Loading...
HomeMy WebLinkAbout09-15-2009 Special Meeting CITY OF FAIRFAX SPECIAL CITY COUNCIL METING SEPTEMBER 15, 2009 The special meeting of the Fairfax City Council was held Tuesday, September 15, 2009, at Fairfax City Hall, Mayor Voss called the meeting to order at 5.:34 PM. Council members present: JoAnn Beer, Bernie Frieden, Jason Rabe, Marc Magers, and Marianne Wainwright. Other city staff present: Cynthia Stimson and Nancy Flickinger. Motioned by Magers, seconded by Rabe to approve the agenda. Ayes: Beer, Frieden, Rabe, Magers, and Wainwright. Motion carried. Dick Ransom explained that the IDOT is requiring a geotechnical study, recommendation, and compaction testing along the highway embankment retaining wall as part of our Water Main Replacement Program, Phase I improvements Project. Hall and Hall have met with the 1DOT and learned they are concerned about the retaining wall as well as the integrity of the slope. Terracon has submitted a cost estimate of$9,800 - $12,300 for this work... Shane Wicks presented a list of anticipated costs from Rathje Construction for this part of the project. They will submit a change order for any additional costs at a later meeting. Discussion was held about the cost of the project, funding, and timing. Motioned by Magers,seconded by Rabe to approve hiring Terracon for the required analysis and testing during the Water Main Replacement Program,Phase I improvements Project along the IDOT retaining wall as outlined in their cost estimate„ Ayes: Beer, Frieden, Rabe, Magers, and Wainwright. Motion carried. JoAnn Beer asked that a newsletter article be written about motorized vehicles in the parks and that signs be placed in all of the parks. Nancy Flickinger stated that the demolition of the Emerson property should happen as soon as proper notifications are made. Mayor Voss stated that the water tower should be back in service by September 25. Motioned by Magers,seconded by Rabe to adjourn the meeting. Ayes: Beer, Frieden, Rabe, Magers, and Wainwright. Motion carried. Mayor Voss adjourned the meeting at 5:59 PM. Mayor Bill Voss City Clerk Cynthia Stimson Disclaimer: The foregoing minutes are not official until approved by the City Council. EXHIBIT G .TE'kFZAC0N BUDGET ESTIMATE sl$f2�c1 GEOTECHNICAL ENGINEERING &CONSTRUCTION MATERIALS TESTING Proposed Williams Boulevard Water Main Fairfax,IowaF_ UNIT s., iQESCRIPTION QIUANTiTY UNIT PRICES _ TOTAL COST FIELD SERVICES (anticipate 4 borings @ 30 to 60 feet) Truck-;Mounted Drill Rig - day $375,00 $ - - All-T'erraln Drill Rig 1 - 1 day $475.00 $ 475.00 - 475.00 Auger Drilling&Sampling (0-20ft.) 80 - 80 font $12.50 $ 1,000.00 - 1,000.00 Auger Drilling&Sampling (20-40ft.) 60 - 60 foot $13.50 $ 810.00 - 810.00 Auger Drilling&Sampling (40-80ft.) 301 - 30 foot $14.50 $ 435.00 - 435.00 Hollow Stem Augers-Mud rotary 110 - 170 foot $3,00 $ 330.00 - 510.00 Hand Bedrock trilling - foot $26,00 - - - Location and Elevation of Borings* 1 0.5 - 0.5 hour $125.00 $ 62.50 - 62.50 Traffic Control and Permits 1.0 - 1.0 L.S. $400.00 $ 400.00 - 400.00 Drilling Supervisor 3.0 - 5.0 hour $80.00 $ 240.00 - 400.00 Field Density Technician 30.0 - 48.0 hour $48.00 $ 1,440.00 - 2,304.00 Field'Density Tests 40.0 - 50.0 each $5.00 $ 200.00 - 250.00 Vehicle