream subdrain or subdrain services. Locate
where this subdrain and/or subdrain services are damaged and replace
the damaged sections with new subdrain, and granular backfill, if
necessary.
c. Intake 1-4 has a storm sewer stubbed out of the north side of this box.
The plan of Improvements do not indicate a storm sewer along the east
side of Ridge View Drive between Intake I-4 and Intake I-2A, but the
plans do indicate a 6-inch subdrain between these intakes. The
downstream (southwest) side of Intake I-2A has a storm sewer outlet
that appears to drain to Intake I-3 (per the plans), and this intake also
has a 6-inch subdrain stubbed into it,just above this storm sewer (per
the plans). The storm sewer was likely stubbed out of the north side of
Intake 1-4 with the Prairie Creek Estates Fifth Addition improvements,
and the 6-inch subdrain is likely connected into this storm sewer stub.
There is significant sediment in this storm sewer stub that is separate
from the other sediment within this intake, indicating that this
sediment is coming from either the connection of this storm sewer stub
and the 6-inch subdrain, from the upstream 6-inch subdrain, or from
possible cut subdrain services located along the upstream stretch of
subdrain. Determine whether or not this 6-inch subdrain and/or
subdrain services are damaged, and if so, replace the damaged sections
with new subdrain, and granular backfill, as necessary. Also verify the
connection of the 6" subdrain with the storm sewer stub. If this
connection is maintained, then it should be sealed with a concrete
collar; and
BE IT FURTHER RESOLVED, by the City Council of Fairfax, Iowa, that the Mayor
and the City Clerk/Treasurer are hereby authorized and directed to execute said Resolution.
Passed and approved this 8"' day of August, 2017.
AYES: Beer, Daly, Kell, and Wainwright
NAYS: None
ABSENT: Volk
Burnell Frieden, Mayor
ATTEST:
Cy . Zia Stimson, City Clerk/Treasurer