Loading...
HomeMy WebLinkAbout09/06/1961 Council Minutes 179. : .1 Septa 6, 1061. The regular meeting of the town council was held this . 6th day of Sept. with. all councilmen present. except Zenisek. ` Mrs. Margaret Probst met. with the council in connection with damaged blacktop at the site of her service station. .: Some of this damage was a result of water construction and part from the recent highway widening project. :after various .facets of the problem was discussed, it was decided that the town would contribute some cold mix blacktop for patching the 'part of the effected area damaged by water construction. It was further decided that the town would attempt to contact the highway commission to see what they might do to repats their portion of the damage, with the thought that both jobs might be most economically done at the same time. Clerk instructed to contact either Van. Snyder, . . Loy . or Slenn Neyer in this regard. John Panes discussed the chances of the town buying an end loader with the council. "the `Price was $850.00 with a trade of the old grader. After some discussioh, a motion to buy the loader was made byEmanuel and seconded by Steinmetz. Upon vote being taken, there was two affirmative and two xKXxtixxx abstaining.. No action 't aken on this . further° until next meeting. On motion by Nemec, seconded by Vanecek, and unanimously approved, it was voted to amend ordinance no. to set the speed limit in business district to 20 mph rather than 25 molt as it now reade Motion by Steinmetz, seconded by Nemec ±x and unanimously approved to dispense with the second and third readings of this ordinance. Committee repotted nothing definite on the tap machine purchase. Council, now moved to the Legion hall where they met with Lechner, Nazette and P. & Z. Commission. Lechner discussed in detail the terms of a possible contract in connection with compensation to they engineer on a sww+rer job. It was estimated that costs of obtaining a completed assessment schedule for the town so that it could be decided whether or not the actual construction of 'sewer could be accomplished would cost in the vicinity of $11800.,00, but Whis could vary one way or the other, since it is a cost"plus" job. Other work amounting to about $600.00 as per contract would put the total engineering fee to approximately $2 ,600,00 accrued up to the point where a d�finite decision could be reached in regard to the financial feasibility of sewer construction. Lechner also discussed the location and function of a package sewer treatment plant to be desired by Ia. Fund and located north and east. `of the quarry. Lechner would fu.rnishthe town with a completed plat request .by Septa 129 he thought, This temporary, treatment plant would -accomodate about 60 hordes., and would just be used until the 'town .obtained their own system. In the meantime, it would be operated by the town, and the town m uld charge a sewage rental from its users. No further business, it was moored, 'seconded and ;approved to adjourn. Navor Clerk