Charge(Technician) 10.0 - 12.0 trip $25.00 $ 250.00 - 300.00 *Assumes Bali&Half will survey boring location after drilling Total $ 5,64.2.50 - 6,946.56 ESTIMATED FIELD SERVICES $1 5,650.00 $ 6,950.00 LABORATORY SERVICES (anticfpate obtaining about 38 samples) Stratification of Boring Log 3.0 - 5.0 hour $65.00 $ 195.00 - 325.00 Moisture Content 36 - 38 each $6.00 $ 216.00 - 228.00 Dry Density - 28 each $7.50 $ 180.00 - 210.00 Unconfined Compression Test 210 - 24 each $17.00 $ 340.00 - 408.00 HandllPenetrometer 116 - 20 each $100 $ 48,00 - 60.00 Plastic&Llquld Limits Test 3 - 4 each $50.00 $ 150.00 - 200.00 Organic Content-Loss on Ignition 11 - 2 each $50.00 $ 50.00 - 100,00 Laboratory Compaction(Std. Proctor) 2 - 3 each $100.00 $ 200.00 - 300.00 Total $ 1,379.00 - 1,831.00 ESTIMATED,LABORATORY SERVICES $ 1,400.00 $ 1,850.00 ENGINEERING SERVICES i Project Directlon, Data Reduction, Engineering Analyses and Evaluation,and Report(Preparation Principal Engineer, P.E. 3.0 - 5.0 hour $110.00 $ 330.00 - $ 550.00 Senior Project Engineer,P.E. 20.0 - 24.0 hour $99.00 $ 1,980.00 - $ 2376.00 Project Engineer 5,,0 - 6.0 hour $85.00 $ 425.00 - $ 510.00 i Draftsman 0.5 - 1.0 hour $50.00 $ 25.00 - $ 50.00 Secretarial Services I hour No Charge 1$ - - $ - Total $ 2,760.00 - 3,486.00; ESTIMATED ENGINEERING SERVICES $ 2,750.00 $ 3,500.00 TOTAL.ESTIMATED SERVICES $ 9,800.00 $ 12,300.00 NAPrapoW 20=0eoteth ProtwselSs[flfA9175.0806.Hell&Bell xdeleasa Scapa 305 44g1" Street P.O. Box 408 Marlon, rA 52,30:2 '. Office 1(319)377-3179 • Fax(319)377-3827 Date.; September 15,2009 Page 1 of 1 To: Brian Vogel Project: Watermain Replacement-Ph. I Hall&Hall Engineers Fairfax,Iowa 1860 Boyson Road Hiawatha,Iowa 52233 Re: Change Order Request 2 Revised Rath)e : 6064 Additional 12"water main along Railroad' .Additional 8"water main along Highway 151 Brian, Attached is the revised breakdown of additional costs for the added water main along Highway 151 and Railroad Street. The costs associated with additional compacting to achieve 95%compaction along Highway 151,and pulling a trench box the entire length of the pipe run from Church St.to Railroad St.,have been included in the per foot price for the 8"PVC water main. Any unsuitable soils encountered will be extra to correct in order to achieve 95%compaction. Cost for removal and replacement of unsuitable soils will be on a per cubic yard basis,and will be dependant on the type of imported backfill required. Any on-site drying of existing soils will also be extra to correct. Additional temporary sharing above and beyond the use of a trench box will be extra to install and remove, Item Description Est.Oty., -1 Unit unit Price Est.Total 5 8"PVC Watermain,wlpavement removal&replacement 781.00 LF $ 29.98 $ 23,414.38 6 12"PVC Watermain,wlpavement removal&replacement 623.00 LF $ 43.50.. $ 27,100.50 7 8"Watermain Gate Valve Assembly 4.00 Ea, $ 800.00 $ 3,600.00 8 12"Watermain Gate Valve Assembly 3.00 Ea. $ 1,600.00 $ 4,800.00 9 $"Watermain Blow Off Assembly 1.00 Ea. $ 600.00 $ 600.00 13 Water Services,V Copper,whew Stop&Box 6.00 Ea. $ 770'tl)' $ 4,620.00 15 Connect exist.Hydrant to new watermain(lead included) 2.00 Ea. $ 526.00 $ 1,050.00 18 New fire hydrant w/6"gate valve 2.00 Ea.. $ 3,200.00 $ 6,400.00 