Loading...
HomeMy WebLinkAboutRESOLUTION NO. 2019-77 RESOLUTION NO. 2019-77 RESOLUTION TO APPROVE EXTRA WORK ORDER(EWO) NUMBERS 1,2 AND 5 FOR THE U.S. HIGHWAY 151 BRIDGE REPLACEMENT PROJECT IN THE CITY OF FAIRFAX,LINN COUNTY,IOWA WHEREAS,the City of Fairfax,Iowa has entered into an agreement with the Iowa Department of Transportation (IDOT) to participate in the U.S. Highway 151 Bridge Replacement Project for the extension of the City's Sanitary Sewer System and the City's Water Main System west of and under U.S. Highway 151, as well as other public improvements to be constructed as part of this project that are the responsibility of the City of Fairfax; and WHEREAS, The Bid Price by Peterson Contractors, Inc. for the City of Fairfax Participation Items was $208,916.47; and WHEREAS, Peterson Contractors, Inc. has submitted Three Extra Work Orders (EWO) as described below: EWO No. 1 — Changes the proposed City Water Main Extension under U.S. Highway 151 at Church Street to increase the size of this Water Main and Water Main casing pipe from an 8"diameter Water Main to a 12"diameter Water Main: Price Increase of$1,626.90; EWO No. 2 —Changes to the Sanitary Sewer Alignment under U.S. Highway 151 at Church Street to Increase the future capacity of this sewer main and allow for necessary future sewer improvements to the existing downstream sanitary sewer system: Price Increase of$7,184.15; EWO No. 5 — Additional 6" diameter Water Main pipe between the Water Main Line along Highway 151 and the two relocated Fire Hydrants near Casey's General Store: Price Increase of$1,330.56; and WHEREAS, Hall and Hall Engineers, Inc., has recommended approval of EWO No's 1, 2, and 3 as described above. CONTRACTORS BID CITY PARTICIPATION AMOUNT: $208,916.47 EWO NO's 1, 2,AND 5 AMOUNTS: $10,141.61 REVISED PARTICIPATION AMOUNT: $219,058.08 NOW, THEREFORE, BE IT RESOLVED, by the City Council of the City of Fairfax, Iowa, to approve Extra Work Order No's. 1, 2, and 5 from Peterson Contractors, Inc. for the U.S. Highway 151 Bridge Replacement Project in the total amount of $10,141.61, bringing City of Fairfax's participation amount in this project to $219,058.08. BE IT FURTHER RESOLVED, by the Fairfax City Council of the City of Fairfax, Iowa,that the Mayor and City Clerk/Treasurer are hereby authorized and directed to execute said resolution. Passed and approved this 10th day of December, 2019. AYES: Otto, Daly, Volk, and Wainwright NAYS: None One seat is vacant. Burnell G. Frieden, Mayor ATTEST: urn Cy ma K. Stimson City Clerk/Treasurer �4 B SS n•Y. 1 r 'Je t