HomeMy WebLinkAboutRESOLUTION NO. 2017-76 RESOLUTION NO. 2017-76 RESOLUTION TO APPROVE CHANGE ORDER NO. 3 FROM SCHRADER EXCAVATING AND GRADING CO. FOR THE 2017 80"' STREET WATER MAIN EXTENSION PROJECT IN THE CITY OF FAIRFAX, LINN COUNTY, IOWA WHEREAS, the City Council of Fairfax, Iowa has contracted with Schrader Excavating and Grading Co. for the 2017 80"'Street Water Main Extension Project within the corporate limits; and WHEREAS, Hall and Hall Engineers, Inc., has recommended approval of Change Order#3 as described below: ORIGINAL CONTRACT AMOUNT: $ 74,290.55 ORIGINAL CONTRACT COMPLETION DATE: 15 Working Days ITEM #1: Riser Sections to raise three (3) fire hydrants to adjusted slope grade. At the request of the City, Schrader Excavating installed an additional riser section on the existing fire hydrant at the northerly end of the existing 2016 water main extension, and an additional riser section on each of the hydrants installed under this project to bring them up to meet the new slope elevations. This change allows for easier use for the Fire Department in the event of emergency. The total cost of this Change Order includes all additional materials and labor to complete this addition to the project. Please see the attached Change Order Request Form provided by Schrader Excavating for additional details. The total adjusted Change Order 3 amount is $3,455.00 Original Contract Amount: $ 74,290.55 C.O. #1 $0.00 C.O. #2 $0.00 C.O. #3 $3,455.00 Revised Contract Amount: $77,745.55 NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Fairfax, Iowa, to approve Change Order No. 3 from Schrader Excavating and Grading Co. for the 2017 8011' Street Water Main Extension Project an additional $3,455.00 to the contract, making the current contract amount $77,745.55. BE IT FURTHER RESOLVED, by the Fairfax City Council of the City of Fairfax, Iowa, that the Mayor and City Clerk/Treasurer are hereby authorized and directed to execute said resolution. Passed and approved this 12th day of September, 2017. AYES: Beer, Kell, Volk, and Wainwright NAYS: None ABSENT: Daly Burnell G. Frieden, Mayor ATTEST: Cynt ua {. Stimson, City Clerk/Treasurer �` ,•�'` K 4� x 4 N CHANGE ORDER NO. 3 PROJECT: 2017 8011 Street Water Main Extension DATE: September 5, 2017 CONTRACTOR: Schrader Excavating and Grading Co. 1840 Commercial Drive Walford, Iowa 52351 ORIGINAL CONTRACT AMOUNT: $74,290.55 ORIGINAL CONTRACT COMPLETION DATE: 15 Working Days ITEM#1: Riser Sections to raise three (3)fire hydrants to adjusted slope grade. At the request of the City, Schrader Excavating installed an additional riser section on the existing fire hydrant at the northerly end of the existing 2016 water main extension, and an additional riser section on each of the hydrants installed under this project to bring them up to meet the new slope elevations. This change allows for easier use for the Fire Department in the event of emergency. The total cost of this Change Order includes all additional materials and labor to complete this addition to the project. Please see the attached Change Order Request Form provided by Schrader Excavating for additional details. The total adjusted Change Order 3 amount is$3,455.00 Original Contract Amount: $74,290.55 C.O.#1 $0.00 C.O.#2 $0.00 C.O.#3 $3,455.00 Revised Contract Amount: $77,745.55 Schrader.Excavating and Grading Co. Hall & Hall Engineers, C. By: By: Title: Project Manager Title. �'20JiC ;r "aA-yz Date: 9/6/2017 Date: e)l 7/Z o City 91airfax, Iowa c By, , Title: �Gi Date: `� `