2-1 Remove and Replace Fence(Main to Church) 1.00 LS $ 1,100.00 $ 1,100.00 2-2 Slope Seeding along Highway 151 1.00 LS $ 420.00 $ 420.00 2-3 Erosion Control Mat on Highway 1.51 Slope 1A0 LS $ 365.00 $ 365.00 2-4 Confined space watermain installation from Main to Church 1.00 LS $ 2,195.00 $ 2195.00 Change Order Total $ 75,664.88 Please call if you have any questions. Respectfully, Loren Hartelt City of Fairfax Balance Sheet As of September 15, 2009 Sep 15, 09 ASSETS Current Assets Checking/Savings Fairfax Visioning 3,487.21 Certificates of Deposit General Fund 331,885.96 Sewer Fund 48,363.05 Total Certificates of Deposit 380,249.01 Checking Account Drainage/Detention Project 98,730.14 General Fund 662.24 Special Revenue Local Option 09, 58,830.47 Road Use Tax 89,409.79 Employee Benefits 10,357.74 TIF Fund 177,111.32 Total Special Revenue 335,709.32 Enterprise Fund!, Remote Meter (Read Project --3,700.82 Water Main Project 377,135.09 Water 67,353.70 Sewer 95,863.47 Garbage 15,884.41 Lagoon/WWTF (Project 5,782.33 SRF Bond Fund 53,584.20 Trust & Agency 16,395.00 Total Enterprise Fund 628,297.38 Total Checking Account 1,063,399.08 Savings Accounts Parks Dept - Guaranty 2,095.44 General - Murphey Land 16,510.87 Parks Department FFSB 4,984.16 Arbor Team 1,125.04 FD Equipment Memorial Fund3,980.07 Public Education 340,51 Regular Savings 12,677.76 Total FD Equipment 16,998.34 FD Fireworks 13,634.14 AGENDA FAIRFAX CITY COUNCIL SPECIAL MEETING TUESDAY, SEPTEMBER 15,2009 AT:5:30 PM FAIRFAX CITY HALL—525 VANDER][IILT STREET Tentative agenda with possible action on the following items: L Call to Order . Roil Call 3, Approval of Agenda 4. Water Main Replacement Program,Phase I Improvements Project, a. Additional Costs for Geotechnical Engineering&Construction Materials Testing—Terracon Estimate . Discussion a. Opportunity for citizens not on agenda, Clerk Comments 7. Mayor Comments g', Adjournment Fairfax City Council Agenda-September 15, 2009 Page 1 I STATE OF IOWA Counties of Linn and Johnson ss. CITY OF FAIRFAX SPECIIAL CITY COUNCIL MEETING SEPT)=MBER.15 ZR119 The speclal meeting of 1he Falrfax clly Jcouhell Was held Tuesday, Sep -: tombor 15,200 at Fatrfax CIN.Hall Mayor Woss.ulled Iheit lReting to or-. derl a1 5:84 o CouncD Tnembers pre- sen►. IoAnm Beer,Bernie PPreden.Ja I Dave Storey, do state that I am the publisher of ap Ma son:R %M4ersrand Marlanne , cvntWalatil. -Altaer clfv'slaff present: T GAZETTE, a daily 2Il1vWSpdper Of g Cvn.thlo Stimson and htancY Mlckinser general Motloped by Mabers; sRcanded by Retie to aPObve the e0enda. Ayes; circulation in Linn and Johnson Counties, in Iowa. B90 Frloden Reba, Magers, and Walnywrl4h#.Motion carried, The noticea printed c'(Ay[7 which 15 attached was &AIck Ransflrn explained that the MOT Is reauldha a geotechnical study recbrnmendatton, and coMpacllon inserted and published in THE GAZETTE newspaper teten4ralon4 the hlghv i.:em.mr.:W ter in the issues) of September 19th, 2009 retRlnlln� 'txalt as part rof aur Water:_ Main Reolacefnenl Program, Phase I Improvennents Proles}. Hall.and::Hall heve mat W1 the 000 and learned' Ihey are concerned abnu}lite relejping The reasonable Lo for publishing said nr,tice wall aye+�a�Rtl as the inte4rt#r nt the slaPe. TeOacon has subrnilted a cost'esti- $29 �9 ' n n mate ofs986�. 512,3411.fprfhlswork. shane t+Wleks'presemed a Ilsf of?ah- lieipalott costs from Rathie Construc ffon,for this marl❑f the Praleet, Theyl vrllt`aubmil a change order for any:A& coasts site la}er irieeling Atsbussann tas held aboW the cost of the prpieet,fuhding,and;tlming Motioned.br Magers; seconded by Retie to,aop7;ove hlrlftg Terracon`for. the required analysis and testlnS sturlm the;:Water :Main Replacement 'Pro- grapxt, Phase'f ttnprnY4Fnents ProInt along lhR MOT retaining wall ar wt-.: lined In their cast estimate.. 'Ayes:: Been i rledeit Rabe, `Ma4ers, and 4hlaleM^Ptgh#. Mat€oft rattled loAnn Beer asked that a nevasietter ar}icle be,vrlttero about motorized've hides In the?:#arks and ihat 316n5 be placed)in all of the parks. Nancy Filokinger stated that the de- rnotl}lon of fha Emerson Property should happef:oa soon.as proper notl}i- catlirns ata rtiade. Mayolr Voss stated That the haler tower Oould.be hack In:service':by Sepiembar 25:: Moto ad t3v the. ni Segg.:.:A by This instrument was acknowledged by Dave Storey Rade Jus adiovrn 1hR mleeting, Ayes: :'� Beer Friedo Rabe, Ma9ers, and:. Wal yof'hl. 4.016u ce.d th, before me on September 21st, 2009 Ma'Wor Wossadlourn,ed the.meeting al : l� 5:59:PM. Mayor BiII VosS City ClerNc Cynlhta S#lmson 61Sclatwner: The fgrR4ofng minutes-are not:otfdclaH unkit aPProyed 6Y the;Cily..- �` � -... Council. Notary Public in and for the State of Iowa Diane Gusta ornmisdon Numbar75J222 My Commission Expires. June 11,2011 City of Fairfax Balance Sheet As of September 15, 2009 Sep 15, 09 ASSETS Current Assets Checking/Savings Fairfax Visioning 3,487.21 Certificates of Deposit General Fund331,885.96 Sewer Fund 48,363.05 Total Certificates of Deposit 380,249.01 Checking Account Drainage/Detention Project 98,730.14 General Fund 662.24 Special Revenue Local Option +09 58,830.47 Road Use Tax 89,409.79 Employee Benefits 10,357.74 TIF Fund 1177,111.32 Total Special Revenue 335,709.32 Enterprise Fund Remote Meter Read Project -3,700.82 Water Main Project 377,135.09 Water 67,353.70 Sewer 95,863.47 Garbage 15,884.41 Lagoon[WWTF' Project 5,782.33 SRF Bond Funud 53,584.20 Trust & Agency 16,395.00 Total Enterprise (Fund 628,297.38 Total Checking Account 1,063,399.08 Savings Accounts Parks Dept - Guaranty 2,095.44 General - Murphy (Land 16,510.87 Parks Department FFSB 4,984.16 Arbor Team 1,125.04 FD Equipment Memorial Fund 3,980.07 Public Education 340.51 Regular Savings 12,677.76 Total FD Equipment 16,998.34 FD Fireworks 13,634.14 City of Fairfax Balance Sheet As of September 15, 2009 Sep 15, 09 Library Gifts & Bequests Memorials 1,911.63 Library Gifts & Bequests - Ot... 6,054.75 Total Library Gifts & Bequests 7,966.38 Local Option 2'004-2005 Sewer Improvements 60,403.73 Total Local Option 2004-2005 60,403.73 Total Savings Accounts 123,718.10 Total Checking/Savings 1,570,853.40 Total Current Assets 1,570,853.40' TOTAL ASSETS 1,570,853.40 LIABILITIES & EQUITY Equity 3000 • Opening Bal Equity 1,813,787.70 Net Income -242,934.30 Total Equity 1,570,853.40 TOTAL LIABILITIES & IEQUITY 1,570,853.40 AGENDA FAIRFAX CITY COUNCIL SPECIAL MEETING TUESDAY,SEPTEMBER 15,2009 AT 5:30 PM FAIRFAX CITY HALL-525 VANDERB`ILT STREET Tentative agenda with possible action on the following items: 1. Call to Order 2. Roil Call 3. Approval of Agenda 4. Water Main Replacement Program,Phase I Improvements Project: a. Additional Costs for Geotechnical Engineering&Construction Materials Testing—Terracoan Estimate 5. Discussion a. Opportunity for citizens not on agenda. Clerk Comments T Mayor Comments 8. Adjournment Fairfax City Council Agenda- September 15,2009 Page 1 STATE OF IOWA Counties of Linn and Johnson ss. CITY OF FAIRFAX ;SPECIAL CITY COUNCIL MEETING SEPTEMBM I5 3009 711e special meeting of the Fairfax CIN Count w6s held Tuesday, Sep- tember '1S, 01i9,a1 Fairfax CITY Hall meyor Voss:�alled fhe;fneeting_to or- der i15;34 13MCauncll members pre seni. JoAnn Beer,Bernie rriedenndMai .nne I Dave Store do state that 7 am the publisher of soFl'Rabe,Mal^CMagers,;anaMariahne °� r yr Walnvvmlghi other arty staff present; THE GAZE=, a daily newspaper of general Cyntta¢a atirrtason and Nancy Fllckingar. v Molloaed by Ma9ers;sAconded by ft11A to aRprove I the a0nda. Ayes: circulation in Linn and Johnson Counties, in Iowa. t3eerA Frteden, Rabei.'Mager% and Wanvvrlghfl.#J1oflan carrlea. The notice a printed copy of which is attached, was glpfC t2ahstsm explained that Ithe,i �t17OT is raquirin9 a geotectnleal study, recarnwimendatton, and compaction : inserted and published in THE GAZETTE newspaper feOno along the fiNhwar erhbankrgent retainti W.dl as part:of aur Water. in the issue(s) of September 19th, 2009 Main Rep#acernent Program, Phase I 16t.rovemenh.Prolecl, :Hall and Hall b0.0 met!#rift the lDOT and learned they ogre concerned abouf the retalnlnir C waif as well a5Ifie. fegrRy of the slope; The reasonable futi f bi puMill,flig sai J T ud, i c Terracen has-submllied a Costesi#- $29.19 mate of 119,t30p-i 12,300 for flits work. Shane Wtt}s presented a fist of;an I1cI_rrebw costs from Rathle construc- non for Mfg,part.of the.brolect, :Then:'. will`submtf a change order for any.ad- d#tlonatcosts tS atlatermeel3ng, . .: stosslon Was a held about the cast o.f Ihemrot ect,faarttlJn andtlming. Motioned by lagers seconded;by : Rabe to approve hirin9.Tsrracon far the`requla'edahalysls and testing during 1he.WelerMaln Replacement :Pro Ora. Phas.R A Improvements Prolecl along the)DOT.,retaining.Wail as:out- ltned'Ira thelr>Cast estlrnate Ayes::' Be o Fraeden, Rabe, :Mayers, and WOLPW'rlghf,Ration carried. IcsAnal Beer asked Jhal a newsletter articla be wrttteri abo111 molorixed ve- hicles in the;narks and;.that signsbe placed In roti i'fhe parks.:> talam O FIIckinger staled that the de- ma[lflorl of 1-the Ersiersan. property:: shoutd happen as saon'as.proper niotlfb callous:are made. Mayor vvss stated that the water lower should=:be back lin service'by September 25:: Malloned py Magersco ,sended'by Raba,la ad;ourn fie meerrny, Ayes; This instrument was acknowledged by Dave Storey Beg.,,,F"rioden Rabe, Magers, and WsnWrl9ht.Motion carried, before me on September 21st, 2009 Maysrr xdoss ;adaa,rned;ft,e meet€n4.at. 1� 5:59 P'M• Mayor ettt Vass Clfy ClemtCCynthla Stlmsop alsctalmmaler: 'aha faregping minutes are nol::officaaN until approved by fie City Council. v n Notary Public in and for the State of Iowa �"F''Al.matte Gust;a ®e tt'I~nmission Nunnber753222 My Commission Expires: vA Anp'i1,2011